1. | Construction of substation building at 50-52 section at Tirodi Mine(MOIL/18-19/ET/392) | 09-01-2019 | 08-02-2019 | 08-02-2019 | 08-02-2019 | 03:30 PM | Active | और देखें |
2. | Maintenance of water filtration plant and operation and mainetnence of water supply scheme for new A type quarters at Tirodi Mine(MOIL/18-19/ET/382) | 09-01-2019 | 08-02-2019 | 08-02-2019 | 08-02-2019 | 03:30 PM | Active | और देखें |
3. | Painting to plant structure of Integreted Manganese Benificiation plant IMB, at Balaghat Mine(MOIL/18-19/ET/389) | 09-01-2019 | 08-02-2019 | 08-02-2019 | 08-02-2019 | 03:30 PM | Active | और देखें |
4. | Purchase of Crawler Mounted Side Dump Loader for Munsar Mine - 1 No.(2 Lots)(Only Through e-procurement)(WE-125 DT.07/01/2019 (MOIL/18-19/ET/395)) | 08-01-2019 | 04-02-2019 | 04-02-2019 | 05-02-2019 | 03:30 PM | Active | और देखें |
5. | Purchase of Load Haul Dump Machines along with all the spares (except oil and lubricants) required for operation and maintenance of offered equipment for 2000 Hours of operation for various mines - 3 Nos. (4 Lots)(Only Through e-procurement)(WE-124 DT.07/ | 08-01-2019 | 05-02-2019 | 05-02-2019 | 06-02-2019 | 03:30 PM | Active | और देखें |
6. | Supply of Timber (as per Annexure C Enclosed) (27 Lots)(Only Through e-procurement)( WE-118 DT.07/01/2019 (MOIL/18-19/ET/393)) | 08-01-2019 | 05-02-2019 | 05-02-2019 | 06-02-2019 | 03:30 PM | Active | और देखें |
7. | Purchase of Flange Mounted 37KW Sq Cage IM of Lakshmi Hydraulic Pvt Ltd(TE/18-19/1317) | 07-01-2019 | 25-01-2019 | 25-01-2019 | 25-01-2019 | 04:00 PM | Active | और देखें |
8. | Erection of new HT Overhead line from Gadhaghat 2nd Vertical substation to proposed Gadhaghat Ventilation Fan at Chikla Mine(MOIL/18-19/ET/385) | 07-01-2019 | 06-02-2019 | 06-02-2019 | 06-02-2019 | 03:30 PM | Active | और देखें |
9. | Hiring of equipments for removal of sub grade mineral reject of Underground ROM to recover SM Grade at Balaghat Mine(MOIL/18-19/ET/391) | 07-01-2019 | 07-02-2019 | 07-02-2019 | 07-02-2019 | 03:30 PM | Active | और देखें |
10. | Removal of Underground sub grade mineral reject and handling the same by mechanical means at Ukwa Mine(MOIL/18-19/ET/390) | 07-01-2019 | 07-02-2019 | 07-02-2019 | 07-02-2019 | 03:30 PM | Active | और देखें |
11. | Operation of dump screen to recover BGL-523 at Balaghat Mine(Mining/BGT/18-19/5831 Date 03.01.2019) | 04-01-2019 | 10-01-2019 | 10-01-2019 | 10-01-2019 | 04:30 PM | Active | और देखें |
12. | Procurement, Installation and Commissioning of HT VCB Panel, LT ACB Panel and transformer for operation of proposed 250 HP Ventilation fan at Gadhaghat of Chikla Mine(MOIL/18-19/ET/384) | 04-01-2019 | 04-02-2019 | 04-02-2019 | 04-02-2019 | 03:30 PM | Active | और देखें |
13. | PURCHASE OF MISCELLENEOUS ITEMS C CLASS AS PER ANNEXURE IV(MOIL/EMD/CH/ASDGM/2018-19/540) | 02-01-2019 | 11-01-2019 | 11-01-2019 | 12-01-2019 | 03:30 PM | Active | और देखें |
14. | Purchase of Miscellaneous Items C Class as per Annx III For emd plant.(MOIL/EMD/CH/ASDGM/2018-19/539) | 02-01-2019 | 11-01-2019 | 11-01-2019 | 12-01-2019 | 03:30 PM | Active | और देखें |
15. | Strength and heightning of Compound wall of MM bunglow at Balaghat Mine(BGT/CIVIL/18-19/18 DATE 31.12.2018) | 01-01-2019 | 09-01-2019 | 09-01-2019 | 09-01-2019 | 04:30 PM | Active | और देखें |
16. | Fixing of chain link fencing with concertina coil fencing at Balaghat mine.(BGT/CIVIL/18-19/17 DATE 31.12.2018) | 01-01-2019 | 09-01-2019 | 09-01-2019 | 09-01-2019 | 04:30 PM | Active | और देखें |
17. | Const of Guard room at Agent Bunglow premises Balaghat Mine(BGT/CIVIL/18-19/19 DATE 31.12.2018) | 01-01-2019 | 09-01-2019 | 09-01-2019 | 09-01-2019 | 04:30 PM | Active | और देखें |
18. | Underground Development work at Kandri Mine(MOIL/18-19/ET/386) | 01-01-2019 | 14-01-2019 | 14-01-2019 | 14-01-2019 | 03:30 PM | Active | और देखें |
19. | Underground concreting at 1750 Level at Ukwa Mine(MOIL/18-19/ET/378) | 01-01-2019 | 04-02-2019 | 04-02-2019 | 04-02-2019 | 03:30 PM | Active | और देखें |
20. | Pushing and unloading of ROM and rock tubs at surface at Chikla Mine(MOIL/18-19/ET/376) | 01-01-2019 | 01-02-2019 | 01-02-2019 | 01-02-2019 | 03:30 PM | Active | और देखें |
21. | Operation of vibrating screen to screen sub grade mineral reject of underground ROM at Balaghat Mine( MOIL/18-19/ET/380) | 01-01-2019 | 01-02-2019 | 01-02-2019 | 01-02-2019 | 03:30 PM | Active | और देखें |
22. | Removal of spillage material accumulated during hoisting of skip from 15th Level of production shaft at Balaghat Mine(MOIL/18-19/ET/379) | 01-01-2019 | 01-02-2019 | 01-02-2019 | 01-02-2019 | 03:30 PM | Active | और देखें |
23. | Additional excavation in Mangeniferous rock between Ch.33 to Ch.35 at 300 Level at Gumgaon Mine(MOIL/18-19/ET/374) | 31-12-2018 | 31-01-2019 | 31-01-2019 | 31-01-2019 | 03:30 PM | Active | और देखें |
24. | Picking and collection of 20 percent SM Grade ore CHL 535 from cleaning of sub-grade mineral reject from ROM at Magazine Dump West side section of Chikla Mine(MOIL/18-19/ET/375) | 31-12-2018 | 31-01-2019 | 31-01-2019 | 31-01-2019 | 03:30 PM | Active | और देखें |
25. | Transportation of sand from Kalaphata Ghat to Beldongri Mine(MOIL/18-19/ET/373) | 31-12-2018 | 11-02-2019 | 11-02-2019 | 11-02-2019 | 03:30 PM | Active | और देखें |
26. | WASHING OF BOTTOM EMD AT EMD PLANT DONGRI BUZURG MINE(MOIL/EMD/CH/SDGM/18-19/527) | 29-12-2018 | 08-01-2019 | 08-01-2019 | 09-01-2019 | 10:30 AM | Active | और देखें |
27. | Recovery of Reduced ore and EMD powder(MOIL/EMD/CH/SDGM/18-19/528) | 29-12-2018 | 08-01-2019 | 08-01-2019 | 09-01-2019 | 10:30 AM | Active | और देखें |
28. | Supply, Fabrication, Erection, Installation and Commissioning of belt Conveyor Charging System at Ferro Manganese Plant, Balaghat Mine.(MOIL/18-19/ET/364) | 27-12-2018 | 25-01-2019 | 25-01-2019 | 25-01-2019 | 03:30 PM | Active | और देखें |
29. | Removal of waste rock in the H W benches from Ch.39 to Ch.50 and handling the same by mechanized means at Dongri Buzurg Mine( MOIL/18-19/ET/369) | 27-12-2018 | 28-01-2019 | 28-01-2019 | 28-01-2019 | 03:30 PM | Active | और देखें |
30. | Construction of stone pitching and RCC Ramp for Diesel Pump at Munsar Mine( MUN/CIVIL/NIT/18-19/144 DT 25.12.2018) | 25-12-2018 | 05-01-2019 | 05-01-2019 | 05-01-2019 | 04:30 PM | Active | और देखें |
31. | Hiring of Excavator for cleaning of fines pond Niagara plant at Ukwa Mine( 16/Mining/UM/18-19/1991) | 24-12-2018 | 09-01-2019 | 09-01-2019 | 09-01-2019 | 04:30 PM | Active | और देखें |
32. | Drilling of Borehole with casing pipe at Ukwa camp Ukwa Mine(16/Civil/UM/18-19/1981 Date 23-12-2018) | 24-12-2018 | 09-01-2019 | 09-01-2019 | 09-01-2019 | 04:30 PM | Active | और देखें |
33. | Recovery of 1.5 mm Chilly grade ore from fines of mobile screening plant through trammel at Ukwa Mine(16/Mining/UM/18-19/1987) | 24-12-2018 | 09-01-2019 | 09-01-2019 | 09-01-2019 | 04:30 PM | Active | और देखें |
34. | Providing, Fabrication, Erection and Commissioning of 6 Nos Charging bins at Ferro Manganese Plant, Balaghat mine(MOIL/18-19/ET/355) | 24-12-2018 | 21-01-2019 | 21-01-2019 | 21-01-2019 | 03:30 PM | Active | और देखें |
35. | FABRICATION OF STEEL ORE PASSES FOR BALAGHAT MINE(AGENT/BGT/MECH/18-19/1244 dtd 21.12.2018) | 22-12-2018 | 04-01-2019 | 04-01-2019 | 04-01-2019 | 04:30 PM | Active | और देखें |
36. | Upgradation and renovation of 20 A type quarters at Munsar Mine(MOIL/18-19/ET/370) | 21-12-2018 | 21-01-2019 | 21-01-2019 | 21-01-2019 | 03:30 PM | Active | और देखें |
37. | A Construction of boundry wall at FMP B Construction of Re wall on hilly side of FMP, C) Construction of drain network at FMP at Balaghat Mine( MOIL/18-19/ET/360) | 21-12-2018 | 21-01-2019 | 21-01-2019 | 21-01-2019 | 03:30 PM | Active | और देखें |
38. | A New administrative building B Office for ferrow manganese plant C Vocational training center and D Gradute trainees hostel at Balaghat Mine(MOIL/18-19/ET/359) | 21-12-2018 | 28-02-2019 | 28-02-2019 | 28-02-2019 | 03:30 PM | Active | और देखें |
39. | Providing ,Supplying and erection of 11KV D.P. Structure Near 50-52 Substation Tirodi Mine.(TRD/ELE/18-19/7400002555/3088) | 20-12-2018 | 28-12-2018 | 28-12-2018 | 28-12-2018 | 03:30 PM | Active | और देखें |
40. | WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR FUEL DISPENSING AND CONSUMPTION MONITORING SYSTEM AT DONGRI BUZURG MINE.(PUR/MOIL/C-5/23/E-59/854-M Dt. 20/12/2018) | 20-12-2018 | 11-01-2019 | 11-01-2019 | 11-01-2019 | 03:30 PM | Active | और देखें |
41. | Repairing and Relining of MSRL Electrolytic Cell Tanks of EMD Plant, Dongri Buzurg Mine(MOIL/18-19/ET/354) | 20-12-2018 | 16-01-2019 | 16-01-2019 | 16-01-2019 | 03:30 PM | Active | और देखें |
42. | Purchase of HYDRATED LIME POWDER- 60 MT(WE-122 e-tender No.MOIL/18-19/ET-372, Dt.19.12.18) | 19-12-2018 | 16-01-2019 | 16-01-2019 | 17-01-2019 | 03:30 PM | Active | और देखें |
43. | PURCHASE OF GEAR MOTOR FOR TIPPLER AT MUNSAR MINE(ASDGM(Mines)/GrpIII/18-19/662) | 19-12-2018 | 02-01-2019 | 02-01-2019 | 02-01-2019 | 03:30 PM | Active | और देखें |
44. | PURCHASE OF ADOBE ACROBAT PRO LATEST VER(PUR/MOIL/C-4/138/E-60/860-M Dt. 19/12/2018) | 19-12-2018 | 07-01-2019 | 07-01-2019 | 07-01-2019 | 03:30 PM | Active | और देखें |
45. | Construction of drain in village Tighai Distt Nagpur under CSR(MOIL/18-19/ET/365) | 19-12-2018 | 18-01-2019 | 18-01-2019 | 18-01-2019 | 03:30 PM | Active | और देखें |
46. | Construction of cement concrete approch road and toilet block at Fetri under CSR(MOIL/18-19/ET/366) | 19-12-2018 | 18-01-2019 | 18-01-2019 | 18-01-2019 | 03:30 PM | Active | और देखें |
47. | Purchase of SULPHURIC ACID with Transportation-250 MT(WE-120 e-tender No.MOIL/18-19/ET-371, Dt.19.12.18) | 19-12-2018 | 09-01-2019 | 09-01-2019 | 10-01-2019 | 03:30 PM | Active | और देखें |
48. | Collection of fines from different areas at Kandri Mine(MOIL/18-19/ET/363) | 17-12-2018 | 17-01-2019 | 17-01-2019 | 17-01-2019 | 03:30 PM | Active | और देखें |
49. | Underground concreting work RCC for stope preparation at 70 Level, -30 Level and -230 Level at Munsar Mine(MOIL/18-19/ET/362) | 17-12-2018 | 17-01-2019 | 17-01-2019 | 17-01-2019 | 03:30 PM | Active | और देखें |
50. | Horizontal development at -70 Level of Chikla B incline section of Chikla Mine(MOIL/18-19/ET/361) | 17-12-2018 | 17-01-2019 | 17-01-2019 | 17-01-2019 | 03:30 PM | Active | और देखें |
51. | Extra excavation in Mangeniferous rock at pluse 160 Level of Chikla B section of Chikla Mine(MOIL/18-19/ET/368) | 17-12-2018 | 18-01-2019 | 18-01-2019 | 18-01-2019 | 03:30 PM | Active | और देखें |
52. | Loading AND transportation of Mill Tailing from Malajkhand mine of M s Hindustan Copper Limited to Ukwa Mine for stowing(MOIL/18-19/ET/367) | 17-12-2018 | 18-01-2019 | 18-01-2019 | 18-01-2019 | 03:30 PM | Active | और देखें |
53. | Cleaning of Spillage Material Under and Around all the Equipment at I.M.B Plant at Balaghat Mine( MOIL/18-19/ET/353) | 17-12-2018 | 16-01-2019 | 16-01-2019 | 16-01-2019 | 03:30 PM | Active | और देखें |
54. | Electrical heating system for electrolyte, in place of steam boiler heating system at new 500MT EMD Plant at Dongri Buzurg(MOIL/18-19/ET/352) | 15-12-2018 | 15-01-2019 | 15-01-2019 | 15-01-2019 | 03:30 PM | Active | और देखें |
55. | Excavation, Cutting and Dressing Works towards development of approach road near Second Vertical Shaft at Munsar Mine.( MUN/CIVIL/NIT/18-19/134 Date 11.12.2018) | 14-12-2018 | 17-12-2018 | 17-12-2018 | 17-12-2018 | 04:30 PM | Active | और देखें |
56. | PURCHASE OFGEARED MOTOR FOR 14.5 LEVEL CONVEYOR BELT AT BALAGHAT MINE(PUR/MOIL/BGT/18-19/1191 Dt. 10.12.2018) | 14-12-2018 | 26-12-2018 | 26-12-2018 | 26-12-2018 | 04:30 PM | Active | और देखें |
57. | Fabrication of steel ore-pass and manways for Underground Mines i.e Balaghat, Ukwa Chikla Beldongri Munsar Kandri and Gumgaon Mine( MOIL/18-19/ET/351) | 14-12-2018 | 14-01-2019 | 14-01-2019 | 14-01-2019 | 03:30 PM | Active | और देखें |
58. | PURCHASE OF STEEL WIRE ROPE - 12 MM (USHA MARTIN MAKE)(PUR/MOIL/C-3/23/E-40/588-M DT.13/12/2018) | 13-12-2018 | 17-01-2019 | 17-01-2019 | 17-01-2019 | 03:30 PM | Active | और देखें |
59. | PURCHASE OF CONTROL VALVE FOR CTH141F FOR SANDVIK MAKE JUMBO DRILL MACHINE PN-77793404 AT BALAGHAT MINE( PUR/MOIL/BGT/18-19/1190 dtd 10.12.2018) | 13-12-2018 | 07-01-2019 | 07-01-2019 | 07-01-2019 | 04:30 PM | Active | और देखें |
60. | Providing contractual manpower in IMB Plant for smooth operation of Plant at Dongri Buzurg Mine(MOIL/18-19/ET/356) | 11-12-2018 | 10-01-2019 | 10-01-2019 | 10-01-2019 | 03:30 PM | Active | और देखें |
61. | Making a Retaining Wall on entry of IMB Plant at Balaghat Mine(Civil/BGT/T.E./2018-19/5372) | 10-12-2018 | 19-12-2018 | 19-12-2018 | 19-12-2018 | 04:30 PM | Active | और देखें |
62. | Making of hume Pipe Culvert on Junction of Entry of Entry of IMB Plant at Balaghat Mine( Civil/BGT/T.E./2018-19/5386) | 10-12-2018 | 19-12-2018 | 19-12-2018 | 19-12-2018 | 04:30 PM | Active | और देखें |
63. | WEBSITE PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR HAMMER MILL( PUR/MOIL/C-11/23/E-54/836-M Dt. 10-12-2018) | 10-12-2018 | 02-01-2019 | 02-01-2019 | 02-01-2019 | 03:30 PM | Active | और देखें |
64. | Renewal of Environmental Clearance in respect of Three Sand Mining leases i.e. Rajna, Ramdongri (Gumgaon), Kalaphata (Kandri) and Pathri (Chikla) of MOIL Ltd.(MOIL/18-19/ET/349) | 07-12-2018 | 21-12-2018 | 21-12-2018 | 21-12-2018 | 03:30 PM | Active | और देखें |
65. | Hiring of 50 MT Capacity 2 Nos. Mobile Crane with 360 Degree revolving Telescopic Extended Boom for unloading and assembling of BH 60M Dumper 3 Nos. at Dongri Buzurg Mine(MOIL/18-19/ET/350) | 07-12-2018 | 21-12-2018 | 21-12-2018 | 21-12-2018 | 05:30 PM | Active | और देखें |
66. | Obtaining Environmental Clearance for Ferro Alloy Plant (Metallurgical Ferrous and Non Ferrous Industry) at Gumgaon Mine (Maharashtra)(MOIL/18-19/ET/357) | 07-12-2018 | 21-12-2018 | 21-12-2018 | 21-12-2018 | 03:30 PM | Active | और देखें |
67. | Construction of GSR for newly constructed A and C type Qtrs at Balaghat Mine(MOIL/18-19/ET/336) | 07-12-2018 | 07-01-2019 | 07-01-2019 | 07-01-2019 | 03:30 PM | Active | और देखें |
68. | Maintenance of garden at Various places at Dongri Buzurg Mine(MOIL/18-19/ET/337) | 07-12-2018 | 07-01-2019 | 07-01-2019 | 07-01-2019 | 03:30 PM | Active | और देखें |
69. | Maintenance and opration of water supply scheme at Dongri Buzurg Mine(MOIL/18-19/ET/338) | 07-12-2018 | 07-01-2019 | 07-01-2019 | 07-01-2019 | 03:30 PM | Active | और देखें |
70. | Cleaning of sanitary pipe line drain chambers and removal of garbage from MOIL Premises Nagpur(MOIL/18-19/ET/339) | 07-12-2018 | 07-01-2019 | 07-01-2019 | 07-01-2019 | 03:30 PM | Active | और देखें |
71. | Construction of Bituminous Tar road including widening of existing concrete road from village Mouli to kalaphata sand ghat tehsil Ramtek Distt Nagpur Under CSR(MOIL/18-19/ET/340) | 07-12-2018 | 07-01-2019 | 07-01-2019 | 07-01-2019 | 03:30 PM | Active | और देखें |
72. | Strengthening of Foundation of 132 kw in IMB Plant at Balaghat Mine(Civil/BGT/T.E./2018-19/5332) | 06-12-2018 | 14-12-2018 | 14-12-2018 | 14-12-2018 | 04:30 PM | Active | और देखें |
73. | Repairing of Roads from Arjun colony to Manegaon Mine Magazine and Agent Bungalaow to Service Magine at Balaghat Mine(Mining/BGT/T.E./18-19/5335) | 06-12-2018 | 14-12-2018 | 14-12-2018 | 14-12-2018 | 04:30 PM | Active | और देखें |
74. | Purchase of Main PLC Control Panel with HMI for Operation of IMB Plant, Balaghat Mine(M.P) - 1 Set (1 Lot) (Only Through e-procurement)(WE-121 DT.05/12/2018 (MOIL/18-19/ET/358)) | 05-12-2018 | 01-01-2019 | 01-01-2019 | 02-01-2019 | 03:30 PM | Active | और देखें |
75. | PURCHASE OF HIGH ENERGY EFFICIENT AXIAL FLOW FRP FAN BLADE - 2 SETS FOR NORTH AND SOUTH VENTILATION FAN AT BALAGHAT MINE(M.P) (AS PER ANNEXURE - A ENCLOSED)(PUR/MOIL/C-4/148/E-56/827-M DT.03/12/2018) | 03-12-2018 | 02-01-2019 | 02-01-2019 | 02-01-2019 | 03:30 PM | Active | और देखें |
76. | Purchase of Steel RAILS 50 LBS/YARD for Vertical Shaft( WE-107 DT.01.12.2018(e-TenderNo. MOIL/18-19/ET/348) | 01-12-2018 | 26-12-2018 | 26-12-2018 | 27-12-2018 | 03:30 PM | Active | और देखें |
77. | Purchase of Electrically Operated Air Cooled Screw Air Compressor with VFD, Capacity-1000 CFM - 2 Nos. (1 No.each for Gumgaon and Kandri Mine)(1 Lot.) (Only Through e-procurement)( WE-101 DT.30/11/2018 (MOIL/18-19/ET/347)) | 30-11-2018 | 14-01-2019 | 14-01-2019 | 15-01-2019 | 03:30 PM | Active | और देखें |
78. | Purchase of Pneumatically operated Double Diaphragm Pumps for Various Mines - 11 Nos.(2 Lots) (Only Through e-procurement)(WE-119 DT.30/11/2018 (MOIL/18-19/ET/346)) | 30-11-2018 | 31-12-2018 | 31-12-2018 | 01-01-2019 | 03:30 PM | Active | और देखें |
79. | Transportation of Coal to EMD Plant Dongri Buzurg Mine- 4800 MT(WE-114 e-tender No.MOIL/18-19/ET-345, Dt.29.11.18) | 29-11-2018 | 11-12-2018 | 11-12-2018 | 12-12-2018 | 03:30 PM | Active | और देखें |
80. | Providing internet connectivity at Kandri., Munsar, Beldongri, Gumgaon, Ukwa Mines and and Nagpur Office(MOIL/18-19/ET/318) | 29-11-2018 | 12-12-2018 | 12-12-2018 | 12-12-2018 | 03:30 PM | Active | और देखें |
81. | Transportation of Coal to EMD Plant Dongri Buzurg Mine- 4800 MT(WE-114 e-tender No.MOIL/18-19/ET-345, Dt.29.11.18) | 29-11-2018 | 11-12-2018 | 11-12-2018 | 12-12-2018 | 03:30 PM | Active | और देखें |
82. | Providing internet connectivity at Kandri., Munsar, Beldongri, Gumgaon, Ukwa Mines and and Nagpur Office(MOIL/18-19/ET/318) | 29-11-2018 | 12-12-2018 | 12-12-2018 | 12-12-2018 | 03:30 PM | Active | और देखें |
83. | Miscellaneous Contract Works to be carried out at Ferro Manganese Plant, Balaghat Mine(MOIL/18-19/ET/316) | 28-11-2018 | 28-12-2018 | 28-12-2018 | 28-12-2018 | 03:30 PM | Active | और देखें |
84. | Collection of canteen food items Collection of canteen food items and servicing it to mine employees at Chikla Mine through outside agency(MOIL/18-19/ET/335) | 28-11-2018 | 28-12-2018 | 28-12-2018 | 28-12-2018 | 03:30 PM | Active | और देखें |
85. | Collection of canteen food items and servicing it to mine employees at Tirodi Mine through outside agency(MOIL/18-19/ET/334) | 28-11-2018 | 28-12-2018 | 28-12-2018 | 28-12-2018 | 03:30 PM | Active | और देखें |
86. | Cleaning and sorting of ROM recovered from Pit No.6 at Sitapatore Mine(MOIL/18-19/ET/332) | 28-11-2018 | 28-12-2018 | 28-12-2018 | 28-12-2018 | 03:30 PM | Active | और देखें |
87. | Trench cutting in ore stacks at Kandri Mine(MOIL/18-19/ET/331) | 27-11-2018 | 27-12-2018 | 27-12-2018 | 27-12-2018 | 03:30 PM | Active | और देखें |
88. | Purchase of Sand for Sand Stowing Plant at Gumgaon Mine(MOIL/18-19/ET/329) | 27-11-2018 | 27-12-2018 | 27-12-2018 | 27-12-2018 | 03:30 PM | Active | और देखें |
89. | Purchase of Sand for Sand Stowing Plant at Kandri Munsar and Beldongri Mine(MOIL/18-19/ET/328) | 27-11-2018 | 27-12-2018 | 27-12-2018 | 27-12-2018 | 03:30 PM | Active | और देखें |
90. | Loading of Slag at Ferro Manganese Plant, Balaghat Mine( MOIL/18-19/ET/315) | 27-11-2018 | 26-12-2018 | 26-12-2018 | 26-12-2018 | 03:30 PM | Active | और देखें |
91. | Purchase of HIGH DENSITY POLY ETHYLENE-HDPE WOOVEN SACKS - 30150 NOS.(WE-108 e-tender No.MOIL/18-19/ET-344, Dt.27.11.18) | 27-11-2018 | 01-01-2019 | 01-01-2019 | 02-01-2019 | 03:30 PM | Active | और देखें |
92. | Extra excavation in Mangeniferous rock at 5th Level of vertical shaft section of Chikla Mine(MOIL/18-19/ET/330) | 26-11-2018 | 10-12-2018 | 10-12-2018 | 10-12-2018 | 03:30 PM | Active | और देखें |
93. | Extra excavation in Mangeniferous rock at 70 Level of Chikla B section of Chikla Mine(MOIL/18-19/ET/333) | 26-11-2018 | 10-12-2018 | 10-12-2018 | 10-12-2018 | 03:30 PM | Active | और देखें |
94. | PURCHASE OF MOTOR REDUCER (TRACK DRIVE GEAR BOX) (MAKE - SANDVIK ASIA PVT.LTD.) - 1 NO.FOR BALAGHAT MINE(M.P) (AS PER ANNEXURE - A ENCLOSED)(PUR/MOIL/C-4/240/E-55/794-M DT.26/11/2018) | 26-11-2018 | 21-12-2018 | 21-12-2018 | 21-12-2018 | 03:30 PM | Active | और देखें |
95. | REPAIRING OF AIR CONDITIONING UNIT OF HEAVY EARTH MOVING MACHINERIES AT DONGRI BUZURG MINE.(DB/MECH/EXC/18-19/482) | 26-11-2018 | 07-12-2018 | 07-12-2018 | 07-12-2018 | 04:30 PM | Active | और देखें |
96. | REPAIRING OF TRACK ROLLERS OF BEML DOZER BD155 NO.3 OF DONGRI BUZURG MINE.(DB/MECH/EXC/18-19/483) | 26-11-2018 | 07-12-2018 | 07-12-2018 | 07-12-2018 | 04:30 PM | Active | और देखें |
97. | REPAIRING OF BOOM CYLINDER OF TATAT HITACHI 450 HYDRAULIC EXCAVATOR OPERTING AT DONGRI BUZURG MINE.(DB/MECH/EXC/18-19/481) | 26-11-2018 | 07-12-2018 | 07-12-2018 | 07-12-2018 | 04:30 PM | Active | और देखें |
98. | Drilling of 57 mm dia holes apremining support for installing cabel bolt in Manginifferous rock in between ch 07 to 11 Level at Balaghat Mine( Mining/BGT/T.E./18-19/5214) | 26-11-2018 | 04-12-2018 | 04-12-2018 | 04-12-2018 | 04:30 PM | Active | और देखें |
99. | PURCHASE OF HDPE PIPES 140 MM FOR BALAGHAT MINE(PUR/MOIL/BGT/HDPE/18-19/1091 dtd 22/11/2018) | 23-11-2018 | 12-12-2018 | 12-12-2018 | 12-12-2018 | 04:30 PM | Active | और देखें |
100. | PURCHASE OF HDPE PIPES 140 MM FOR BALAGHAT MINE(PUR/MOIL/BGT/HDPE/18-19/1091 dtd 22/11/2018) | 23-11-2018 | 12-12-2018 | 12-12-2018 | 12-12-2018 | 04:30 PM | Active | और देखें |
निविदाएं अधिक जानकारी |
---|
Details of Purchase Order issued by MATERIALS DEPARTMENT valuing Rs.30.00 Lakhs & Above List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website) |
(2025) वर्ष के निविदाएं देखें |
(2024) वर्ष के निविदाएं देखें |
(2023) वर्ष के निविदाएं देखें |
(2022) वर्ष के निविदाएं देखें |
(2021) वर्ष के निविदाएं देखें |
(2020) वर्ष के निविदाएं देखें |
(2019) वर्ष के निविदाएं देखें |
(2018) वर्ष के निविदाएं देखें |
(2017) वर्ष के निविदाएं देखें |
(2016) वर्ष के निविदाएं देखें |
(2015) वर्ष के निविदाएं देखें |
(2014) वर्ष के निविदाएं देखें |
(2013) वर्ष के निविदाएं देखें |
(2012) वर्ष के निविदाएं देखें |
(205) वर्ष के निविदाएं देखें |
(24) वर्ष के निविदाएं देखें |
पूर्ण निविदा पुरालेख देखें |
सभी मॉयल निविदाएं देखें |