Tender Archive

Tender Archive

Title for Search Tender Issue Start Date Tender Issue End Date
S.No. Title Issue Start Date Issue Last Date Submission Last Date Opening Date Opening Time Status View
1. Removal of waste rock and magniferous rock in Footwall benches (from Ch.8 to Ch.18) and handling the same by mechanized means at Dongri Buzurg Mine(MOIL/17-18/ET/40) 09-05-2017 09-06-2017 09-06-2017 09-06-2017 03:30 PM Active View
2. Annual U/G Sand Cleaning Work at Balaghat Mine(Gr.-I/CGM(PR)/CONT/SAND/03/BGT/2017-18/03) 08-05-2017 16-05-2017 16-05-2017 16-05-2017 03:30 PM Active View
3. Cleaning of surplus underground ROM at Munsar Mine(CGM(PROD)/CONT/15/ROM.CLE/MUN/17-18/03) 08-05-2017 16-05-2017 16-05-2017 16-05-2017 03:30 PM Active View
4. Cleaning of surplus underground ROM at Munsar Mine(CGM(Prod)/CONT/13/ROM.CLE/MUN/17-18/02) 08-05-2017 16-05-2017 16-05-2017 16-05-2017 03:30 PM Active View
5. Construction of Administrative building including compound wall and vehicle parking shed at Ukwa Mine.(MOIL/17-18/ET/26) 08-05-2017 08-06-2017 08-06-2017 08-06-2017 03:30 PM Active View
6. Construction of Motor Garage at Munsar Mine(MOIL/17-18/ET/25) 08-05-2017 08-06-2017 08-06-2017 08-06-2017 03:30 PM Active View
7. Construction of Toilets at Various places of Gumgaon Mine(MOIL/17-18/ET/ 27) 08-05-2017 08-06-2017 08-06-2017 08-06-2017 03:30 PM Active View
8. Removal of sludge from drains and chambers at Mine camp area if Gumgaon Mine(Civil/17-1//Gum/253 Date 04.05.2017) 06-05-2017 13-05-2017 13-05-2017 13-05-2017 04:30 PM Active View
9. PEARL COKE(PUR/MOIL/C-11/104/WE-2/ (MOIL/17-18/ET/38)) 06-05-2017 30-05-2017 30-05-2017 30-05-2017 03:30 PM Active View
10. CEMENT(PUR/MOIL/C-6/213/WE-6 (MOIL/17-18/ET/39)) 06-05-2017 30-05-2017 30-05-2017 30-05-2017 03:30 PM Active View
11. Supply of Black Metal (Gitti) for Underground concreting work at Balaghat Mine(MOIL/17-18/ET/35) 06-05-2017 07-06-2017 07-06-2017 07-06-2017 03:30 PM Active View
12. Cleaning of Anode and Cathode(MOIL/EMD/CH/ADGM/2017-18/1183) 05-05-2017 20-05-2017 20-05-2017 20-05-2017 04:30 PM Active View
13. Pushing of tubs and unloading in Underground at Chikla Mine(MOIL/17-18/ET/33) 05-05-2017 07-06-2017 07-06-2017 07-06-2017 03:30 PM Active View
14. Additional excavation in manganiferous rock for concreting of cross cut, manways and ore pass etc. in underground at Munsar Mine(MOIL/17-18/ET/31) 05-05-2017 07-06-2017 07-06-2017 07-06-2017 03:30 PM Active View
15. Underground concreting work at Balaghat Mine(MOIL/17-18/ET/29) 05-05-2017 07-06-2017 07-06-2017 07-06-2017 03:30 PM Active View
16. Picking and collection of material from 6 No. dumps at Sitapatore Mine(MOIL/17-18/ET/34) 05-05-2017 07-06-2017 07-06-2017 07-06-2017 03:30 PM Active View
17. Obtaining Environmental Clearance for enhancement in production capacity from 90,000 MTPA to 2,00,000 MTPA by underground method of mining of Gumgaon manganese mine over an area of 85.896 Hec(MOIL/17-18/ET/37) 05-05-2017 07-06-2017 07-06-2017 07-06-2017 03:30 PM Active View
18. Obtaining Environmental Clearance for enhancement in production capacity from 1,80,000 MTPA to 3,00,000 MTPA of Chikla manganese mine over an area of 150.65 Hec.(MOIL/17-18/ET/36) 05-05-2017 07-06-2017 07-06-2017 07-06-2017 03:30 PM Active View
19. Cleaning of surplus underground ROM at Munsar Mine(MOIL/17-18/ET/28) 05-05-2017 07-06-2017 07-06-2017 07-06-2017 03:30 PM Active View
20. Pushing and unloading of ROM and rock tubs in underground and on surface at Gumgaon Mine(MOIL/17-18/ET/32) 05-05-2017 16-06-2017 16-06-2017 16-06-2017 03:30 PM Active View
21. Interior Renovation Works for Integrated Manganese Plant I/C Office, adjoining Electrical Panel Control Room and Supervisors Room at Balaghat Mine.(Civil/BGT/TE/2017-18/742 Date 28.04.2017) 03-05-2017 08-05-2017 08-05-2017 08-05-2017 04:30 PM Active View
22. Interior Renovation Works for Agent Bungalow at Balaghat Mine(Civil/BGT/TE/2017-18/736 Date 28.04.2017) 03-05-2017 08-05-2017 08-05-2017 08-05-2017 04:30 PM Active View
23. Drilling of 2 Nos. Bore holes for Drinking Water supply at Kandri Mine(KAN/Civil/HO/MM/17-18/321 Date 02/05/2017) 03-05-2017 17-05-2017 17-05-2017 17-05-2017 03:30 PM Active View
24. Picking and sorting of 3rd grade lump and 25 percent Sm grade lump from dump ROM at Kandri Mine(KAN/Mine/HO/Agent/17-18/314 Date 01.05.20) 03-05-2017 19-05-2017 19-05-2017 19-05-2017 03:30 PM Active View
25. Relining and Repairing of Electrolytic Cell tanks(MOIL/EMD/CH/ADGM/2017-18/1176) 02-05-2017 12-05-2017 12-05-2017 12-05-2017 04:30 PM Active View
26. Purchase of Siemens make spares for Ukwa Mine(UK/ELECT/2017-18/193) 02-05-2017 17-05-2017 17-05-2017 17-05-2017 04:00 PM Active View
27. Construction of a Water Tank (GSR) of 1.00 Lac Cumt. Capacity near Sand Stowing Plant at Kandri Mine(MOIL/ET/17-18/24) 02-05-2017 19-05-2017 19-05-2017 19-05-2017 03:30 PM Active View
28. Repair of Shed and replacement of old damaged sheets at rear side near Kitchen of Guest House at West Court, MOIL, Nagpur.(Civil /HO/17-18/HO /14 Dated 25/04/2017) 29-04-2017 17-05-2017 17-05-2017 17-05-2017 03:30 PM Active View
29. STRUCTURE STABILITY TEST ALONG WITH DESIGNING AND PREPARATION OF DRAWING AND DETAILED ESTIMATION OF COST OF MODIFICATION WORKS REQUIRED FOR STRENGTHENING OF HEAD GEAR OF HOLMES SHAFT BALAGHAT MINE FOR CHANGING OF LOCKED COIL WINDING ROPE FROM 32 MM(/BGT/M 28-04-2017 10-05-2017 10-05-2017 10-05-2017 04:30 PM Active View
30. Refilling and maintenance of fire equipment and fire extinguishers(SDGM(M)63/Fire Extinguisher/17-18/06 dt.27.4.2017) 28-04-2017 09-05-2017 09-05-2017 09-05-2017 03:00 PM Active View
31. Construction of Boundary wall by Precast Pre stressed Concrete Panels at Dongri buzurg Mine.(MOIL/17-18/ET/22) 26-04-2017 25-04-2017 25-04-2017 25-04-2017 03:30 PM Active View
32. Recovery of dump fines (GMF-527) from dumps at Gumgaon Mine(Min/Gum/17-18/180 Date 25.04.2017) 26-04-2017 03-05-2017 03-05-2017 03-05-2017 04:30 PM Active View
33. Providing and Applying white washing distempering and grass cleaning etc.(Agent/Civil/DB/2016-17/3525 Date 15 .03.2017) 26-04-2017 04-05-2017 04-05-2017 04-05-2017 04:30 PM Active View
34. Construction of Boundary wall by Precast Pre stressed Concrete Panels at Ukwa Mine.(MOIL/17-18/ET/21) 26-04-2017 25-05-2017 25-05-2017 25-05-2017 03:30 PM Active View
35. Construction of Boundary wall area at Gumgaon Mine(MOIL/17-18/ET/ 23) 26-04-2017 25-05-2017 25-05-2017 25-05-2017 03:30 PM Active View
36. Recertification of Kandri, Chikla,Tirodi and Ukwa mines under OHSAS(SDGM(SE)/Re-Cert-OHSAS/17-18/05 dt.24-04-2017) 25-04-2017 08-05-2017 08-05-2017 08-05-2017 03:00 PM Active View
37. Recertification of Kandri,Chikla Tirodi and Ukwa mines under OHSAS.(SDGM(SE)/Re-Cert-OHSAS/17-18/05 dt.24-04-2017) 25-04-2017 08-05-2017 08-05-2017 08-05-2017 03:00 PM Active View
38. RETILING AND REROOFING OF CAMP QUARTERS AT KANDRI MINE(KAN/CIVIL/17-18/15 DT. 24.04.2017) 25-04-2017 03-05-2017 03-05-2017 03-05-2017 03:30 PM Active View
39. Cleaning of Storm Water drains, U/G Sump and misc. repair at Kandri Mine. (KAN/CIVIL/17-18/16 DT 24.04.2017) 25-04-2017 03-05-2017 03-05-2017 03-05-2017 3:30 pm Active View
40. Pushing and unloading of ROM rock tubs in underground and on surface AT GUMGAON MINE(Mining/Gum/17-18/154 Date 21.04.2017) 22-04-2017 28-04-2017 28-04-2017 28-04-2017 04:30 PM Active View
41. Additional excavation in Maganeferous rock adjacent X cut no19 to X cut no 21 at 200 ft L at Gumgaon Mine.(Mining/Gum/17-18/155 Date 21.04.2017) 22-04-2017 28-04-2017 28-04-2017 28-04-2017 04:30 PM Active View
42. Construction of lease boundary pillars at Gumgaon Mine (CIVIL/17-18/GUM/156 Date-21.04.2017) 22-04-2017 29-04-2017 29-04-2017 29-04-2017 4:30 pm Active View
43. Construction of retaining wall near new Evasee fan house at Gumgaon Mine (CIVIL/17-18/GUM/157 Date-21.04.2017) 22-04-2017 29-04-2017 29-04-2017 29-04-2017 4:30 pm Active View
44. Drilling of 57 mm dia drill holes for installing cable bolts in Magneferous rock at -200L at Gumgaon Mine(Min/Gum/17-18/141 Date-20.04.2017) 21-04-2017 27-04-2017 27-04-2017 27-04-2017 04:30 PM Active View
45. Drilling of 57 mm dia drill holes for installing cable bolts in Magneferous rock at -200L at Gumgaon Mine(Min/Gum/17-18/141 Date-20.04.2017) 21-04-2017 27-04-2017 27-04-2017 27-04-2017 04:30 PM Active View
46. Trench cutting in ore stacks for sampling at Chikla Mine(Gr.II/GM(M)/CONT/Trench-cut/83/CH/2017-18/2) 21-04-2017 28-04-2017 28-04-2017 28-04-2017 03:30 PM Active View
47. Strengthening and construction of RCC Side walls for Railway Siding at Balaghat Mine(MOIL/17-18/ET/14) 21-04-2017 19-05-2017 19-05-2017 19-05-2017 03:30 PM Active View
48. Construction of Drain Motor garage Black smith Shop near workshop and construction of Shed and Cycle Stand near Vertical Shaft at Ukwa Mine.(MOIL/17-18/ET/13) 21-04-2017 19-05-2017 19-05-2017 19-05-2017 03:30 PM Active View
49. Maintenance and Operation of Water Supply Scheme Dongri Bz. Mine(MOIL/17-18/ET/15) 21-04-2017 19-05-2017 19-05-2017 19-05-2017 03:30 PM Active View
50. Construction of tar road from main PWD road to MOIL Rest house, MOIL gate no.1 to PWD road and mine and bungalow no.2 towards Jamrapani staff quarter at Tirodi Mine.(MOIL/17-18/ET/16) 21-04-2017 19-05-2017 19-05-2017 19-05-2017 03:30 PM Active View
51. Construction of substation building at Dongri Bz. Mine(MOIL/17-18/ET/20) 21-04-2017 19-05-2017 19-05-2017 19-05-2017 03:30 PM Active View
52. Construction of Railway Siding Platform at Chikla Mine(MOIL/17-18/ET/11) 21-04-2017 19-05-2017 19-05-2017 19-05-2017 03:30 PM Active View
53. Renovation of Office of Electrical Department and Cap Lamp Room and construction of shed for storage purpose at 6 th level premises at Balaghat Mine.(Civil /HO/17-18/BGT /09 Dated 18/04/2017) 20-04-2017 18-05-2017 18-05-2017 18-05-2017 03:30 PM Active View
54. Removal of waste rock and handling the same by mechanized means from Magazine dump at Gumgaon Mine(MOIL/17-18/ET/17) 20-04-2017 22-05-2017 22-05-2017 22-05-2017 03:30 PM Active View
55. Picking and collection of material from dumps at Munsar Mine(MOIL/17-18/ET/19) 20-04-2017 22-05-2017 22-05-2017 22-05-2017 03:30 PM Active View
56. Removal of waste rock and magniferous rock and handling the same by mechanized means from Pit No.5 at Sitapatore Mine(MOIL/17-18/ET/18) 20-04-2017 25-05-2017 25-05-2017 25-05-2017 03:30 PM Active View
57. Picking and Collection of Material from East Side of A Dump at Tirodi Mine(TRD/Mine/HO/2017-18/158) 19-04-2017 26-04-2017 26-04-2017 26-04-2017 04:30 PM Active View
58. Picking and Collection of Material from Off The Pit area at Dump at Tirodi Mine(TRD/Mine/HO/2017-18/157) 19-04-2017 26-04-2017 26-04-2017 26-04-2017 04:30 PM Active View
59. Picking and Collection of Material from North Dump at Tirodi Mine(TRD/Mine/HO/2017-18/156) 19-04-2017 26-04-2017 26-04-2017 26-04-2017 04:30 PM Active View
60. Providing and Laying epoxy flooring for Work Shop at Munsar Mine.(Mun/C/HO/Agent/17-18/64 dt 19/04/2017) 19-04-2017 28-04-2017 28-04-2017 28-04-2017 04:30 PM Active View
61. Providing and Fitting PVC over head water tank at 20 No. A type Quarter in Wahitola at Munsar Mine.(Mun/C/HO/Agent/17-18/63 Dt 19/04/2017) 19-04-2017 28-04-2017 28-04-2017 28-04-2017 04:30 PM Active View
62. PURCHASE OF HSD-3882 KL (AS PER ANNEXURE - A ENCLOSED).(E-3 DT.19.04.2017) 19-04-2017 12-05-2017 12-05-2017 12-05-2017 03:30 PM Active View
63. Cleaning of Surplus underground ROM at Munsar Mine.(Mun/Mine/HO/Agent/17-18/59 dt18/04/2017) 18-04-2017 24-04-2017 24-04-2017 24-04-2017 03:30 PM Active View
64. Construction of Barbed wire fencing at near 6 No North Section Tirodi Mine.(TRD/Civil/A/2017-18/133) 18-04-2017 26-04-2017 26-04-2017 26-04-2017 04:30 PM Active View
65. Transportation of Sand for sand stowing at Balaghat Mine(Gr.-I/CGM(PR)/CONT/SAND/02/BGT/2017-18/02) 18-04-2017 26-04-2017 26-04-2017 26-04-2017 05:00 PM Active View
66. Waterproofing Works by means of laying torchshield over roof of Administrative Building including allied civil works at Balaghat Mine(CIVIL/BGT/T.E./2017-18/390 Date 13.04.2017) 18-04-2017 27-04-2017 27-04-2017 27-04-2017 04:30 PM Active View
67. Construction of RCC Water Sump beside Slime Pond and Fencing Works for the front garden of Integrated Manganese Beneficiation Plant, IMB Balaghat Mine(CIVIL/BGT/T.E./2017-18/387 Date 16.04.2017) 18-04-2017 27-04-2017 27-04-2017 27-04-2017 04:30 PM Active View
68. Waterproofing Works by means of laying torchshield over roof of Administrative Building including allied civil works at Balaghat Mine(CIVIL/BGT/T.E./2017-18/390 Date 13.04.2017) 18-04-2017 27-04-2017 27-04-2017 27-04-2017 04:30 PM Active View
69. Construction of RCC Water Sump beside Slime Pond and Fencing Works for the front garden of Integrated Manganese Beneficiation Plant, IMB Balaghat Mine(CIVIL/BGT/T.E./2017-18/387 Date 16.04.2017) 18-04-2017 27-04-2017 27-04-2017 27-04-2017 04:30 PM Active View
70. Replacement of old damaged and worn out steel doors and windows with new steel doors and windows for Camp Quarters of Balaghat Mine.(CIVIL/BGT/T.E./2017-18/304 Date 13.04.2017) 13-04-2017 24-04-2017 24-04-2017 24-04-2017 04:30 PM Active View
71. Providing PVC Polythene Sheets to Mangalore Tiled Roofing to Camp Quarters and tarpaulin sheets over industrial structures including various miscellaneous repair works and retiling at Balaghat Mine(CIVIL/BGT/T.E./2017-18/307 Date 13.04.2017) 13-04-2017 24-04-2017 24-04-2017 24-04-2017 04:30 PM Active View
72. Repair to roof of labour and staff quarter of New Colony, F.M.Colony, Chikla Type Quarters, Imlitekra Camp, Hirapur Camp, Awlajhari Camp under Monsoon Preparatory Works at Balaghat Mine(CIVIL/BGT/T.E./2017-18/298 Date 13.04.2017) 13-04-2017 24-04-2017 24-04-2017 24-04-2017 04:30 PM Active View
73. Cleaning of surface drains under Monsoon Preparatory Works at Balaghat Mine(CIVIL/BGT/T.E./2017-18/301 Date 13.04.2017) 13-04-2017 24-04-2017 24-04-2017 24-04-2017 04:30 PM Active View
74. Trench cutting in ore Stacks at Beldongri Mine.(bel/trench cut/sampling/17-18/103) 13-04-2017 25-04-2017 25-04-2017 25-04-2017 04:30 PM Active View
75. Annual Repair to camp quarters at Chikla Mine.(Civil /HO/17-18 /CH/01 Dated 12/04/2017) 13-04-2017 12-05-2017 12-05-2017 12-05-2017 03:30 PM Active View
76. Picking and sorting of SM grade ore from dumps at Kandri Mine(MOIL/17-18/ET/10) 13-04-2017 12-05-2017 12-05-2017 12-05-2017 03:30 PM Active View
77. Construction of vehicle maintenance pit at work shop premises at Chikla Mine.(Civil /HO/17-18 /CH/02 Dated 12/04/2017) 13-04-2017 12-05-2017 12-05-2017 12-05-2017 03:30 PM Active View
78. Disposal of Sludge at EMD Plant, Dongri Buzurg Mine(CGM (P and D)/EMD/17-18/04) 13-04-2017 05-05-2017 04-05-2017 04-05-2017 03:30 PM Active View
79. U/G Sump Cleaning of Ukwa Mine (i) Vertical shaft U/G Section (ii) Ch 50 U/G Section.(A and Sr DGM(M)/Civil/UM/17-18/72) 12-04-2017 24-04-2017 24-04-2017 24-04-2017 04:30 PM Active View
80. Construction of OCF Shed at Beldongri Mine.(Bel/Civil//Mine/AGT/17-18/90) 12-04-2017 24-04-2017 24-04-2017 24-04-2017 04:30 PM Active View
81. Maintenance and operation of water supply scheme at Ukwa Mine(A and Sr DGM(M)/Civil/UM/17-18/75) 12-04-2017 27-04-2017 27-04-2017 27-04-2017 04:30 PM Active View
82. Maintenance and operation of water supply scheme at Ukwa Mine(A and Sr DGM(M)/Civil/UM/17-18/75) 12-04-2017 27-04-2017 27-04-2017 27-04-2017 04:30 PM Active View
83. 550 H.P., 1000 RPM, LAMINATED YOKE, SHUNT WOUND, D.C. MOTOR-1 NO. (FOR DOUBLE DRUM WINDER OF BALAGHAT MINE) (AS PER ANNEXURE - C ENCLOSED)(Only Through e-procurement)(WE-123 DT.24/03/2017, eTENDER NO.MOIL/17-18/ET/5) 12-04-2017 28-04-2017 28-04-2017 28-04-2017 03:30 PM Active View
84. Cleaning of Sump in Underground at Balaghat Mine.(Agent Dy DGM/Mining/BGT/17-18/52 Dt 03.04.2017) 11-04-2017 14-04-2017 14-04-2017 14-04-2017 04:30 PM Active View
85. Providing and Supplying of On Road DC Motor Speed Controller (DC Chopper) 550Amps, (72 to 120) Volts probably Curtis make of model 1231C 7701 or equivalent to for Gumgaon mine ( GM/Elect/TE/17-18/52,Dtd - 10.04.2017 ) 11-04-2017 24-04-2017 24-04-2017 24-04-2017 3:30 PM Active View
86. Replacement of transfer chute liners bunker liners And chutes bunker repair at IMB plant Balaghat mine (BGT/MECH/IMBP/17-18/170) 10-04-2017 27-04-2017 27-04-2017 27-04-2017 4:30 PM Active View
87. Replacement of transfer chute liners bunker liners And chutes bunker repair at IMB plant Balaghat mine (BGT/MECH/IMBP/17-18/170) 10-04-2017 27-04-2017 27-04-2017 27-04-2017 4:30 PM Active View
88. Replacement of existing 3 phase, 5 wire, LT Overhead Line erected from IMB plant to tale end pond at Dongri Buzurg Mine.(DB/ELECT/17-18/1085) 07-04-2017 12-04-2017 12-04-2017 12-04-2017 04:30 PM Active View
89. Construction of gantry for U/G development waste rock disposal near BDC at Kandri Mine.(KAN/CIVIL/17-18/02 DT.05.04.2017) 07-04-2017 15-04-2017 15-04-2017 15-04-2017 03:30 PM Active View
90. Maintenance,watch ward of Garden in front of administrative building,Rest House, type B C quarters,M.M.Bungalow, Hospital,near Hanuman Mandir (Type A qtrs) garden at Kandri.(KAN/CIVIL/17-18/01 DT. 05/04/2017) 07-04-2017 15-04-2017 15-04-2017 15-04-2017 03:30 PM Active View
91. Removal of accumulated Pebbles near sand stowing plants at Balaghat Mine(Gr.-I/CGM(PR)/CONT/PEBBLES/34/BGT/2017-18/01) 07-04-2017 18-04-2017 18-04-2017 18-04-2017 03:30 PM Active View
92. Pushing of tubs and unloading in Underground at Chikla Mine(Gr.II/CGM/CONT/TUB/81/CH/2017-18/1) 07-04-2017 18-04-2017 18-04-2017 18-04-2017 03:30 PM Active View
93. PARAFFIN WAX(PUR/MOIL/C-11/5/WE-1 (MOIL/17-18/ET/9)) 07-04-2017 02-05-2017 02-05-2017 02-05-2017 03:30 PM Active View
94. PARAFFIN WAX (PUR/MOIL/C-11/5/WE-1 (MOIL/17-18/ET/9)) 07-04-2017 11-05-2017 11-05-2017 11-05-2017 3:30 PM Active View
95. Replacement of conductor and cable of 3 phase, 3 wire, 11 KV HT Overhead Line from main electrical substation to IMB Plant at Dongri Buzurg Mine.(DB/ELECT/17-18/1084) 06-04-2017 11-04-2017 11-04-2017 11-04-2017 04:35 PM Active View
96. Drilling of Bore holes with Submersible pump at Kesri Camp at Chikla mine(CH/CIVIL/16-17/1053 dated 25/03/2017) 04-04-2017 10-04-2017 10-04-2017 10-04-2017 03:30 PM Active View
97. Making of Road from Manoj Trivedi dump to 9 No. near Jamrapani development area at Tirodi Mine.(TRD/Civil/A/2016-17/3751A) 04-04-2017 12-04-2017 12-04-2017 12-04-2017 04:30 PM Active View
98. Drilling of Bore holes with Submersible pump at Kesri Camp at Chikla mine(CH/CIVIL/16-17/1053 dated 25/03/2017) 04-04-2017 10-04-2017 10-04-2017 10-04-2017 03:30 PM Active View
99. Transporting, Shifting of accumulated gitti at fill pass at Ch.3200 7th Level U/G to other cross cuts at Balaghat Mine(Agent Sr.DGM(M)/Mining/BGT/2016-17/8940 Dt 30.03.1) 03-04-2017 10-04-2017 10-04-2017 10-04-2017 04:00 PM Active View
100. Transporting, Shifting of accumulated gitti at fill pass at Ch.3200 7th Level U/G to other cross cuts at Balaghat Mine(Agent Sr.DGM(M)/Mining/BGT/2016-17/8940 Dt 30.03.1) 03-04-2017 10-04-2017 10-04-2017 10-04-2017 04:00 PM Active View

Tenders More Information

Details of Purchase Order issued by MATERIALS DEPARTMENT valuing Rs.30.00 Lakhs & Above


List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website)

View (2025) Year Tenders
View (2024) Year Tenders
View (2023) Year Tenders
View (2022) Year Tenders
View (2021) Year Tenders
View (2020) Year Tenders
View (2019) Year Tenders
View (2018) Year Tenders
View (2017) Year Tenders
View (2016) Year Tenders
View (2015) Year Tenders
View (2014) Year Tenders
View (2013) Year Tenders
View (2012) Year Tenders
View (205) Year Tenders
View (24) Year Tenders
View Full Tender Archive
See all MOIL tender.