Tender Archive
S.No. | Title | Issue Start Date | Issue Last Date | Submission Last Date | Opening Date | Opening Time | Status | View |
---|---|---|---|---|---|---|---|---|
1. | Gum Boots-Rubber and PVC(PUR-MOIl-C-1-187-WE-15-ET-67) | 17-05-2018 | 11-06-2018 | 11-06-2018 | 12-06-2018 | 03:30 PM | Active | View |
2. | Open e-Tender No. WE-10-ET-68 for purchase of IRON ORE with Transportation(WE-10 e-tender No.MOIL/18-19/ET-68, Dt.17.05.18) | 17-05-2018 | 19-06-2018 | 19-06-2018 | 20-06-2018 | 03:30 PM | Active | View |
3. | PURCHASE OF PUZZOLANA MAKE SPARES OF VIBRATING SCREEN(PUR/MOIL/C-11/135/E-02/108-M Dt. 17-05-2018) | 17-05-2018 | 08-06-2018 | 08-06-2018 | 08-06-2018 | 03:30 PM | Active | View |
4. | Repairing and making 170HP and 150HP Pump foundation, pump shed, misc. work North c section at TD01(TRD/Civil/2018-19/407) | 16-05-2018 | 22-05-2018 | 22-05-2018 | 22-05-2018 | 03:30 PM | Active | View |
5. | PCC to be carried out at -330 Level AT MUNSAR MINE.(7100000782/MUN/2018-19/469) | 16-05-2018 | 25-05-2018 | 25-05-2018 | 25-05-2018 | 04:30 PM | Active | View |
6. | Pushing and unloading of ROM and rock tubs in underground and on surface AT MUNSAR MINE.(7100000781/MUN/2018-19/468) | 16-05-2018 | 25-05-2018 | 25-05-2018 | 25-05-2018 | 04:30 PM | Active | View |
7. | Design Supply and Installation of mild steel n stainless steel piping work for both steam line and condensate line and Design Supply and Installation of dual laminated composite material trench n overflow bends for spent solution at EMD Plant, Dongri(MOIL | 16-05-2018 | 30-05-2018 | 30-05-2018 | 30-05-2018 | 03:30 PM | Active | View |
8. | Short term e-Tender for Purchase of Industrial Power Heater - 90 Nos. and 0-1200 degree C Thermocouple - 18 Nos.(2 Lots) for EMD plant, Dongri Buzurg Mine (Only Through e-procurement)(WE-31 (MOIL/18-19/ET/66) DT.15/05/2018) | 15-05-2018 | 24-05-2018 | 24-05-2018 | 25-05-2018 | 03:30 PM | Active | View |
9. | Construction of shed in D type bungalow at Munsar Mine (MUN/CIVIL/18-19/20 DT 13.05.2018) | 15-05-2018 | 15-05-2018 | 25-05-2018 | 25-05-2018 | 04:30 PM | Active | View |
10. | Purchase of Temperature Control Panel - 18 Nos.(1 Lot) for EMD plant, Dongri Buzurg Mine (Only Through e-procurement)(WE-30 (MOIL/18-19/ET/65) DT.15/05/2018) | 15-05-2018 | 24-05-2018 | 24-05-2018 | 25-05-2018 | 03:30 PM | Active | View |
11. | Construction of Stone Pitching Parapet Wall for Side slope Stability for Newely Diverted Hutch drain at ocf jig section at Balaghat Mine.(Civil/BGT/T.E./2018-19/81) | 15-05-2018 | 21-05-2018 | 21-05-2018 | 21-05-2018 | 04:30 PM | Active | View |
12. | PURCHASE OF Sensor Assembly for 1500 KVA, 11KV DG Set for CHIKLA MINE(TE-04 DT.14052018) | 15-05-2018 | 28-05-2018 | 28-05-2018 | 28-05-2018 | 04:30 PM | Active | View |
13. | Purchase of Ore-Petrology Microscope and Microscope Camera - 1 No.each (2 Lots) (Only Through e-procurement)(Purchase of Ore-Petrology Microscope and Microscope Camera - 1 No.each (2 Lots) (Only Through e-procurement)(WE-27 (MOIL/18-19/ET/64) DT.14/05/201 | 14-05-2018 | 25-06-2018 | 25-06-2018 | 26-06-2018 | 03:30 PM | Active | View |
14. | Filling and spreading work at haulage road Munsar Mine (Mining/MUN/18-19/417) | 14-05-2018 | 25-05-2018 | 25-05-2018 | 25-05-2018 | 04:30 PM | Active | View |
15. | Cleaning of sand from 170 L and 70 L at Munsar Mine (Mining/MUN/18-19/416) | 14-05-2018 | 14-05-2018 | 25-05-2018 | 25-05-2018 | 04:30 PM | Active | View |
16. | Construction of New Vehicle washing pit near workshop premises at Ukwa Mine(16/Civil/UM/18-19/338) | 14-05-2018 | 28-05-2018 | 28-05-2018 | 28-05-2018 | 04:30 PM | Active | View |
17. | Concreting work for Chamber Prepration at1850 level Ukwa Mine(16/Mining/UM/18-19/335) | 14-05-2018 | 28-05-2018 | 28-05-2018 | 28-05-2018 | 04:30 PM | Active | View |
18. | Providing Polymers Based Lining with acid referactory bricks at EMD Plant at Dongri Buzurg Mine(MOIL/18-19/ET/27) | 14-05-2018 | 28-05-2018 | 28-05-2018 | 28-05-2018 | 03:30 PM | Active | View |
19. | Design Supply and Installation of FRVE and HDPE piping work for supply of feed and spent solution and Insulation work including material for steam and condensate pipeline and One Condensate Tank at EMD Plant, Dongri Buzurg Mine(MOIL/18-19/ET/28) | 14-05-2018 | 28-05-2018 | 28-05-2018 | 28-05-2018 | 03:30 PM | Active | View |
20. | Cage Suspension Gear -3sets(C-12-12-WE26-ET-63 D.14-5-2018) | 14-05-2018 | 07-06-2018 | 07-06-2018 | 08-06-2018 | 03:30 PM | Active | View |
21. | Repairing and servicing of Actuators of Butterfly Valve of IMB Plant at Balaghat Mine (AGT/BGT/MECH/IMB/18-19/75 DTD 10.05.2018) | 12-05-2018 | 12-05-2018 | 25-05-2018 | 25-05-2018 | 04:30 PM | Active | View |
22. | Removal of spillage material accumulated during hoisting of skip from 15th Level of production shaft at Balaghat Mine (MOIL/18-19/ET/48) | 11-05-2018 | 11-06-2018 | 11-06-2018 | 11-06-2018 | 03:30 PM | Active | View |
23. | Underground Vertical Development and allied work at 1750 Level at Ukwa Mine (MOIL/18-19/ET/42) | 11-05-2018 | 11-06-2018 | 11-06-2018 | 11-06-2018 | 03:30 PM | Active | View |
24. | Washing picking and collection of material from West side of D Dump waste dump at Tirodi Mine (MOIL/18-19/ET/44) | 11-05-2018 | 11-06-2018 | 11-06-2018 | 11-06-2018 | 03:30 PM | Active | View |
25. | Picking and collection of material to recover Ferro Grade Ore KD 2272 from Dumps at Kandri Mine (MOIL/18-19/ET/45) | 11-05-2018 | 11-06-2018 | 11-06-2018 | 11-06-2018 | 03:30 PM | Active | View |
26. | Construction of Additions to Third Floor East and WestWings of MOIL Bhavan Nagpur (MOIL/18-19/ET/ 26) | 11-05-2018 | 12-06-2018 | 12-06-2018 | 12-06-2018 | 03:30 PM | Active | View |
27. | Laying of 6 G.I. Pipe line -180 mtrs and 4 G.I. Pipe line-180 mtrs in vertical shaft for pumping operation at Kandri Mine (MOIL/18-19/ET/31 ) | 11-05-2018 | 13-06-2018 | 13-06-2018 | 13-06-2018 | 03:30 PM | Active | View |
28. | TESTING OF HOT AND EOT CRANRS INSTALLED IN BALAGHAT MINE (BGT/MECH/CRANE-TEST/18-19/1050 ) | 11-05-2018 | 11-05-2018 | 22-05-2018 | 22-05-2018 | 4:00 PM | Active | View |
29. | Shifting of 3 phase 3 wire HT Overhead line of EMD Plant at Dongri Buzurg Mine. (ADGM/DB/EMD/ELECT/18-19/67) | 11-05-2018 | 11-05-2018 | 17-05-2018 | 17-05-2018 | 04:30 PM | Active | View |
30. | PURCHASE OF TRACK ROLLER ASSEMBLY FOR EIMCO ELECON MADE SIDE DUMP LOADER MODEL 625CR, PART NO- 1027C050000005 (PUR/MOIL/BGT/SDL/18-19/73 dtd 09.05.2018) | 11-05-2018 | 11-05-2018 | 24-05-2018 | 24-05-2018 | 04:30 PM | Active | View |
31. | Open e-Tender No. WE-09-ET-62 for purchase of PEARL COKE with Transportation (WE-09 e-tender No.MOIL/18-19/ET-62, Dt.11.05.18) | 11-05-2018 | 04-06-2018 | 04-06-2018 | 05-06-2018 | 03:30 PM | Active | View |
32. | Purchase of industrial power heaters for cells of EMD Plant at Dongri Buzurg Mine. (ADGM/DB/EMD/ELECT/18-19/66) | 10-05-2018 | 16-05-2018 | 16-05-2018 | 16-05-2018 | 4:00 PM | Active | View |
33. | Arc Flash Protective wear (PUR-MOIL-C-1-WE-25-ET-61) | 10-05-2018 | 11-06-2018 | 11-06-2018 | 12-06-2018 | 03:30 PM | Active | View |
34. | Shifting of 3 phase, 3 wire HT OH line and 11KV outdoor substation at Dongri Buzurg Mine (MOIL/18-19/ET/32 ) | 10-05-2018 | 10-05-2018 | 08-06-2018 | 08-06-2018 | 03:30 PM | Active | View |
35. | SUPPLY OF BLACK GITTI FOR CONCRETING AT CHIKLA MINE (TE-03 DT.08052018) | 09-05-2018 | 09-05-2018 | 15-05-2018 | 15-05-2018 | 04:30 PM | Active | View |
36. | Purchase of Geological Modelling, Mine Planning and Design Software for Four Modules i.e. Core, Tools, Geology and Surveying (WE-3 Dt.09/05/2018 (e-Tender No.MOIL/18-19/ET/60)) | 09-05-2018 | 12-06-2018 | 12-06-2018 | 13-06-2018 | 03:30 PM | Active | View |
37. | Design, Manufacture and Supply Plummer Block of Pinion shaft of Production Shaft winder of Balaghat Mine (BGT/MECH/PS/18-19/ 989) | 09-05-2018 | 24-05-2018 | 24-05-2018 | 24-05-2018 | 4:00 PM | Active | View |
38. | Open e-Tender No. WE-24-ET-56 for Purchase of copper bus bar, aluminium bus bar, Z bar and various type copper-aluminium bus with other electrical accessories for new Cell-Bay section at EMD PLANT, DONGRI BUZURG MINE (WE-24 e-tender No.MOIL/18-19/ET-56, D | 09-05-2018 | 09-05-2018 | 30-05-2018 | 31-05-2018 | 03:30 PM | Active | View |
39. | TENDER ENQUIRY FOR ANNUAL MAINTENANCE CONTRACT OF COMPUTER, LAPTOPS, PRINTER, UPS AND NETWORKS (SYS/HW MAINTENANCE/2018-19/2) | 09-05-2018 | 30-05-2018 | 30-05-2018 | 30-05-2018 | 3:00 PM | Active | View |
40. | Purchase of 550 H.P., 1000 RPM, Laminated Yoke, Shunt Wound, D.C.Motor - 2 Nos. for Double Drum Winder of Balaghat Mine (WE-23 (MOIL/18-19/ET/58) DT.09/05/2018) | 09-05-2018 | 09-05-2018 | 06-06-2018 | 07-06-2018 | 03:30 PM | Active | View |
41. | Purchase of Lead Steam Coil - 10 Nos. (1 LOT) for EMD Plant, Dongri Buzurg Mine (WE-18 (MOIL/18-19/ET/59) DT.09/05/2018) | 09-05-2018 | 14-06-2018 | 14-06-2018 | 15-06-2018 | 03:30 PM | Active | View |
42. | Purchase of Electrically Operated Travelling Crane - 1 No. (1 LOT) for EMD Plant, Dongri Buzurg Mine (WE-17 (MOIL/18-19/ET/57) DT.09/05/2018) | 09-05-2018 | 09-05-2018 | 05-06-2018 | 06-06-2018 | 03:30 PM | Active | View |
43. | Limited tender for Removal of spillage from the bottom of conveyor belt of 141/2 level Loading station Production Shaft (BGT/ Mech /spillage/18-19/ 456) | 08-05-2018 | 16-05-2018 | 16-05-2018 | 16-05-2018 | 5:50 pm | Active | View |
44. | PURCHASE OF SULPHATE TRANSFER PUMP 1 NO. AND CONDENSATE PUMP WITH MOTOR AND BASE FRAME 2 NOS. FOR EMD PLANT DONGRI BUZURG MINE (PUR/MOIL/C-4/78/E-8 /155 -M Dt.07.05.2018) | 08-05-2018 | 08-05-2018 | 21-05-2018 | 22-05-2018 | 03:30 PM | Active | View |
45. | Housekeeping inside the house premises of IMB Plant at Balaghat Mine (MOIL/18-19/ET/33) | 08-05-2018 | 22-05-2018 | 22-05-2018 | 22-05-2018 | 03:30 PM | Active | View |
46. | Construction of Stone Pitching Parapet Wall around Mine Dump Area behind Siding Region, Balaghat Mine. (Agent Sr DGM/Civil/BGT/18-19/981 Date 07.05.18) | 08-05-2018 | 17-05-2018 | 17-05-2018 | 17-05-2018 | 04:30 PM | Active | View |
47. | PURCHASE OF CONDENSATE TANK WITH ACCESSORIES - 1 NO. FOR EMD PLANT, DONGRI BUZURG MINE (PUR/MOIL/C-4/315 /E-7 /156-M) | 08-05-2018 | 21-05-2018 | 21-05-2018 | 21-05-2018 | 03:30 PM | Active | View |
48. | Purchase of MS Neoprene Rubber Lined Cell Feed Tank with Accessories - 1 No.(1 LOT) for EMD Plant, Dongri Buzurg Mine (WE-20(MOIL/18-19/ET/52) DT.08/05/2018) | 08-05-2018 | 04-06-2018 | 05-06-2018 | 05-06-2018 | 03:30 PM | Active | View |
49. | Purchase of Polypropelene Pad - 80 Nos.(1 LOT) for EMD Plant, Dongri Buzurg Mine WE-22(MOIL/18-19/ET/55) DT.08/05/2018 | 08-05-2018 | 31-05-2018 | 01-06-2018 | 01-06-2018 | 03:30 PM | Active | View |
50. | Purchase of Mild Steel Square Bar Cladded with Copper Sheet - 700 Nos.(1 LOT) for EMD Plant, Dongri Buzurg Mine (WE-21(MOIL/18-19/ET/54) DT.08/05/2018) | 08-05-2018 | 31-05-2018 | 01-06-2018 | 01-06-2018 | 03:30 PM | Active | View |
51. | Outsourcing of Industrial Pumping Operation in Underground Vertical Shaft of Munsar Mine (MOIL/18-19/ET/30 ) | 08-05-2018 | 08-06-2018 | 08-06-2018 | 08-06-2018 | 3:30 PM | Active | View |
52. | Washing picking and collection of material from waste reject crude from West side of 6 B at Tirodi Mine (MOIL/18-19/ET/34) | 08-05-2018 | 08-06-2018 | 08-06-2018 | 08-06-2018 | 03:30 PM | Active | View |
53. | Conveyor Belt (PUR-MOIL-C-12-20-WE-01) | 08-05-2018 | 07-06-2018 | 07-06-2018 | 08-06-2018 | 03:30 PM | Active | View |
54. | Outsourcing of Industrial Pumping Operation at UG level and OC of Kandri Mine (MOIL/18-19/ET/35 ) | 08-05-2018 | 08-06-2018 | 08-06-2018 | 08-06-2018 | 03:30 PM | Active | View |
55. | Underground development work at 450 Level at Kandri Mine (MOIL/18-19/ET/36) | 08-05-2018 | 08-06-2018 | 08-06-2018 | 08-06-2018 | 03:30 PM | Active | View |
56. | Underground Sump cleaning of Ukwa Mine i Vertical shaft UG section ii Ch.50 UG Section iii 9500 section and iv Ch.10800 (MOIL/18-19/ET/37) | 08-05-2018 | 08-06-2018 | 08-06-2018 | 08-06-2018 | 03:30 PM | Active | View |
57. | Purchase of Spent Transfer Pump, Model 40 /13QF (Mech.Seal Type) MOC R-55 - 2 Nos. (1 LOT) for EMD Plant, Dongri Buzurg Mine (WE-19(MOIL/18-19/ET/51) DT.08/05/2018) | 08-05-2018 | 07-06-2018 | 07-06-2018 | 08-06-2018 | 03:30 PM | Active | View |
58. | WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR DRUM ASSEMBLY OF LHD AND SDL MACHINES-MAKE EIMCO ELECON (PUR/MOIL/C-5/27/E-05/138-M Dt. 07/05/2018) | 07-05-2018 | 13-06-2018 | 13-06-2018 | 13-06-2018 | 03:30 PM | Active | View |
59. | PURCHASE OF STRAIN BAR FOR CHIKLA MINE (TE-641 DT.07052018) | 07-05-2018 | 22-05-2018 | 22-05-2018 | 22-05-2018 | 04:30 PM | Active | View |
60. | Maintenance of Gardens at Ukwa Mine. (16/Civil/UM/18-19/279) | 07-05-2018 | 07-05-2018 | 17-05-2018 | 17-05-2018 | 4:30 pm | Active | View |
61. | WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR SAYAJI JAW CRUSHER (PUR/MOIL/C-5/30/E-04/137-M Dt. 07/05/2018) | 07-05-2018 | 06-06-2018 | 06-06-2018 | 06-06-2018 | 03:30 PM | Active | View |
62. | Laying of 3C x 95Sqmm Cable from Main Vertical Shaft Subsation to 2nd level undergound for feeding supply to LHD(ELECT/MUN/ADGM/18-19/78) | 05-05-2018 | 12-05-2018 | 12-05-2018 | 12-05-2018 | 03:30 PM | Active | View |
63. | Purchase of Drilling Accessories for Electro Hydraulic Crawler Drill Machines at Chikla and Gumgaon Mine.(WE-01 e-tender No.MOIL/18-19/ET-46, Dt.04.05.18) | 04-05-2018 | 12-06-2018 | 12-06-2018 | 13-06-2018 | 03:30 PM | Active | View |
64. | Titanium Anode Plates - 256 Nos. (1 Lot) for EMD Plant Dongri Buzurg Mine (Only Through e-procurement)(WE-5 Dt.04/05/2018 (MOIL/18-19/ET/47)) | 04-05-2018 | 28-05-2018 | 28-05-2018 | 29-05-2018 | 03:30 PM | Active | View |
65. | WEBSITE TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPIRAL LINER -200 Nos.(PUR/MOIL/C-11/135/E-03/119-M Dt. 03-05-2018) | 04-05-2018 | 30-05-2018 | 30-05-2018 | 30-05-2018 | 03:30 PM | Active | View |
66. | WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR MATHER AND PLATT WATER PUMP.(PUR/MOIL/C-5/28/E-01/102-M Dt. 04/05/2018 | 04-05-2018 | 30-05-2018 | 30-05-2018 | 30-05-2018 | 03:30 PM | Active | View |
67. | Purchase of Manwinding Steel Wire Rope - 36 MM for Balaghat Mine - 1950 Mtr(WE-2 DT.03.05.2018 (e-Tender No. MOIL/18-19/ET/43) | 03-05-2018 | 28-05-2018 | 28-05-2018 | 29-05-2018 | 03:30 PM | Active | View |
68. | Purchase of Graphite Cathode Plates - 700 Nos. for EMD Plant, Dongri Buzurg Mine (1 Lot) (Only Through e-procurement)(WE-8 Dt.02/05/2018 (MOIL/18-19/ET/38)) | 02-05-2018 | 23-05-2018 | 23-05-2018 | 24-05-2018 | 03:30 PM | Active | View |
69. | Purchase of Zirconium Coil - 18 Nos. (1 Lot) for EMD Plant, Dongri Buzurg Mine (Only Through e-procurement)(WE-7 Dt.02/05/2018 (MOIL/18-19/ET/41)) | 02-05-2018 | 24-05-2018 | 24-05-2018 | 25-05-2018 | 03:30 PM | Active | View |
70. | Purchase of Lead Cathode Plates - 320 Nos. (1 Lot) for EMD Plant, Dongri Buzurg Mine (Only Through e-procurement)( WE-6 Dt.02/05/2018 (MOIL/18-19/ET/40)) | 02-05-2018 | 24-05-2018 | 24-05-2018 | 25-05-2018 | 03:30 PM | Active | View |
71. | Screening of siding debridge to produce 420 MT ORE on 590 MT Fines at Chikla Mine(TE/CH/agent/ch/mine/18-19/52) | 01-05-2018 | 15-05-2018 | 15-05-2018 | 15-05-2018 | 04:00 PM | Active | View |
72. | Providing and fixing of mosquito net door and vent to b and c type quarter of Munsar mine(MUN/CIVIL/18-19/16 DT. 30.04.2018) | 01-05-2018 | 11-05-2018 | 11-05-2018 | 11-05-2018 | 04:30 pm | Active | View |
73. | Providing and supply of 5core X 25Sqmm Trailing cable - 100Meters(GM/Elect/TE/18-19/325,Dated - 30.04.2018) | 01-05-2018 | 21-05-2018 | 21-05-2018 | 21-05-2018 | 03:30 PM | Active | View |
74. | Maintenance and operation of water supply scheme at Ukwa Mine.(16/Civil/UM/18-19/245) | 30-04-2018 | 15-05-2018 | 15-05-2018 | 15-05-2018 | 04:30 pm | Active | View |
75. | Maintenance and cleaning of New Administrative Building at munsar mine(MUN/MINING/18-19/116) | 29-04-2018 | 02-05-2018 | 02-05-2018 | 02-05-2018 | 03:30 PM | Active | View |
76. | Removing of loose Waste rock at 1850 level Ukwa Mine(16/Mining/UM/18-19/224) | 26-04-2018 | 10-05-2018 | 10-05-2018 | 10-05-2018 | 04:30 PM | Active | View |
77. | Trench Cutting of OCF stacks at Munsar Mine(MUN/MINING/18-19/115) | 24-04-2018 | 02-05-2018 | 02-05-2018 | 02-05-2018 | 03:30 PM | Active | View |
78. | Construction of New Building for Syndicate Bank Bharweli Branch at Balaghat Mine.( MOIL/17-18/ET/472) | 20-04-2018 | 21-05-2018 | 21-05-2018 | 21-05-2018 | 03:30 PM | Active | View |
79. | EXTRA EXCAVATION AT -370L FOR RCC SUPPORT AT CHIKLA MINE(PUR/MOIL/CH/18-19/01) | 19-04-2018 | 26-04-2018 | 26-04-2018 | 26-04-2018 | 03:30 PM | Active | View |
80. | Repairing and servicing of Actuators of Butterfly Valve of I.M.B Plant at Balaghat Mine(AGT/BGT/MECH/IMB/18-19/40 dtd 17/04/2018) | 19-04-2018 | 30-04-2018 | 30-04-2018 | 30-04-2018 | 04:30 PM | Active | View |
81. | Loading and Unloading of steel section, Cement Bags, Timbers, Lubricants and other spare as well as store materials with stacking at Ukwa Mine stores(UK/Mech/17-18/2656 Dated 15/03/2018) | 19-04-2018 | 30-04-2018 | 30-04-2018 | 30-04-2018 | 04:30 PM | Active | View |
82. | Cleaning of Surface Drain at Ukwa Mine(16/Civil/UM/18-19/164) | 19-04-2018 | 02-05-2018 | 02-05-2018 | 02-05-2018 | 04:30 PM | Active | View |
83. | Retiling and roof repair work of camp quarter at Ukwa Mine(16/Civil/UM/18-19/165) | 19-04-2018 | 02-05-2018 | 02-05-2018 | 02-05-2018 | 04:30 PM | Active | View |
84. | Repairs to roof slab of camp quarters at Ukwa Mine(16/Civil/UM/18-19/166) | 19-04-2018 | 02-05-2018 | 02-05-2018 | 02-05-2018 | 04:30 PM | Active | View |
85. | Cleaning Desilting and removal of garbage from Dug Open Well through machine manually at Kandri Mine(MOIL/17-18/ET/493) | 18-04-2018 | 18-05-2018 | 18-05-2018 | 18-05-2018 | 03:30 PM | Active | View |
86. | Providing and fixing of Paving Block Flooring at front and back side and construction of shed at backside of workshop at Gumgaon Mine(MOIL/17-18/ET/307) | 18-04-2018 | 18-05-2018 | 18-05-2018 | 18-05-2018 | 03:30 PM | Active | View |
87. | Annual Repair to Camp Quarters at Beldongri Mine.(MOIL/17-18/ET/293) | 18-04-2018 | 18-05-2018 | 18-05-2018 | 18-05-2018 | 03:30 PM | Active | View |
88. | Picking and collection of UKL 448 25 PERCENT from F W dumps from Ch.9500 to ch.12000 at Ukwa Mine(MOIL/18-19/ET/23) | 17-04-2018 | 22-05-2018 | 22-05-2018 | 22-05-2018 | 03:30 PM | Active | View |
89. | Trench cutting in ore stacks including sample bags carrying at Ukwa Mine(MOIL/18-19/ET/21) | 17-04-2018 | 17-05-2018 | 17-05-2018 | 17-05-2018 | 03:30 PM | Active | View |
90. | Picking and collection of UKL 448 25 PERCENT from F W dumps from Ch.4300 to ch.6800 at Ukwa Mine(MOIL/18-19/ET/22) | 17-04-2018 | 17-05-2018 | 17-05-2018 | 17-05-2018 | 03:30 PM | Active | View |
91. | Pushing and unloading of ROM and rock tubs in underground at Munsar Mine(MOIL/18-19/ET/24) | 17-04-2018 | 17-05-2018 | 17-05-2018 | 17-05-2018 | 03:30 PM | Active | View |
92. | Furniture and Interior Works for Civil Department 2nd Floor MOIL Bhawan Nagpur.(MOIL/18-19/ET/ 25) | 17-04-2018 | 08-05-2018 | 08-05-2018 | 08-05-2018 | 03:30 PM | Active | View |
93. | Picking and collection of material from Magazine Dump South side at Chikla Mine(MOIL/18-19/ET/20) | 16-04-2018 | 16-05-2018 | 16-05-2018 | 16-05-2018 | 03:30 PM | Active | View |
94. | Loading of Manganese Ore into trucks for despatches of ore at Ukwa Mine(MOIL/18-19/ET/18) | 16-04-2018 | 16-05-2018 | 16-05-2018 | 16-05-2018 | 03:30 PM | Active | View |
95. | Cleaning of ROM recovered from Pit No.2 at Sitapatore Mine(MOIL/18-19/ET/19) | 16-04-2018 | 16-05-2018 | 16-05-2018 | 16-05-2018 | 03:30 PM | Active | View |
96. | Providing and fixing of Paving Blocks in park near Old Admin Building at Dongri Buzurg Mine(MOIL/18-19/ET/12) | 16-04-2018 | 16-05-2018 | 16-05-2018 | 16-05-2018 | 03:30 PM | Active | View |
97. | Renovation of Sabha Mandap in Syndicate Camp at Dongri Buzurg Mine(MOIL/17-18/ET/441) | 16-04-2018 | 16-05-2018 | 16-05-2018 | 16-05-2018 | 03:30 PM | Active | View |
98. | Construction of Store Room for used oil at Dongri Buzurg Mine(MOIL/17-18/ET/286) | 16-04-2018 | 16-05-2018 | 16-05-2018 | 16-05-2018 | 03:30 PM | Active | View |
99. | Purchase of Sand for Sand Stowing Plant at Balaghat Mine(MOIL/18-19/ET/17) | 16-04-2018 | 07-05-2018 | 07-05-2018 | 07-05-2018 | 03:30 PM | Active | View |
100. | Annual Repair to Camp Quarters at Ukwa Mine.(MOIL/17-18/ET/310) | 16-04-2018 | 23-05-2018 | 23-05-2018 | 23-05-2018 | 03:30 PM | Active | View |
Tenders More Information |
---|
Contracts finalised on nomination basis Details of Purchase Order issued by MATERIALS DEPARTMENT valuing Rs.30.00 Lakhs & Above
List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website) |
View (2024) Year Tenders |
View (2023) Year Tenders |
View (2022) Year Tenders |
View (2021) Year Tenders |
View (2020) Year Tenders |
View (2019) Year Tenders |
View (2018) Year Tenders |
View (2017) Year Tenders |
View (2016) Year Tenders |
View (2015) Year Tenders |
View (2014) Year Tenders |
View (2013) Year Tenders |
View (2012) Year Tenders |
View (24) Year Tenders |
View Full Tender Archive |
See all MOIL tender. |