Tender Archive

Tender Archive

Title for Search Tender Issue Start Date Tender Issue End Date
S.No. Title Issue Start Date Issue Last Date Submission Last Date Opening Date Opening Time Status View
1. Purchase of Sand for Sand Stowing Plant at Kandri Munsar and Beldongri Mine(MOIL/18-19/ET/328) 27-11-2018 27-12-2018 27-12-2018 27-12-2018 03:30 PM Active View
2. Loading of Slag at Ferro Manganese Plant, Balaghat Mine( MOIL/18-19/ET/315) 27-11-2018 26-12-2018 26-12-2018 26-12-2018 03:30 PM Active View
3. Purchase of HIGH DENSITY POLY ETHYLENE-HDPE WOOVEN SACKS - 30150 NOS.(WE-108 e-tender No.MOIL/18-19/ET-344, Dt.27.11.18) 27-11-2018 01-01-2019 01-01-2019 02-01-2019 03:30 PM Active View
4. Extra excavation in Mangeniferous rock at 5th Level of vertical shaft section of Chikla Mine(MOIL/18-19/ET/330) 26-11-2018 10-12-2018 10-12-2018 10-12-2018 03:30 PM Active View
5. Extra excavation in Mangeniferous rock at 70 Level of Chikla B section of Chikla Mine(MOIL/18-19/ET/333) 26-11-2018 10-12-2018 10-12-2018 10-12-2018 03:30 PM Active View
6. PURCHASE OF MOTOR REDUCER (TRACK DRIVE GEAR BOX) (MAKE - SANDVIK ASIA PVT.LTD.) - 1 NO.FOR BALAGHAT MINE(M.P) (AS PER ANNEXURE - A ENCLOSED)(PUR/MOIL/C-4/240/E-55/794-M DT.26/11/2018) 26-11-2018 21-12-2018 21-12-2018 21-12-2018 03:30 PM Active View
7. REPAIRING OF AIR CONDITIONING UNIT OF HEAVY EARTH MOVING MACHINERIES AT DONGRI BUZURG MINE.(DB/MECH/EXC/18-19/482) 26-11-2018 07-12-2018 07-12-2018 07-12-2018 04:30 PM Active View
8. REPAIRING OF TRACK ROLLERS OF BEML DOZER BD155 NO.3 OF DONGRI BUZURG MINE.(DB/MECH/EXC/18-19/483) 26-11-2018 07-12-2018 07-12-2018 07-12-2018 04:30 PM Active View
9. REPAIRING OF BOOM CYLINDER OF TATAT HITACHI 450 HYDRAULIC EXCAVATOR OPERTING AT DONGRI BUZURG MINE.(DB/MECH/EXC/18-19/481) 26-11-2018 07-12-2018 07-12-2018 07-12-2018 04:30 PM Active View
10. Drilling of 57 mm dia holes apremining support for installing cabel bolt in Manginifferous rock in between ch 07 to 11 Level at Balaghat Mine( Mining/BGT/T.E./18-19/5214) 26-11-2018 04-12-2018 04-12-2018 04-12-2018 04:30 PM Active View
11. PURCHASE OF HDPE PIPES 140 MM FOR BALAGHAT MINE(PUR/MOIL/BGT/HDPE/18-19/1091 dtd 22/11/2018) 23-11-2018 12-12-2018 12-12-2018 12-12-2018 04:30 PM Active View
12. PURCHASE OF HDPE PIPES 140 MM FOR BALAGHAT MINE(PUR/MOIL/BGT/HDPE/18-19/1091 dtd 22/11/2018) 23-11-2018 12-12-2018 12-12-2018 12-12-2018 04:30 PM Active View
13. PURCHASE OF HDPE PIPES 140 MM FOR BALAGHAT MINE( PUR/MOIL/BGT/HDPE/18-19/1091 dtd 22/11/2018) 23-11-2018 03-12-2018 03-12-2018 03-12-2018 04:30 PM Active View
14. Annual Rate Contract for supply of Cement Capsules - 446700 Nos.(WE-109 DT.22.11.2018(e-TenderNo. MOIL/18-19/ET/342) 22-11-2018 13-12-2018 13-12-2018 14-12-2018 03:30 PM Active View
15. Designing, Engineering, Supplying, Installation, Commissioning and Testing of 2 X 1600KVA, 11KV/433V Indoor Substation for Second Vertical Shaft Project at Ukwa Mine(MOIL/18-19/ET/307) 22-11-2018 28-12-2018 28-12-2018 28-12-2018 03:30 PM Active View
16. Diamond Drill Bits and Accessories- 7 Items.(WE-105 DT.22.11.2018 (e-TenderNo.MOIL/18-19/ET/343) 22-11-2018 24-01-2019 24-01-2019 25-01-2019 03:30 PM Active View
17. DUST MASK, EAR PLUGS, EAR MUFF(PUR-MOIL-C-1 190-WE-103-ET-327 dt. 20/11/2018) 20-11-2018 17-12-2018 17-12-2018 18-12-2018 03:30 PM Active View
18. C. I. SHEAVE WHEEL 2800mm DIA(PUR-MOIL-C-12-50-WE-113-ET-326 dt. 19-11-2018) 19-11-2018 10-12-2018 10-12-2018 11-12-2018 03:30 PM Active View
19. Purchase of Jaw Plates for Sayaji Make Jaw Crushers(WE-110 e-tender No.MOIL/18-19/ET-325, Dt.19.11.18) 19-11-2018 11-12-2018 11-12-2018 12-12-2018 03:30 PM Active View
20. Purchase of Jaw Plates for Sayaji Make Jaw Crushers(WE-110 e-tender No.MOIL/18-19/ET-325, Dt.19.11.18) 19-11-2018 11-12-2018 11-12-2018 12-12-2018 03:30 PM Active View
21. Extension of existing old metering room at Kandri Mine.(KAN/Civil/NIT/2018-19/2624 Dated 17.11.2018) 19-11-2018 26-11-2018 26-11-2018 26-11-2018 04:30 PM Active View
22. Printing of Company Diary 2019(PUR-MOIL-C-12-26-WE-111-ET-323 dt.16/11/2018) 17-11-2018 05-12-2018 05-12-2018 06-12-2018 03:30 PM Active View
23. Renovation of Vertical Shaft by replacement of Guide Rails, Buntons, Sollars, Laaders and Fencing at Chikla Mine( MOIL/18-19/ET/303) 17-11-2018 17-12-2018 17-12-2018 17-12-2018 03:30 PM Active View
24. Providing, Supplying, Installation and Commissioning of heavy duty centrifugal pump with drive and operating valves at Chikla Mine(MOIL/18-19/ET/306) 17-11-2018 17-12-2018 17-12-2018 17-12-2018 03:30 PM Active View
25. Purchase of Steel Cages for Munsar Mine - 3 Nos.(1 Lot) (Only Through e-procurement)( WE-112 DT.17/11/2018 (MOIL/18-19/ET/324)) 17-11-2018 17-12-2018 17-12-2018 18-12-2018 03:30 PM Active View
26. Construction of Rest Shelter Near Screening Plant, near Siding Region at Munsar Mine(MOIL/18-19/ET/313) 16-11-2018 17-12-2018 17-12-2018 17-12-2018 03:30 PM Active View
27. Construction of collection tank and circulation network for sewage treatment plant at Munsar Mine(MOIL/18-19/ET/312) 16-11-2018 17-12-2018 17-12-2018 17-12-2018 03:30 PM Active View
28. Replacement of old damage steel doors and windows with new steel doors and windows for camp quarters at UKWA mine(MOIL/18-19/ET/308) 16-11-2018 17-12-2018 17-12-2018 17-12-2018 03:30 PM Active View
29. Civil House Keeping Works to Industrial and Alliied Building inside Mine premises for upcoming Safety Week at Balaghat Mine(Civil/BGT/T.E./2018-19/4959) 16-11-2018 23-11-2018 23-11-2018 23-11-2018 04:30 PM Active View
30. Construction of foundation and extended platform for Elevated feeding hopper of Mobile Crusher at Munsar Mine(MOIL/18-19/ET/311) 16-11-2018 17-12-2018 17-12-2018 17-12-2018 03:30 PM Active View
31. Construction and installation of bio toilet for underground in Kandri Mine(KAN/CIVIL/NIT/2018-19/2544 Date 10.11.2018) 16-11-2018 17-11-2018 17-11-2018 17-11-2018 04:30 PM Active View
32. COMPANY CALENDAR(PUR/MOIL/C-12/26/E-52/781-M dt. 16/11/2018) 16-11-2018 30-11-2018 30-11-2018 30-11-2018 03:30 PM Active View
33. Construction of Durga Stage including other amenities at Football ground at Kandri Mine(MOIL/18-19/ET/310) 16-11-2018 17-12-2018 17-12-2018 17-12-2018 03:30 PM Active View
34. Providing and fixing of paving blocks in rest house at Chikla Mine.(TE/CH/CIVIL/18-19/432 date 25/10/2018) 15-11-2018 21-11-2018 21-11-2018 21-11-2018 03:30 PM Active View
35. Erection of HT overhead line from 5th level substation to south ventilation fan and Pro, sup, inst and comm of new HT line through aerial bunch cable from 33KV substation to production shaft substation and from production substation to 6th level sur(MOIL/ 15-11-2018 14-12-2018 14-12-2018 14-12-2018 03:30 PM Active View
36. Drilling of 57 mm dia holes a premium support for installing cabel bolt in a Manginifferous rock in bolt in a Manginiferrous rock(Mining/BGT/T.E./18-19/4864 A) 15-11-2018 22-11-2018 22-11-2018 22-11-2018 04:30 PM Active View
37. Painting to residential quarters at Balaghat and Ukwa Mine( MOIL/18-19/ET/314) 15-11-2018 17-12-2018 17-12-2018 17-12-2018 03:30 PM Active View
38. HIRING OF 80MT CRANE FOR UNLOADING OF TATAHITACHI MAKE TATA1200V HYD EXCAVATOR AT MOIL LTD DONGRI BUZURG MINE.( DB/MECH/18-19/SDGM(MECH)/ 465) 15-11-2018 20-11-2018 20-11-2018 20-11-2018 04:30 PM Active View
39. Modification of Structure Fabrication work to Transformer Building for Transformer replacement at Ferro Manganese plant Balaghat Mine(MOIL/18-19/ET/309) 15-11-2018 17-12-2018 17-12-2018 17-12-2018 03:30 PM Active View
40. Setting up Cloud Based Disaster Recovery Site for MOILs SAP Data Centre(MOIL/18-19/ET/277) 14-11-2018 14-12-2018 14-12-2018 14-12-2018 03:30 PM Active View
41. WEBSITE TENDER ENQUIRY IN SINGLE BID SYSTEM FOR PURCHASE OF VALVES FOR PIPE LINE(PUR/MOIL/C-11/148/E-50/705-M Dt. 14-11-2018) 14-11-2018 05-12-2018 05-12-2018 05-12-2018 03:30 PM Active View
42. LED based Miners Safety Cap Lamp Assembly with Charging Rack and spares.(WE-100 DT.13.11.2018 (e-Tenderno.MOIL/18-19/ET/322) 14-11-2018 05-12-2018 05-12-2018 06-12-2018 03:30 PM Active View
43. Providing telephone communication for 2nd vertical shaft, residential quarters and other mine areas at Munsar mine(MOIL/18-19/ET/304) 13-11-2018 12-12-2018 12-12-2018 12-12-2018 03:30 PM Active View
44. Providing telephone communication for 2nd vertical shaft, residential quarters and other mine areas at Munsar mine(MOIL/18-19/ET/304) 13-11-2018 12-12-2018 12-12-2018 12-12-2018 03:30 PM Active View
45. Comprehensive Annual Maintenance Contract for Road Weigh-Bridges(MOIL/18-19/ET/302) 09-11-2018 07-12-2018 07-12-2018 07-12-2018 03:30 PM Active View
46. HDPE Pipes, Bends and Pipe Ends(MOIL/18-19/WE-106/ET/ 321 dt. 09.11.2018) 09-11-2018 29-11-2018 29-11-2018 30-11-2018 03:30 PM Active View
47. Mannual Removal of Sludge From S.K. Tank at Balaghat Mine(Mining/BGT/T.E./18-19/4657) 07-11-2018 16-11-2018 16-11-2018 16-11-2018 04:30 PM Active View
48. Cleaning of spillage Material under and around all the Equipment at Balaghat Mine(Mining/BGT/T.E./2018-19/4650A) 07-11-2018 16-11-2018 16-11-2018 16-11-2018 04:30 PM Active View
49. Purchase of Remote Controlled, Light Weight, Electro-Hydraulic Drill Cum Loading Equipment with CAMC for Underground Mining Application at Balaghat Mine (M.P) - 1 No.(2 Lots) (Only Through e-procurement)(WE-93 DT.06/11/2018 (MOIL/18-19/ET/320)) 06-11-2018 27-12-2018 27-12-2018 28-12-2018 03:30 PM Active View
50. Additional excavation in Mangeniferous rock between Ch.41 to Ch.45 at Gumgaon Mine(MOIL/18-19/ET/317) 06-11-2018 05-12-2018 05-12-2018 05-12-2018 03:30 PM Active View
51. Picking and collection of 25 PERCENT Mn SM grade BGL 462 from sub grade mineral reject of Underground ROM at Balaghat Mine(MOIL/18-19/ET/298) 06-11-2018 05-12-2018 05-12-2018 05-12-2018 03:30 PM Active View
52. Muffling for blasting at 6A 6B and 6C section of North Tirodi Mine(MOIL/18-19/ET/299) 06-11-2018 05-12-2018 05-12-2018 05-12-2018 03:30 PM Active View
53. Operation of vibrating screen to screen sub grade mineral reject of underground ROM at Balaghat Mine(MOIL/18-19/ET/301) 06-11-2018 05-12-2018 05-12-2018 05-12-2018 03:30 PM Active View
54. Screening shorting picking stacking of jigging Ferro manganese metal at ferro Plant (BGT/FMP/T.E./2018-19/244 ) 05-11-2018 21-11-2018 21-11-2018 21-11-2018 4:30 pm Active View
55. Purchase of Backhoe Loader along with Rock Breaker for Sitapatore Mine (M.P) - 1 No. (2 Lots) (Only Through e-procurement)(WE-102 DT.05/11/2018 (MOIL/18-19/ET/319)) 05-11-2018 10-12-2018 10-12-2018 11-12-2018 03:30 PM Active View
56. PURCHASE OF VIBRATING FEEDER COMPLETE WITH DRIVE - 1 NO.FOR BALAGHAT MINE (AS PER ANNEXURE - A ENCLOSED).(PUR/MOIL/C-4/212/E-51/753-M DT.03/11/2018) 03-11-2018 26-11-2018 26-11-2018 26-11-2018 03:30 PM Active View
57. Waterproofing to Cap Lamp room and Record room of Mine hospital at Munsar Mine(MUN/CIVIL/18-19/114 DT 02.11.2018) 03-11-2018 30-11-2018 30-11-2018 30-11-2018 04:30 PM Active View
58. WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR PLUG ASSEMBLY AUDIO VISUAL ALARMS AND LIGHTING SPARES OF LHD AND SDL MACHINES-MAKE EIMCO ELECON(PUR/MOIL/C-5/27/E-41/600-M Dt. 02/11/2018) 02-11-2018 14-11-2018 14-11-2018 14-11-2018 03:30 PM Active View
59. Design, Procurement, Supply, Fabrication, Erection, Installation and Commissioning of new CandS Plant of 40 TPH capacity and one additional bunker of 100MT capacity near 2nd Vertical Shaft at Chikla Mine(MOIL/18-19/ET/292) 01-11-2018 01-12-2018 01-12-2018 01-12-2018 03:30 PM Active View
60. Providing and fixing of paving blocks in rest house at Chikla Mine.(TE/CH/CIVIL/18-19/432 date 25/10/2018) 31-10-2018 10-11-2018 10-11-2018 10-11-2018 03:30 PM Active View
61. Purchase of Pump - Various Types - 10 Nos. for Balaghat Mine (6 Lots) (Only Through e-procurement)(WE-104 DT.31/10/2018 (MOIL/18-19/ET/300)) 31-10-2018 03-12-2018 03-12-2018 04-12-2018 03:30 PM Active View
62. Consstruction of RCC Gantry Wall at Ch 10000 at Ukwa Mine(16/Civil/UM/18-19/1578) 29-10-2018 12-11-2018 12-11-2018 12-11-2018 04:30 PM Active View
63. MAINTENANCE OF GARDEN OF MOIL TRAINING CENTRE AT MUNSAR MINE.(MUN/CIVIL/18-19/107 DT 27.10.2018) 28-10-2018 12-11-2018 12-11-2018 12-11-2018 04:30 PM Active View
64. Extension and rising of RCC walls both sides of Mobile at Munsar(MUN/CIVIL/18-19/110 DT 27.10.2018) 28-10-2018 03-11-2018 03-11-2018 03-11-2018 04:30 PM Active View
65. Purchase of Cross Bit- 57mm dia suitable for ATLAS COPCO Make Cable Bolting Machine(WE-54 e-tender No.MOIL/18-19/ET-297, Dt.26.10.18) 26-10-2018 11-12-2018 11-12-2018 12-12-2018 03:30 PM Active View
66. Purchase of Cross Bit- 57mm dia suitable for ATLAS COPCO Make Cable Bolting Machine(WE-54 e-tender No.MOIL/18-19/ET-297, Dt.26.10.18) 26-10-2018 11-12-2018 11-12-2018 12-12-2018 03:30 PM Active View
67. WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR ATLAS COPCO MAKE ROCK BREAKER MODEL MB -1500(PUR/MOIL/C-5/70/E-49/690-M Dt. 26/10/2018) 26-10-2018 19-11-2018 19-11-2018 19-11-2018 03:30 PM Active View
68. Purchase of Vehicle/ Inverter Batteries(WE-80 DT.25.10.2018 (e-Tender no.MOIL/18-19/ET/296) 25-10-2018 21-11-2018 21-11-2018 22-11-2018 03:30 PM Active View
69. Repairing of Kachha Road from Undergroung Pit Office to 7 No. Mine Section area road at Tirodi Mine.(TRD/CIVIL/2018-19/2651-B) 24-10-2018 30-10-2018 30-10-2018 30-10-2018 03:30 PM Active View
70. Installation of Biometric attendance system at Gumgaon Mine(MOIL/18-19/ET/294) 23-10-2018 21-11-2018 21-11-2018 21-11-2018 03:30 PM Active View
71. Misc. housekeeping and repairing works of mine hospital of Balaghat Mine(BGT/CIVIL/18-19/14 DATE 22.10.2018) 23-10-2018 02-11-2018 02-11-2018 02-11-2018 04:30 PM Active View
72. Collection of garbage and dump into the barren land at Balaghat Mine(BGT/CIVIL/18-19/12 DATE 22.10.2018) 23-10-2018 02-11-2018 02-11-2018 02-11-2018 04:30 PM Active View
73. Cleaning of Septic tank, drains of mine premises of Balaghat Mine(BGT/CIVIL/18-19/11 DATE 22.10.2018) 23-10-2018 02-11-2018 02-11-2018 02-11-2018 04:30 PM Active View
74. Cutting of Grass and unwanted shrubs of quarters of Balaghat Mine(BGT/CIVIL/18-19/13 DATE 22.10.2018) 23-10-2018 02-11-2018 02-11-2018 02-11-2018 04:30 PM Active View
75. TENDER ENQUIRY IN SINGLE BID SYSTEM FOR SCREENING OF SIDING DEBRIDGE TO PRODUCE 340MT ORE AND 300 MT FINES AT CHIKLA MINE( TE-20 Dt.22102018) 22-10-2018 29-10-2018 29-10-2018 29-10-2018 04:30 PM Active View
76. Removal of spillage from the bottom of conveyor belt of 14.5 level Loading station Production Shaft.(BGT/ Mech /spillage/18-19/ 858) 22-10-2018 30-10-2018 30-10-2018 30-10-2018 05:00 PM Active View
77. Providing of painting and alluminium partion wall for account office at Tirodi Mine(TRD/CIVIL/2018-19/2618-A) 20-10-2018 26-10-2018 26-10-2018 26-10-2018 03:30 PM Active View
78. MISC. CIVIL WORKS FOR DURGA STAGE AT MUNSAR MINE(MUN/CIVIL/18-19/107 dated 20.10.2018) 20-10-2018 30-10-2018 30-10-2018 30-10-2018 04:30 PM Active View
79. Fabrication of steel platform with laying of Tram line for ROM hosting from -70L of Chikla-B.(TE/MECH/18-19/7600007280 date 17/10/2018) 18-10-2018 24-10-2018 24-10-2018 24-10-2018 03:30 PM Active View
80. Security guard for diamond drilling site at Gumgaon Mine(MOIL/18-19/ET/286) 17-10-2018 16-11-2018 16-11-2018 16-11-2018 03:30 PM Active View
81. Renovation of Holmes Shaft by replacement of Guide Rails of Cage Winding System at Balaghat Mine(MOIL/18-19/ET/291) 17-10-2018 16-11-2018 16-11-2018 16-11-2018 03:30 PM Active View
82. PURCHASE OF TRANSMISSION REPAIR KIT PN-EEA0018039 FOR EIMCO ELECON MAKE LOAD HAUL DUMP LOADER AT BALAGHAT MINE(PUR/MOIL/BGT/LHD/18-19/907 dtd 16.10.2018) 17-10-2018 30-10-2018 30-10-2018 30-10-2018 04:30 PM Active View
83. Provision of standby DC Drive and PLC Control Panels for Skip Winder and Production Shaft Winder of Balaghat Mine(MOIL/18-19/ET/289) 17-10-2018 30-11-2018 30-11-2018 30-11-2018 03:30 PM Active View
84. Purchase of Black Gitti for Underground concreting work at Kandri Mine(MOIL/18-19/ET/287) 16-10-2018 16-11-2018 16-11-2018 16-11-2018 03:30 PM Active View
85. Maintenance of fire protection system for MOIL Bhawan Nagpur( MOIL/18-19/ET/293) 16-10-2018 16-11-2018 16-11-2018 16-11-2018 03:30 PM Active View
86. Purchase of Man Winding Steel Wire Rope-36 MM(WE-94 DT.16.10.2018 (e-TenderNo.MOIL/18-19/ET/295)) 16-10-2018 12-11-2018 12-11-2018 13-11-2018 03:30 PM Active View
87. Purchase of Basalt fines of 4 mm size for using as a stowing material with sand in Gumgaon Mine( MOIL/18-19/ET/288) 15-10-2018 29-10-2018 29-10-2018 29-10-2018 03:30 PM Active View
88. Picking collection and cleaning of 20 percent Mn ore from subgrade mineral reject from underground ROM at Beldongri Mine( MOIL/18-19/ET/285) 15-10-2018 29-10-2018 29-10-2018 29-10-2018 03:30 PM Active View
89. HIRING OF 50 MT CRANE FOR UNLOADING AND ASSEMBLING OF BH 35-2 DUMPERS AT MINE SITE OF TIRODI MINE QTY 3 NOS. DUMPERS(DGM/MECH/NOTE TRD/18-19/52/887) 15-10-2018 18-10-2018 18-10-2018 18-10-2018 03:30 PM Active View
90. Crushing and mixing of manganese ore samples at Central Laboratory(MOIL/18-19/ET/290) 15-10-2018 05-11-2018 05-11-2018 05-11-2018 03:30 PM Active View
91. PURCHASE OF ADOBE ACROBAT PRO (Latest Ver.)(PUR/MOIL/C-4/138/E-36/556-M DT.12.10.2018) 12-10-2018 31-10-2018 31-10-2018 31-10-2018 03:30 PM Active View
92. TENDER ENQUIRY IN SINGLE BID SYSTEM FOR CONCRETING FOR FAN DRIFT (WINZE) AT CH 2820 OF CHIKLA MINE(TE-18 Dt.11102018) 11-10-2018 22-10-2018 22-10-2018 22-10-2018 04:30 PM Active View
93. TENDER ENQUIRY IN SINGLE BID SYSTEM FOR REQUIREMENT OF EXTRA EXCAVATION FOR VENTILATION SHAFT AT CHIKLA MINE(TE-19 Dt.11102018) 11-10-2018 22-10-2018 22-10-2018 22-10-2018 04:30 PM Active View
94. Rubber Tub Buffer(PUR-MOIL-C-12-13-E-48 dt 11-10-2018) 11-10-2018 02-11-2018 02-11-2018 02-11-2018 03:30 PM Active View
95. Sinking of North and South Ventilation shafts having 5.0m. dia. and depth as 339m. and 277m. respectively and allied works at Balaghat Mine(MOIL/18-19/ET/282) 11-10-2018 15-11-2018 15-11-2018 15-11-2018 03:30 PM Active View
96. PURCHASE OF SHOT FIRING CABLE(PUR/MOIL/C-3/30/E-47/670-M DT.09.10.2018) 09-10-2018 29-10-2018 29-10-2018 29-10-2018 03:30 PM Active View
97. White Metal R.C. Tandem(PUR-MOIl-C-1-192-E-43 Dt. 09/10/2016) 09-10-2018 31-10-2018 31-10-2018 31-10-2018 03:30 PM Active View
98. Inner harness with cotton chin strip and cord(PUR-MOIl-C-1-190-E-45 dt. 08.10.2018) 08-10-2018 01-11-2018 01-11-2018 01-11-2018 03:30 PM Active View
99. Cotton Hand Gloves(PUR-MOIL-C-1-190-E-46 dt. 06/10/2018) 06-10-2018 29-10-2018 29-10-2018 29-10-2018 03:30 PM Active View
100. Waterproofing by means of laying torchsield over conventional country tile roofing of Mine Managers Bungalow Kandri Mine(KAN/CIVIL/NIT/2018-19/2022 Date 30.09.18) 05-10-2018 10-10-2018 10-10-2018 10-10-2018 04:30 PM Active View

Tenders More Information

Details of Purchase Order issued by MATERIALS DEPARTMENT valuing Rs.30.00 Lakhs & Above


List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website)

View (2025) Year Tenders
View (2024) Year Tenders
View (2023) Year Tenders
View (2022) Year Tenders
View (2021) Year Tenders
View (2020) Year Tenders
View (2019) Year Tenders
View (2018) Year Tenders
View (2017) Year Tenders
View (2016) Year Tenders
View (2015) Year Tenders
View (2014) Year Tenders
View (2013) Year Tenders
View (2012) Year Tenders
View (205) Year Tenders
View (24) Year Tenders
View Full Tender Archive
See all MOIL tender.