Tender Archive

Tender Archive

Title for Search Tender Issue Start Date Tender Issue End Date
S.No. Title Issue Start Date Issue Last Date Submission Last Date Opening Date Opening Time Status View
1. PURCHASE OF CEMENT CAPSULES 18-06-2013 09-07-2013 10-07-2013 10-07-2013 3:30PM Active View
2. LOADING OF MN. ORE INTO TRUCKS FOR DESPATCHES OF ORE AT UKWA MINE 17-06-2013 25-06-2013 25-06-2013 25-06-2013 3:00PM Active View
3. Construction of Community Centre at Tumsar Distt. Bhandara Under MOIL CSR. 17-06-2013 09-07-2013 11-07-2013 11-07-2013 3:30PM Active View
4. Recovery of SM grade BGL-462, Balaghat 15-06-2013 25-06-2013 25-06-2013 25-06-2013 3:00PM Active View
5. PURCHASE OF M.S.PIPES OF ASSORTED SIZES. 14-06-2013 04-07-2013 05-07-2013 05-07-2013 3:30PM Active View
6. Replacement of old A.C. Sheet roof with new profile UPVC Sheet roofing of Rajeev Gandhi Hall at Balaghat Mine. 14-06-2013 24-06-2013 25-06-2013 25-06-2013 3:30PM Active View
7. Recovery of LGHS ore from Magazine Dump by off the pit working at Dongri Buzurg Mine 14-06-2013 25-06-2013 25-06-2013 25-06-2013 3:00PM Active View
8. PURCHASE OF LEATHER SHOES PREFERABLY MILITARY PATTERN OR EQUIVALENT. 14-06-2013 04-07-2013 05-07-2013 05-07-2013 3:30PM Active View
9. PURCHASE OF LEATHER SHOES PREFERABLY MILITARY PATTERN OR EQUIVALENT. 14-06-2013 04-07-2013 05-07-2013 05-07-2013 3 Active View
10. PURCHASE OF PNEUMATICALLY OPERATED AIR WINCH CAPACITY - 1 TON, 8 NOS. 14-06-2013 11-07-2013 12-07-2013 12-07-2013 3:30PM Active View
11. PURCHASE OF ELECTRICALLY OPERATED SUBMERSIBLE EFFLUENT PUMP SETS, 3 NOS. 14-06-2013 11-07-2013 12-07-2013 12-07-2013 3:30PM Active View
12. PURCHASE OF TERMINAL CONNECTOR 14-06-2013 07-07-2013 08-07-2013 08-07-2013 3:30PM Active View
13. PURCHASE OF LEATHER SHOES PREFERABLY MILITARY PATTERN OR EQUIVALENT. (PUR/MOIL/C-1/185/E-36/531-M ) 14-06-2013 25-07-2013 26-07-2013 26-07-2013 3:30PM Active View
14. PURCHASE OF HMI SCREEN WITH POWER SUPPLY UNIT 13-06-2013 02-07-2013 03-07-2013 03-07-2013 3:30PM Active View
15. Picking and collection of SM gr. Mn ore MSL-478,437,447 and 498 from Pandadai and 270L at Munsar 12-06-2013 18-06-2013 19-06-2013 19-06-2013 3:00PM Active View
16. Picking and collection of SM gr.Mn ore MSL-478,437,447 and 498 from 135L and 270L East dump at Munsar Mine 12-06-2013 18-06-2013 19-06-2013 19-06-2013 3:00PM Active View
17. rendering technical assistance services as architectural consultant and Structural Design Consultancy for Construction of Residential Type A quarters at MOIL Nagpur 12-06-2013 25-06-2013 26-06-2013 26-06-2013 3:30PM Active View
18. Recovery of Ferro grade and LGHS lumpy ore from North Dump at Tirodi Mine 11-06-2013 20-06-2013 20-06-2013 20-06-2013 3:00PM Active View
19. Recovery of 25 percent Mn lumpy and small ore from contaminated low grade ROM at Dongri Buzurg Mine 11-06-2013 20-06-2013 20-06-2013 20-06-2013 3:00PM Active View
20. Recovery of 42-44 percent lumpy ore from contaminated ROM at Dongri Buzurg Mine. 11-06-2013 20-06-2013 20-06-2013 20-06-2013 3:30PM Active View
21. Recovery of Ferro grade and LGHS lumpy ore from North Dump at Tirodi Mine 11-06-2013 20-06-2013 20-06-2013 20-06-2013 3:00PM Active View
22. Recovery of 25 percent Mn lumpy and small ore from contaminated low grade ROM at Dongri Buzurg Mine 11-06-2013 20-06-2013 20-06-2013 20-06-2013 3:00PM Active View
23. Recovery of 42-44 percent lumpy ore from contaminated ROM at Dongri Buzurg Mine. 11-06-2013 20-06-2013 20-06-2013 20-06-2013 3:30PM Active View
24. Cleaning and excavation of drain from back side of boundary wall of MOIL Bhawan premises, H.O., Nagpur. 11-06-2013 17-06-2013 18-06-2013 18-06-2013 3:30PM Active View
25. Purchase of Tramline Accessories for various Mines 08 Items (PUR/MOIL/C-12/5/WE-15) 11-06-2013 07-08-2013 08-08-2013 08-08-2013 3:30PM Active View
26. Recovery of Ferro grade and LGHS lumpy ore from Jamrapani Area at Tirodi Mine 10-06-2013 18-06-2013 18-06-2013 18-06-2013 3:00PM Active View
27. Cleaning, collection and stacking of fines at Tirodi Mine 10-06-2013 18-06-2013 18-06-2013 18-06-2013 3:00PM Active View
28. Recovery of LGHS and SM grade ore from 320 Level South dump at Chikla Mine 10-06-2013 18-06-2013 18-06-2013 18-06-2013 3:00PM Active View
29. Recovery of LGHS and SM grade ore from 320 Level North dump at Chikla Mine 10-06-2013 18-06-2013 18-06-2013 18-06-2013 3:00PM Active View
30. Purchase of Tyres Tubes and Flaps and Solid Tyres 10-06-2013 25-07-2013 26-07-2013 26-07-2013 3:00PM Active View
31. Certification Audit of Sustainable Development Projects of MOIL Limited. 07-06-2013 14-06-2013 14-06-2013 14-06-2013 3:00pm Active View
32. Pushing and unloading of ROM and rock tubs in UG on surface at Gumgaon Mine 07-06-2013 12-06-2013 13-06-2013 13-06-2013 3:00PM Active View
33. Transportation of sand from Kanhan river to sand stowing plant at Gumgaon Mine 07-06-2013 12-06-2013 13-06-2013 13-06-2013 3:30PM Active View
34. Picking and sorting of 3rd gr dump lump, SM gr LGHS and small ore from dump at Kandri Mine 07-06-2013 12-06-2013 13-06-2013 13-06-2013 3:30PM Active View
35. Drilling of one No. borewell at Sitapotar Mine. 07-06-2013 19-06-2013 20-06-2013 20-06-2013 3:30PM Active View
36. Drilling of one No. borewell at Sitapotar Mine. 07-06-2013 19-06-2013 20-06-2013 20-06-2013 3:30PM Active View
37. PURCHASE OF HYDRAULIC HAND PALLET TRUCKS, 5 TON CAPACITY 3 NOS. AND 3 TON CAPACITY 2 NOS. 07-06-2013 04-07-2013 05-07-2013 05-07-2013 3:30 PM Active View
38. WEBSITE LIMITED TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF CROSS BIT, 57 MM DIA. SUITABLE FOR CABLE BOLTING MACHINE 07-06-2013 07-07-2013 08-07-2013 08-07-2013 3:30PM Active View
39. PURCHASE OF OFFICE FURNITURE AS PER ANNEXURE - A ENCLOSED 06-06-2013 20-06-2013 21-06-2013 21-06-2013 3:30PM Active View
40. TRANSPORTATION OF COAL 06-06-2013 06-07-2013 22-07-2013 22-07-2013 3:30PM Active View
41. Purchase of Vehicle and Inverter Batteries 05-06-2013 17-07-2013 18-07-2013 18-07-2013 3:30pm Active View
42. MONITORING THE ENV. PARAMETERS OF MAHARASHTRA AND M.P. 05-06-2013 14-06-2013 14-06-2013 14-06-2013 3:00PM Active View
43. Description Breaking of metal at FMP Balaght 05-06-2013 25-06-2013 25-06-2013 25-06-2013 3:30PM Active View
44. PURCHASE OF SS WIRE MESH PANELS 05-06-2013 25-06-2013 26-06-2013 26-06-2013 3:30PM Active View
45. PURCHASE OF ELECTRICALLY OPERATED AUXILIARY VENTILATION FANS, 17 NOS. 05-06-2013 30-06-2013 01-07-2013 01-07-2013 3:30PM Active View
46. PURCHASE OF MINE VENTILATION FAN WITH MOTOR AND STARTER, 1 NO. 05-06-2013 02-07-2013 03-07-2013 03-07-2013 3:30PM Active View
47. Construction of office room with verandah, toilet and Ammonium Nitrate room in magazine at Dongri Buzurg. Mine 04-06-2013 06-06-2013 07-06-2013 07-06-2013 3:30PM Active View
48. PURCHASE OF CARBON ELECTRODE PASTE 04-06-2013 04-07-2013 15-07-2013 15-07-2013 3.30 PM Active View
49. PURCHASE OF RUBBER TUB BUFFER. 03-06-2013 23-06-2013 24-06-2013 24-06-2013 3:30PM Active View
50. PURCHASE OF IRON ORE 03-06-2013 03-07-2013 11-07-2013 11-07-2013 3.30 PM Active View
51. PURCHASE OF SQUIRREL CAGE INDUCTION MOTOR WITH BRAKE ASSEMBLY 01-06-2013 20-06-2013 21-06-2013 21-06-2013 3:30 PM Active View
52. Trench cutting in ore stacks for sampling at Tirodi Mine 01-06-2013 11-06-2013 11-06-2013 11-06-2013 3:00PM Active View
53. Recovery of 4th grade small ore by washing and picking from East of D dump at Tirodi Mine 01-06-2013 11-06-2013 11-06-2013 11-06-2013 3:00PM Active View
54. Purchase of TCT Drill Rods 01-06-2013 10-07-2013 11-07-2013 11-07-2013 3:30PM Active View
55. PURCHASE OF HDPE PIPES, BENDS AND PIPE ENDS (PUR/MOIL/C-1/199/WE-13) 01-06-2013 29-07-2013 30-07-2013 30-07-2013 3.30 PM Active View
56. NEW FLAT BOTTOM RAILWAY RAILS, 90 LBS 45 KG MTRS 31-05-2013 08-07-2013 09-07-2013 09-07-2013 3.30 PM Active View
57. PROVIDING AND APPLYING DISTEMPERING IN WEST COURT HOUSE 30-05-2013 06-06-2013 07-06-2013 07-06-2013 3.00 PM Active View
58. PURCHASE OF SPARES FOR HYDRAULIC FILTER PRESS 30-05-2013 20-06-2013 21-06-2013 21-06-2013 3.30 PM Active View
59. PURCHASE OF OLDHAM 102 TYPE MAKE CAP LAMP ETC 29-05-2013 13-06-2013 14-06-2013 14-06-2013 3.00 PM Active View
60. PURCHASE OF SEAL KIT FOR HYDRAULIC CYLINDER 28-05-2013 16-06-2013 17-06-2013 17-06-2013 3.00 PM Active View
61. Recovery of LGHS Lumpy Ore from North dump at Tirodi Mine 27-05-2013 05-06-2013 05-06-2013 05-06-2013 3.00 pm Active View
62. REMOVAL OF WASTE DUMP AND HANDLING, TIRODI MINE 27-05-2013 05-06-2013 05-06-2013 05-06-2013 3.00 PM Active View
63. PURCHASE OF PEARL COKE 27-05-2013 27-06-2013 04-07-2013 04-07-2013 3:30PM Active View
64. PURCHASE OF MULTIFILAMENT FILTER CLOTH 24-05-2013 13-06-2013 14-06-2013 14-06-2013 3:30PM Active View
65. Providing and Planting 4000 No. Tree Plantation in MSRPF compus at Hingna Nagpur. 23-05-2013 29-05-2013 30-05-2013 30-05-2013 3:30PM Active View
66. HUTCH DRAIN CLEANING OF JIG SECTION OF OCF AT BALAGHAT MINE 23-05-2013 31-05-2013 31-05-2013 31-05-2013 3:00PM Active View
67. Recovery of SM Grade ore from North Side of Viraswami dump at Tirodi Mine. 22-05-2013 31-05-2013 31-05-2013 31-05-2013 3:00PM Active View
68. Breaking, sizing and sorting of lumpy ore, S. M. Gr. 25 per Mn MSL-447 at Munsar Mine 21-05-2013 23-05-2013 24-05-2013 24-05-2013 4:30 PM Active View
69. Screening, picking, collection and stacking of 25 per Mn small ore MSL-498 through trommel at Munsar Mine from Pandadia Dump. 21-05-2013 23-05-2013 24-05-2013 24-05-2013 4:30PM Active View
70. Pushing and unloading of ROM and rock tubs in underground and on surface at Gumgaon Mine 20-05-2013 27-05-2013 28-05-2013 28-05-2013 3:00PM Active View
71. Purchase of Cement 43 Grade OPC Equivalent PPC conforming to IS specifications with latest amendment 20-05-2013 20-06-2013 27-06-2013 27-06-2013 3:30PM Active View
72. Transportation of sand from Kalaphata Ghat of MOIL situated on Pench river at Kandri Mine 17-05-2013 23-05-2013 24-05-2013 24-05-2013 3:00PM Active View
73. Construction of Sump near Guest House, East Court, MOIL, Nagpur 17-05-2013 24-05-2013 27-05-2013 27-05-2013 3:30PM Active View
74. PURCHASE OF MEASURING POCKET AND LAUNDER ASSEMBLY, 2 SETS. 17-05-2013 27-06-2013 28-06-2013 28-06-2013 3:30PM Active View
75. Picking and collection of UK-4445 and UKL-448 from Hanging wall dump from Ch.6800 to Ch.8600 at Ukwa Mine 16-05-2013 22-05-2013 22-05-2013 22-05-2013 3:00PM Active View
76. Cleaning of surplus ROM of OC development to recover Ferro grade and LGHS ore at Gudma Section of Ukwa Mine 16-05-2013 24-05-2013 24-05-2013 24-05-2013 3:00PM Active View
77. Underground development at 70 ft L and 170 ft L at Munsar Mine 16-05-2013 14-06-2013 17-06-2013 17-06-2013 3:00PM Active View
78. Transportation of sand from kanhan River to Sand stowing plant at Gumgaon Mine 15-05-2013 21-05-2013 22-05-2013 22-05-2013 3:00 PM Active View
79. Painting and allied works on third floor MOIL Bhawan at Nagpur 15-05-2013 27-05-2013 28-05-2013 28-05-2013 3:30PM Active View
80. Construction of 02 sets Toilet block near BDC and Workshop at Kandri Mine. 14-05-2013 27-05-2013 28-05-2013 28-05-2013 3:30pm Active View
81. Construction of shed near Pit office of Vertical shaft at Kandri Mine. 14-05-2013 27-05-2013 28-05-2013 28-05-2013 3:30pm Active View
82. Construction of 02 Nos Vehicle shed near work shop at Kandri Mine. 14-05-2013 27-05-2013 28-05-2013 28-05-2013 3:30pm Active View
83. Construction of drain septic tank, soak pits, chambers at Kaichi camps at Munsar Mine. 14-05-2013 27-05-2013 28-05-2013 28-05-2013 3:30pm Active View
84. Hiring of MIn 1000 KVA, 415V, DG SET for Balaghat Mine 13-05-2013 30-05-2013 30-05-2013 30-05-2013 3:00PM Active View
85. Collection of Mn fines from different sorting areas at Munsar Mine 11-05-2013 16-05-2013 17-05-2013 17-05-2013 4:00PM Active View
86. Water proofing treatment to RCC Roof slab of vehical garage Bungalow No. 1 MOIL Nagpur 10-05-2013 22-05-2013 23-05-2013 23-05-2013 3:30PM Active View
87. Providing and constraction of water drain for the quarters near Hospital Upper camp Chikla Mine. 10-05-2013 22-05-2013 23-05-2013 23-05-2013 3:30PM Active View
88. Providing New gate along with Name Board for Z.P. Girls School Katol Road Nagpur, Under MOIL CSR 09-05-2013 18-05-2013 20-05-2013 20-05-2013 3:30PM Active View
89. Water proofing treatment by Dr.Fixit torch shield roll over Manglore tiled roof atTirodi Mine 09-05-2013 22-05-2013 23-05-2013 23-05-2013 3:30PM Active View
90. Drilling of 2 Nos. Borewells at Tirodi Mine 09-05-2013 22-05-2013 23-05-2013 23-05-2013 3:30PM Active View
91. PURCHASE OF SULPHURIC ACID 09-05-2013 30-05-2013 31-05-2013 31-05-2013 3:30PM Active View
92. Cleaning of Surplus ROM at Sitapatore and Sukli Mine 08-05-2013 17-05-2013 17-05-2013 17-05-2013 3:00PM Active View
93. Recovery of 25 percent SM Grade lumpy and small ore from Jhiriya dump by off the pit working at Dongri Buzurg Mine 08-05-2013 17-05-2013 17-05-2013 17-05-2013 3:00PM Active View
94. PURCHASE OF CHAIN PULLEY BLOCK ASSEMBLY, 11 NOS. CAP. 3 TONNES, 4 NOS. AND CAP. 5 TONNES, 7 NOS. 06-05-2013 02-06-2013 03-06-2013 03-06-2013 3:30PM Active View
95. Removal of old waste rock and handling the same by mech. means at Munsar Mine 03-05-2013 09-05-2013 10-05-2013 10-05-2013 3:00 PM Active View
96. Loading and Unloading steel section, cement bags and other materials with stacking at Balaghat Mine 02-05-2013 10-05-2013 10-05-2013 10-05-2013 3:00PM Active View
97. PURCHASE OF 1.10 KW UNBALANCE VIBRATOR MOTOR, MAKE ELEKTROMAG JOEST VIBRATION PVT. LTD., 2 NOS. 02-05-2013 30-05-2013 31-05-2013 31-05-2013 3:30PM Active View
98. PURCHASE OF 3.3 KV, SOFT STARTER PANEL FCMA TECHNOLOGY BASED SUITABLE FOR OPERATION OF 422 HP CENTRIFUGAL WATER PUMP SET, 1 NO. 02-05-2013 30-05-2013 31-05-2013 31-05-2013 3:30PM Active View
99. CORRIGENDUM - PURCHASE OF 3.3 KV SOFT STARTER PANEL ETC 02-05-2013 16-06-2013 17-06-2013 17-06-2013 3.30 PM Active View
100. PURCHASE OF RUBBER TUB BUFFER. 01-05-2013 21-05-2013 22-05-2013 22-05-2013 3:30PM Active View

Tenders More Information

Details of Purchase Order issued by MATERIALS DEPARTMENT valuing Rs.30.00 Lakhs & Above

 Details of Purchase Order issued by MATERIALS DEPARTMENT valuing Rs.5.00 Lakhs & Above


List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website)

View (2027) Year Tenders
View (2025) Year Tenders
View (2024) Year Tenders
View (2023) Year Tenders
View (2022) Year Tenders
View (2021) Year Tenders
View (2020) Year Tenders
View (2019) Year Tenders
View (2018) Year Tenders
View (2017) Year Tenders
View (2016) Year Tenders
View (2015) Year Tenders
View (2014) Year Tenders
View (2013) Year Tenders
View (2012) Year Tenders
View (24) Year Tenders
View Full Tender Archive
See all MOIL tender.