Tender Archive
S.No. | Title | Issue Start Date | Issue Last Date | Submission Last Date | Opening Date | Opening Time | Status | View |
---|---|---|---|---|---|---|---|---|
1. | Providing, Supplying, Laying and Installation of 3.5 C x 50 Sqmm PVC Armoured Aluminum Conductor cable for 2 nos High mast lighting tower of footwall side at Dongri Buzurg Mine (DB/ELECT/16-17/485 DTD 01.09.2016) | 03-09-2016 | 13-09-2016 | 13-09-2016 | 13-09-2016 | 4:30 PM | Active | View |
2. | REPAIRING OF RHS FINAL DRIVE SPARES (HUB, CAGE INNER AND OUTER) OF BEML DUMPER NO 16, SWING MOTOR SHAFT MALE AND FEMALE OF BE 700 NO 2 HYDRAULIC EXCAVATOR AND ROTARY HEAD SHAFT FOR SANDVIK DI 500 OPERATING AT DONGRI BUZURG MINE (DB/MECH/16-17/484 Date 01. | 03-09-2016 | 15-09-2016 | 15-09-2016 | 15-09-2016 | 4:30 PM | Active | View |
3. | Screening, picking, collection and stacking of 25 per Mn small ore (MSL-498) through trammel at Munsar Mine from various dumps. (GM(M)-III/CONT/15/DUMP/MUN/2016-17/32) | 02-09-2016 | 09-09-2016 | 09-09-2016 | 09-09-2016 | 3:30 PM | Active | View |
4. | Picking and collection of SM grade ore from contaminated rom at old satuk section at Beldongri Mine (GM(M)-III/CONT/17/ROM/OLD-SATUK/2016-17/33) | 02-09-2016 | 09-09-2016 | 09-09-2016 | 09-09-2016 | 3:30 PM | Active | View |
5. | Providing and supplying of C class item of Electrical Dept. Of Gumgaon Mine (GM/Elect/TEN/16-17/1685, Dated - 01.09.2016) | 02-09-2016 | 15-09-2016 | 15-09-2016 | 15-09-2016 | 3:30 pm | Active | View |
6. | Erection of 3 Phase, 3 Wire L.T. Over head line from IMB Plant (MCC-2) to North Sand Stowing Plant of Balaghat Mine (SDGM(E)/8/ BGT/16-17/ 183 dated 02/09/2016) | 02-09-2016 | 22-09-2016 | 22-09-2016 | 22-09-2016 | 3:30 PM | Active | View |
7. | Fabrication of fixed gauge heavy duty tramline sleepers suitable for 30LB and 60LB Rail to Underground Tramline Works at Balaghat Mine (BGT/MECH/TRAMLINE SLEEPER/16-17/4040 Date 30.08.16) | 01-09-2016 | 09-09-2016 | 09-09-2016 | 09-09-2016 | 5:00 pm | Active | View |
8. | Purchase of Boom and Arm Cylinder for Tata Hitachi 450H Hydraulic Excavator (PUR/MOIL/C-5/4/WE-31 (MOIL/16-17/ET/85)) | 01-09-2016 | 28-09-2016 | 28-09-2016 | 28-09-2016 | 3:30 pm | Active | View |
9. | Cleaning of surplus underground ROM at Beldongri Mine (GM(M)-III/CONT/24/S-U/G-ROM/BEL/16-17/31) | 31-08-2016 | 08-09-2016 | 08-09-2016 | 08-09-2016 | 3:30 PM | Active | View |
10. | Design, Engineering, procurement and supply, construction, erection, testing and commissioning and comprehensive operation operation and maintenance for 25 years of Solar PV Plant with tracking system on turnkey basis of 5 MW at Munsar Mine of MOIL. (MOI | 31-08-2016 | 21-10-2016 | 21-10-2016 | 21-10-2016 | 3:30 PM | Active | View |
11. | Design engineering procurement and supply construction erection testing and commissioning and comprehensive operation and maintenance for 25 yeas of solar PV Plant with tracking system on turnkey basis of 5.5 MW capacity at mines of Madhya Pradesh. (MOIL/ | 31-08-2016 | 21-10-2016 | 21-10-2016 | 21-10-2016 | 3:30 PM | Active | View |
12. | Drilling of 03 nos of Bore holes for drinking water supply for New residential quarter and wahitola camp at Munsar Mine (MUN/C/HO/AGENT/16-17/674 DATE 26.08.2016) | 30-08-2016 | 06-09-2016 | 06-09-2016 | 06-09-2016 | 3:00PM | Active | View |
13. | Providing and fixing vetrified tiles on floor of varandah of guest house at Tirodi Mine (Civil/HO/16-17/TRD/446 Dt-21/08/2016) | 30-08-2016 | 07-09-2016 | 07-09-2016 | 07-09-2016 | 4:30 PM | Active | View |
14. | Annual Repair for Camp and Residential Quarters at Balaghat Mine. ( Civil /HO/16-17 /BGT/35 Dated - 29/08/2016 ) | 29-08-2016 | 15-09-2016 | 15-09-2016 | 15-09-2016 | 3:30 PM | Active | View |
15. | Security Guard for Diamond Drilling site at Ukwa Mine. (A and Sr.Dy.G.M.(M) /Civil / UM/ 16-17/1490) | 27-08-2016 | 07-09-2016 | 07-09-2016 | 07-09-2016 | 4:30 PM | Active | View |
16. | Sulphuric Acid (PUR/MOIL/C-11/3/WE-62 (MOIL/16-17/ET/80)) | 26-08-2016 | 16-09-2016 | 16-09-2016 | 16-09-2016 | 3:30 PM | Active | View |
17. | M S LANCING PIPE (PUR/MOIL/C-11/114/WE-59 (MOIL/16-17/ET/81)) | 26-08-2016 | 19-09-2016 | 19-09-2016 | 19-09-2016 | 3:30 PM | Active | View |
18. | Providing and constructing slotted pipe filter gallery and infiltration work in Bawanthadi river at existing head work for water supply scheme at Dongri Buzurg Mine. ( CIVIL/HO/16-17 /DB/30 Dt- 24/06/2016 ) | 25-08-2016 | 09-09-2016 | 09-09-2016 | 09-09-2016 | 3:30 PM | Active | View |
19. | Construction of Sewerage Treatment Plant at Dongri Buzurg Mines (TE-Civil/HO/DB/2016-17/2 DT.23/08/2016) | 25-08-2016 | 16-09-2016 | 16-09-2016 | 16-09-2016 | 3:30 PM | Active | View |
20. | Construction of Exhibition Hall near Corporate Training Centre at MOIL Bhawan premises, Nagpur. (Civil /HO/16-17 /HO/34 Dated - 23/08/2016) | 24-08-2016 | 08-09-2016 | 08-09-2016 | 08-09-2016 | 3:30 PM | Active | View |
21. | Construction of classroom Kitchen room for Mid Day meal and boundary wall toilets in Govt. school village Manegaon, Anwlajhari, RNT school village Bherweli Distt Balaghat ( M.P) Under MOIL CSR (CIVIL/HO/16-17 /CSR/BGT/28 Dt 25/08/2016) | 24-08-2016 | 15-09-2016 | 15-09-2016 | 15-09-2016 | 3:30 PM | Active | View |
22. | M.S. Welding Electrodes - 4 Items. (Only Through e-procurement) (WE-67 DT.24/08/2016, e-TENDER NO.MOIL/16-17/ET/82) | 24-08-2016 | 26-09-2016 | 26-09-2016 | 26-09-2016 | 3:30 PM | Active | View |
23. | M.S. Welding Electrodes - 4 Items. (Only Through e-procurement) (WE-67 DT.24/08/2016, e-TENDER NO.MOIL/16-17/ET/82) | 24-08-2016 | 30-09-2016 | 30-09-2016 | 30-09-2016 | 3:30 PM | Active | View |
24. | Construction of 150 HP, 170 HP,10 HP pump Foundation and Shed at 6no. North section Tirodi Mine (TRD/Civil/A/2016-17/TRD/1401A Dated07.08.2016) | 23-08-2016 | 31-08-2016 | 31-08-2016 | 31-08-2016 | 4:30 PM | Active | View |
25. | Providing and fixing Glass Partition and Ceiling work for Union Office at Central Laboratory at MOIL Bhawan, Nagpur. (Civil /HO/16-17 /HO/33 Dated - 23/08/2016) | 23-08-2016 | 31-08-2016 | 31-08-2016 | 31-08-2016 | 3:30 PM | Active | View |
26. | PURCHASE OF ROTARY SCREW COMPRESSOR WITH AIR DRIER FOR I.M.B PLANT AT BALAGHAT MINE - 1 SET. (AS PER ANNEXURE - A ENCLOSED) (PUR/MOIL/C-4/112/E-32/952-M DT.22/08/2016) | 23-08-2016 | 14-09-2016 | 14-09-2016 | 14-09-2016 | 3:30 PM | Active | View |
27. | RECASTING OF 6 NOS. CONTACT CLAMP OF FERRO MANGANESE PLANT (TE/MOIL/BGT/FMP/ELECT/16-17/446 DT. 23/08/2016) | 23-08-2016 | 29-09-2016 | 29-09-2016 | 29-09-2016 | 4:30 PM | Active | View |
28. | Extension of Compressor Shed Building at 5th Level at Balaghat Mine. ( Civil /HO/16-17 /BGT/25 Dated - 22/08/2016 ) | 22-08-2016 | 30-08-2016 | 30-08-2016 | 30-08-2016 | 3:30 PM | Active | View |
29. | Equipping of 32 Fill pass winze of 3.6 Mtr dia and 168 Mtr depth with buntons, sollars and ladders at Balaghat Mine. (SDGM (MECH)/Tender-32 Fill pass-winze/2016-17/285) | 22-08-2016 | 20-09-2016 | 20-09-2016 | 20-09-2016 | 3:30 PM | Active | View |
30. | AIR RECEIVER TANK FOR VARIOUS MINES - 9 NOS. (CAP.0.5 CU.M - 7 NOS. AND CAP.3 CU.M - 2 NOS.) (AS PER ANNEXURE - C ENCLOSED) (Only Through e-procurement) (WE-61 DT.22/08/2016, e-TENDER NO.MOIL/16-17/ET/79) | 22-08-2016 | 07-10-2016 | 07-10-2016 | 07-10-2016 | 3:30 PM | Active | View |
31. | Land Scapping and Plantation for development of garden at Guest House at tirodi mine (Civil/HO/2016-17/TRD/420 Dated 14.08.2016) | 20-08-2016 | 30-08-2016 | 30-08-2016 | 30-08-2016 | 4:30 PM | Active | View |
32. | Purchase of Sand for sand Stowing Plant at Balaghat Mine (Gr.-I/CGM(PR)/CONT/PUR-SAND/12/BGT/16-17/8) | 20-08-2016 | 08-09-2016 | 08-09-2016 | 08-09-2016 | 3:30 PM | Active | View |
33. | Providing, Supplying and installation of 2 x 250 KVAR, 11 KV Outdoor Type HT Capacitor Bank for 2 x 700 KW, 11 KV Compressor of Balaghat Mine. (SDGM(E)/8/ BGT/16-17/ 163 ) | 20-08-2016 | 23-09-2016 | 23-09-2016 | 23-09-2016 | 3:30 PM | Active | View |
34. | KEPS FOR CAGES OF KANDRI MINE - 4 SETS. (AS PER ANNEXURE - C ENCLOSED) (Only Through e-procurement) (WE-58 DT.19/08/2016, e-TENDER NO.MOIL/16-17/ET/77) | 20-08-2016 | 27-09-2016 | 27-09-2016 | 27-09-2016 | 3:30 PM | Active | View |
35. | D.C MOTOR - 350 H.P, 1000 RPM - 1 NO. AND 450 H.P, 1000 RPM - 1 NO. FOR BALAGHAT MINE (AS PER ANNEXURE - C ENCLOSED) (Only Through e-procurement) (WE-60 DT.20/08/2016, e-TENDER NO.MOIL/16-17/ET/76) | 20-08-2016 | 17-10-2016 | 17-10-2016 | 17-10-2016 | 3:30 PM | Active | View |
36. | D.C MOTOR - 350 H.P, 1000 RPM - 1 NO. AND 450 H.P, 1000 RPM - 1 NO. FOR BALAGHAT MINE (AS PER ANNEXURE - C ENCLOSED) (Only Through e-procurement) (WE-60 DT.20/08/2016, e-TENDER NO.MOIL/16-17/ET/76) | 20-08-2016 | 17-10-2016 | 17-10-2016 | 17-10-2016 | 3:30 PM | Active | View |
37. | Supply, installation, commissioning and two years on-site comprehensive warranty maintenance of wired/wireless networking equipment with necessary accessories at Balaghat Mine And Ukwa mine. (BGT/SYSTEM/NETWORKING/2016-17/3705 DT. 19/08/2016) | 19-08-2016 | 25-08-2016 | 25-08-2016 | 25-08-2016 | 4:30 PM | Active | View |
38. | Construction of Store room for heavy vehicle in work shop premises at Dongri Buzurg Mine. (Civil /HO/16-17 / DB/26 Dated - 19/08/2016) | 19-08-2016 | 30-08-2016 | 30-08-2016 | 30-08-2016 | 3:30 PM | Active | View |
39. | Designing, supplying, providing, installation and commissioning of 450 HP DC Drive and PLC Control Panel including SCADA and PLC based distributed signalling system for Skip Winder of Balaghat Mine.(SDGM(E)/8/ BGT/16-17/ 157) | 18-08-2016 | 07-09-2016 | 07-09-2016 | 07-09-2016 | 03:30 PM | Active | View |
40. | Picking and collection of SM grade Mn ore from dumps at Munsar Mine(GM(M)-III/CONT/SM/30/MUN/2016-17/30) | 17-08-2016 | 24-08-2016 | 24-08-2016 | 24-08-2016 | 03:30 PM | Active | View |
41. | Reduction of Manganese Ore on Conversion basis for EMD Plant, Dongri Buzurg Mine.( MOIL/16-17/ET/75) | 17-08-2016 | 16-09-2016 | 16-09-2016 | 16-09-2016 | 03:30 PM | Active | View |
42. | providing and fixing vitrified tiles in floor and dodo at MOIL HOSPITAL premises at Tirodi Mine ( TRD/Civil/A/2016-17/TRD/907B Dated 07.08.2016 ) | 16-08-2016 | 25-08-2016 | 25-08-2016 | 25-08-2016 | 4:30 PM | Active | View |
43. | Construction of Cement Concrete Road in Devnara, Pavnara, Pathri, Distt Bhandara under CSR. (Civil /HO/16-17/ CSR/BHN/32 Dated - 16/08/2016) | 16-08-2016 | 31-08-2016 | 31-08-2016 | 31-08-2016 | 3:30 PM | Active | View |
44. | Construction of Classrooms for conducting vocational Training at Deaf and Dumb Residential School, Saoner under CSR. (Civil /HO/16-17/ CSR/NGP/31 Dated - 16/08/2016) | 16-08-2016 | 31-08-2016 | 31-08-2016 | 31-08-2016 | 3:30 PM | Active | View |
45. | Construction of Multipurpose Community hall at Tahsil Baihar Distt Balaghat and Village Dongri Buzurg Distt Bhandara Under CSR..(Civil/HO/16-17/BGT/BHN/CSR/19- DT.08/08/2016) | 16-08-2016 | 02-09-2016 | 02-09-2016 | 02-09-2016 | 03:30 PM | Active | View |
46. | Loading of crude into truck manually from differenct sections of Tirodi Mine(GR.II/GM(M)/CONT/LOADING/30/TRD/2016-17/18) | 12-08-2016 | 22-08-2016 | 22-08-2016 | 22-08-2016 | 03:30 PM | Active | View |
47. | Cement Concrete Road at Village Lagma District Balaghat Under CSR.(Civil/HO/16-17/BGT/CSR/20 DT.08/08/2016) | 12-08-2016 | 31-08-2016 | 31-08-2016 | 31-08-2016 | 03:30 PM | Active | View |
48. | Drilling of Bore Wells and Installation of Hand pumps at different villages of District Balaghat in ( M.P.) and District Bhandara and Nagpur in ( M.S.) under CSR.(Civil /HO/16-17/CSR/BGT/BHN/NGP/24 Dt 12/08/2016) | 12-08-2016 | 26-08-2016 | 26-08-2016 | 26-08-2016 | 03:30 PM | Active | View |
49. | Construction of RCC Storm Water Drain at Village Umari, Tahsil Saoner, Distt Nagpur Under CSR.(Civil /HO/16-17/ CSR/NGP/22 Dated - 12/08/2016) | 12-08-2016 | 26-08-2016 | 26-08-2016 | 26-08-2016 | 03:30 PM | Active | View |
50. | Construction of Girls Toilet at Kashidevi High School, Musewadi, Tahsil Ramtek, Distt- Nagpur.(Civil /HO/16-17 /CSR/NGP/23 Dated - 12/08/2016) | 12-08-2016 | 26-08-2016 | 26-08-2016 | 26-08-2016 | 03:30 PM | Active | View |
51. | Construction of Bus Shelter, Public Toilets and deepening of water Pond in Village Rampayali, Distt Balaghat under CSR..(Civil /HO/16-17 /CSR/BGT/27 Dated - 12/08/2016) | 12-08-2016 | 30-08-2016 | 30-08-2016 | 30-08-2016 | 03:30 PM | Active | View |
52. | Construction of Cement Concrete Road at Village Rantoli (Dongri Buzurg) District Bhandara Under CSR..(Civil/HO/16-17/CSR/BHN/21 DT 08/08/2016) | 12-08-2016 | 02-09-2016 | 02-09-2016 | 02-09-2016 | 03:30 PM | Active | View |
53. | Undercarriage Assemblies for various Drilling Machines.(PUR/MOIL/C-5/75/WE-13 (MOIL/16-17/ET/74)) | 12-08-2016 | 07-09-2016 | 07-09-2016 | 07-09-2016 | 03:30 PM | Active | View |
54. | WEBSITE SINGLE/PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM PURCHASE OF GYMNASIUM ITEM VIZ. AEROFIT COMMERCIAl ELLIPTICAL (AF-6690E) - 1NO.(PUR/MOIL/C-4/301/E-28/860-M Dt.11/08/2016) | 11-08-2016 | 18-08-2016 | 18-08-2016 | 18-08-2016 | 03:30 PM | Active | View |
55. | Underground cocnreting for stope block preparation at Munsar Mine(GM(M)-III/CONT/23/U/G-cont/MUN/2016-17/27) | 11-08-2016 | 19-08-2016 | 19-08-2016 | 19-08-2016 | 03:30 PM | Active | View |
56. | Cleaning of surplus underground ROM at Munsar Mine(GM(M)-III/CONT/29/S-U/G-ROM/MUN/2016-17/29) | 11-08-2016 | 19-08-2016 | 19-08-2016 | 19-08-2016 | 03:30 PM | Active | View |
57. | Sinking of four winzes from minus 30 ft level and minu 130 ft level by Drop Raising Method at Munsar Mine(GM(M)-III/CONT/09/Winze/MUN/2016-17/28) | 11-08-2016 | 19-08-2016 | 19-08-2016 | 19-08-2016 | 03:30 PM | Active | View |
58. | Maintenance, distribution and collection of Cap Lamp at Chikla Mine(TE/CH/ELECT/16-17/406 dated 08.08.2016) | 11-08-2016 | 23-08-2016 | 23-08-2016 | 23-08-2016 | 04:30 PM | Active | View |
59. | Repairing of Bucket PC 450 Hyd Excvator of Tirodi Mine.(SDGM/MECH/TRD/16-17/211/392) | 11-08-2016 | 20-08-2016 | 20-08-2016 | 20-08-2016 | 03:30 PM | Active | View |
60. | Maintenance, distribution and collection of Cap Lamp at Chikla Mine(TE/CH/ELECT/16-17/406 dated 08.08.2016) | 11-08-2016 | 23-08-2016 | 23-08-2016 | 23-08-2016 | 04:30 PM | Active | View |
61. | Designing, supplying, providing, installation and commissioning of DC Drive and PLC Control Panel including SCADA and PLC based distributed signalling system for Cage Winder of Holmes Shaft of Balaghat Mine(SDGM(E)/8/ BGT/16-17/ 151) | 10-08-2016 | 07-09-2016 | 07-09-2016 | 07-09-2016 | 03:30 PM | Active | View |
62. | Cement Concrete Road at Village Tavejhari and Bhatera District Balaghat Under CSR.(CIVIL/HO/16-17/BGT/CSR/18) | 09-08-2016 | 31-08-2016 | 31-08-2016 | 31-08-2016 | 03:30 PM | Active | View |
63. | Construction of New Ventilation Fan Room Portal Evasee at 170 level at Munsar Mine.(Civil /HO/16-17/MUN /17 Dt 06/08/2016) | 08-08-2016 | 19-08-2016 | 19-08-2016 | 19-08-2016 | 03:30 PM | Active | View |
64. | PNEUMATICALLY OPERATED ANGLE GRINDER FOR VARIOUS MINES - 14 NOS. (AS PER ANNEXURE - C ENCLOSED) (Only Through e-procurement)(WE-57 DT.08/08/2016, e-TENDER NO.MOIL/16-17/ET/70) | 08-08-2016 | 08-09-2016 | 08-09-2016 | 08-09-2016 | 03:30 PM | Active | View |
65. | Handling of spillage ore and fines in IMB plant,Dongri Buzurg Mine.(Agen and DGM(M)/DB/IMB/16-17/368) | 06-08-2016 | 16-08-2016 | 16-08-2016 | 16-08-2016 | 04:30 PM | Active | View |
66. | Transportation of Copper Mill Tailing from Ukwa Mine to Balaghat Mine for stowing purpose(Gr.-I/CGM(PR)/CONT/MILL TAILING/11/BGT/16-17/7) | 06-08-2016 | 12-08-2016 | 12-08-2016 | 12-08-2016 | 03:30 PM | Active | View |
67. | PURCHASE OF SAFETY BELTS.(PUR/MOIL/C-1/190/E-29/862-M Dt. 06/08/2016) | 06-08-2016 | 26-08-2016 | 26-08-2016 | 26-08-2016 | 03:30 PM | Active | View |
68. | Picking and collection of LGHS (O/C) ore from dumps through off the pit working at Gumgaon Mine(GM(M)-III/CONT/21/GUM/P and C DUMP/2016-17/26) | 05-08-2016 | 12-08-2016 | 12-08-2016 | 12-08-2016 | 03:30 PM | Active | View |
69. | PURCHASE OF RUBBER TUB BUFFER.(PUR/MOIL/C-12/13/E-30/866-M Dt. 05/08/2016) | 05-08-2016 | 26-08-2016 | 26-08-2016 | 26-08-2016 | 03:30 PM | Active | View |
70. | Blanket Rate Contract for supply of various all types and sizes of Bearings, Sleeves with Nuts, C.I. Pedestal Etc.(WE-41 DT.04/08/2016 (e-Tender No.MOIL/16-17/ET/68)) | 05-08-2016 | 13-09-2016 | 13-09-2016 | 13-09-2016 | 03:30 PM | Active | View |
71. | PURCHASE OF CENTRIFUGAL MULTISTAGE PUMP - BARE, MAKE MAXFLOW PUMPS INDIA PVT.LIMITED - 1 NO. FOR BALAGHAT MINE (AS PER ANNEXURE - A ENCLOSED).(PUR/MOIL/C-4/78/E-27/855-M DT.04/08/2016) | 04-08-2016 | 07-09-2016 | 07-09-2016 | 07-09-2016 | 03:30 PM | Active | View |
72. | REPAIRING OF TRACK CHAIN ASSY- 2 Nos,SPROCKET ASSY- 2 Nos AND IDLER ASSY- 2 Nos OF DI 500 No.1 SANDVIK MAKE DRILLING MACHINE OPERATING AT DONGRI BUZURG MINE(A-II/CHK/DB/16-17/387 dtd 03.08.2016) | 03-08-2016 | 09-08-2016 | 09-08-2016 | 09-08-2016 | 04:30 PM | Active | View |
73. | Cleaning of surplus underground and open cast ROM at Kandri Mine(GM(Mines)-III/CONT/22/CL-S-ROM/KAN/2016-17/24) | 03-08-2016 | 10-08-2016 | 10-08-2016 | 10-08-2016 | 03:30 PM | Active | View |
74. | Construction Drain in front of country tiles roof south staff quarters at Tirodi Mine(Civil/HO/2016-17/TRD/333 Dated 16.07.2016) | 03-08-2016 | 13-08-2016 | 13-08-2016 | 13-08-2016 | 04:30 PM | Active | View |
75. | Construction of Stone Masonary retaining wall at Mine area Sitapatore(Civil/HO/2016-17/SITA/332 Dated 16.07.2016) | 03-08-2016 | 13-08-2016 | 13-08-2016 | 13-08-2016 | 04:30 PM | Active | View |
76. | DISPOSAL OF SLUDGE AT EMD PLANT AT EMD PLANT D.B. MINE(MOIL/EMD/CH/ADGM/2016-17/386 dtd 03.08.2016) | 03-08-2016 | 17-08-2016 | 17-08-2016 | 17-08-2016 | 04:30 PM | Active | View |
77. | Picking and collection of SM grade Mn ore from dumps at Munsar Mine(GM(M)-III/CONT/27/P AND C -DUMP/MUN/16-17/25) | 02-08-2016 | 10-08-2016 | 10-08-2016 | 10-08-2016 | 03:30 PM | Active | View |
78. | Development of Bio diversity park with chain link fencing at Gumgaon Mine(CIVIL/GUM/16-17/1321 DT 30.07.2016) | 02-08-2016 | 11-08-2016 | 11-08-2016 | 11-08-2016 | 03:30 PM | Active | View |
79. | Trench cutting in ore stacks for sampling at Tirodi Mine(GR.II/GM(M)/CONT/TRENCH-CUT/29/TRD/2016-17/17) | 02-08-2016 | 11-08-2016 | 11-08-2016 | 11-08-2016 | 03:30 PM | Active | View |
80. | Laying of CC flooring besides B and c type quarters at Gumgaon Mine(CIVIL/GUM/16-17/1320 DT 30.07.2016) | 02-08-2016 | 11-08-2016 | 11-08-2016 | 11-08-2016 | 03:30 PM | Active | View |
81. | Construction of Anaerobic type septic tank at Gumgaon Mine(CIVIL/GUM/16-17/1343 DT 02.08.2016) | 02-08-2016 | 11-08-2016 | 11-08-2016 | 11-08-2016 | 03:30 PM | Active | View |
82. | Supplying and filling of Non flotable type HDPE or PP filling media at GUmgaon Mine(CIVIL/GUM/16-17/1319 DT 30.07.2016) | 02-08-2016 | 19-08-2016 | 19-08-2016 | 19-08-2016 | 03:30 PM | Active | View |
83. | Interior Renovation Works for Mine Managers Cabin, Conference Room and PA Rooms of Main Administrative Building at Balaghat Mine(83/Civil/BGT/16-17/3203 Date 31.07.2016) | 01-08-2016 | 12-08-2016 | 12-08-2016 | 12-08-2016 | 04:30 PM | Active | View |
84. | Construction of Toilet and Bathroom at Premises of MOIL Canteen at Tirodi Mine(Civil/HO/2016-17/TRD/330 Dated 16.07.2016) | 30-07-2016 | 09-08-2016 | 09-08-2016 | 09-08-2016 | 04:30 PM | Active | View |
85. | Monsoon preparatory works for repar to RCC roof of labour staff quarter officers quarters at Tirodi(Civil/HO/2016-17/TRD/327 Dated 16.07.2016) | 30-07-2016 | 12-08-2016 | 12-08-2016 | 12-08-2016 | 04:30 PM | Active | View |
86. | Removal of spillage material during hoisting of skip from 15th Level Production Shaft at Balaghat Mine(Agent SDGM(M)/BGT/Mining/16-17/3145 Date 28.07.16) | 29-07-2016 | 08-08-2016 | 08-08-2016 | 08-08-2016 | 04:30 PM | Active | View |
87. | Replacing old damaged A.C. Sheet with colour coated Galvalume profile sheet of D.G. Set Shed at MOIL Bhawan premises,MOIL,Nagpur.(Civil /HO/16-17 /HO/16 Dated - 28/07/2016) | 28-07-2016 | 09-08-2016 | 09-08-2016 | 09-08-2016 | 03:30 PM | Active | View |
88. | Providing and Fixing MS Door old Residential Quarter at Tirodi Mine(Civil/HO/2016-17/TRD/334 Dated 16.07.2016) | 28-07-2016 | 09-08-2016 | 09-08-2016 | 09-08-2016 | 04:30 PM | Active | View |
89. | Pushing and unloading of ROM and rock tubs in underground and on surface at Gumgaon Mine(GM(M)-III/CONT/28/Tub/GUM/16-17/23) | 28-07-2016 | 04-08-2016 | 04-08-2016 | 04-08-2016 | 03:30 PM | Active | View |
90. | PURCHASE OF SHOT FIRING CABLE(PUR/MOIL/C-3/30/E-26/812-M DT.27/07/2016) | 28-07-2016 | 10-08-2016 | 10-08-2016 | 10-08-2016 | 03:30 PM | Active | View |
91. | Construction of Drain in front of country tiles roof south staff quarters and near A type quarters(Civil/HO/2016-17/TRD/333 dated 16.07.2016) | 28-07-2016 | 13-08-2016 | 13-08-2016 | 13-08-2016 | 04:30 PM | Active | View |
92. | Construction of stone masonry retaining wall at mine area at Sitapator(Civil/HO/2016-17/SITA/332 dated 16.07.2016) | 28-07-2016 | 13-08-2016 | 13-08-2016 | 13-08-2016 | 04:30 PM | Active | View |
93. | Construction of store room and tool room at Sitapatore Mine(Civil/HO/2016-17/Sita/331 dated 16.07.2016) | 28-07-2016 | 13-08-2016 | 13-08-2016 | 13-08-2016 | 04:30 PM | Active | View |
94. | Removal of waste rock and manganiferrous rock and handling the same by mech. means at Old Satuk section at Beldongri Mine(MOIL/2016-17/ET/67) | 28-07-2016 | 30-08-2016 | 30-08-2016 | 30-08-2016 | 03:30 PM | Active | View |
95. | Construction of Shed for Sabhamandap at Village Fetri,Dist-Nagpur Under MOIL CSR.(Civil /HO/16-17 /CSR/15 Dated - 25/07/2016) | 26-07-2016 | 03-08-2016 | 03-08-2016 | 03-08-2016 | 03:30 PM | Active | View |
96. | Requirement of Special Purpose CTD Rod Turning Machine for Balaghat Mine(BGT/MECH/CTD/16-17/3055 Date 24/07/2016) | 25-07-2016 | 09-08-2016 | 09-08-2016 | 09-08-2016 | 04:30 PM | Active | View |
97. | Transportation of Mn ore from Gumgaon Mine siding to Kandri Mine siding(GM(M)-III/CONT/20/TRANS-MN-ORE/GUM-KAN/16-17/22) | 25-07-2016 | 02-08-2016 | 02-08-2016 | 02-08-2016 | 03:30 PM | Active | View |
98. | UG CONCRETING WORK AT (-) 1750 L AT UKWA MINE(Gr.-I/CGM(PR)/CONT/UG-CONC/8/UK/16-17/6) | 25-07-2016 | 03-08-2016 | 03-08-2016 | 03-08-2016 | 03:30 PM | Active | View |
99. | Construction of Ventilation fan house at 40 feet level (CH- 1690) at Chikla mine( TE/CH/Civil/16-17/352 dated 19/07/2016) | 23-07-2016 | 26-07-2016 | 26-07-2016 | 26-07-2016 | 03:30 PM | Active | View |
100. | Providing and fixing of M.S. door at champ quarters at Chikla Mine(TE/CH/Civil/16-17/351 dated 19/07/2016) | 23-07-2016 | 26-07-2016 | 26-07-2016 | 26-07-2016 | 03:30 PM | Active | View |
Tenders More Information |
---|
Contracts finalised on nomination basis Details of Purchase Order issued by MATERIALS DEPARTMENT valuing Rs.30.00 Lakhs & Above
List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website) |
View (2024) Year Tenders |
View (2023) Year Tenders |
View (2022) Year Tenders |
View (2021) Year Tenders |
View (2020) Year Tenders |
View (2019) Year Tenders |
View (2018) Year Tenders |
View (2017) Year Tenders |
View (2016) Year Tenders |
View (2015) Year Tenders |
View (2014) Year Tenders |
View (2013) Year Tenders |
View (2012) Year Tenders |
View (24) Year Tenders |
View Full Tender Archive |
See all MOIL tender. |