निविदाएं संग्रह
क्रमांक | शीर्षक | अंक प्रारंभ दिनांक | अंक अंतिम तिथी | प्रस्तुत करने की अंतिम तिथि | खुलने की तिथि | खुलने का समय | स्थिति | और देखें |
---|---|---|---|---|---|---|---|---|
1. | Strengthening of security for Railway Weigh Bridge at Balaghat Mine(MOIL/18-19/ET/459) | 12-03-2019 | 12-04-2019 | 12-04-2019 | 12-04-2019 | 03:00 PM | Active | और देखें |
2. | Transportation of underground tubs at Ch.10800 section of Ukwa Mine(MOIL/18-19/ET/458) | 12-03-2019 | 16-04-2019 | 16-04-2019 | 16-04-2019 | 03:00 PM | Active | और देखें |
3. | ADDITIONAL PILLAR OF RCC AT -270L OF CHIKLA MINE(TE-25 Dt.11032019) | 11-03-2019 | 19-03-2019 | 19-03-2019 | 19-03-2019 | 04:30 PM | Active | और देखें |
4. | Conveyor belts(PUR-MOIL-c-12-20-WE-148-ET-467 dt. 11/03/2019) | 11-03-2019 | 04-04-2019 | 04-04-2019 | 05-04-2019 | 03:30 PM | Active | और देखें |
5. | PURCHASE OF EXTENSION ROD FOR CTH141F FOR SANDVIK MAKE JUMBO DRILL MACHINE(PUR/MOIL/BGT /18-19/1763 dtd 07.03.2019) | 09-03-2019 | 01-04-2019 | 01-04-2019 | 01-04-2019 | 04:30 PM | Active | और देखें |
6. | Drilling of Small Dia Holes 1170 Nos. for production of manganese ore at Sitapatore Mine( SS/CIVIL/2018-19/608) | 08-03-2019 | 15-03-2019 | 15-03-2019 | 15-03-2019 | 03:30 PM | Active | और देखें |
7. | Drilling of 57 mm diameter holes a premining support for installation cabelbolt(Mining/BGT/T.E./18-19/31) | 08-03-2019 | 14-03-2019 | 14-03-2019 | 14-03-2019 | 04:30 PM | Active | और देखें |
8. | Repairing and servicing of Actuators of Butterfly Valve of I.M.B Plant at Balaghat Mine(AGT/BGT/MECH/IMB/18-19/1764 dtd 07.03.2019) | 08-03-2019 | 19-03-2019 | 19-03-2019 | 19-03-2019 | 04:30 PM | Active | और देखें |
9. | Underground concreting and extra excavation at -550 Level at Kandri Mine(MOIL/18-19/ET/453) | 08-03-2019 | 08-04-2019 | 08-04-2019 | 08-04-2019 | 03:30 PM | Active | और देखें |
10. | Supply of black gitti for underground concreting work at Munsar Mine(MOIL/18-19/ET/452) | 08-03-2019 | 08-04-2019 | 08-04-2019 | 08-04-2019 | 03:30 PM | Active | और देखें |
11. | Purchase of Atomic Absorption Spectrophotometer for E.M.D.Plant, Dongri Buzurg Mine(M.S) - 1 No.(1 Lot) (Only Through e-procurement)(WE-147 DT.08/03/2019 (ET/466)) | 08-03-2019 | 15-04-2019 | 15-04-2019 | 16-04-2019 | 03:30 PM | Active | और देखें |
12. | Repairing of 2 nos Track Chain of DI 500 -2 Drill Machine operating at Dongri Buzurg Mine.(DB/MECH/DRILL/18-19/640) | 07-03-2019 | 16-03-2019 | 16-03-2019 | 16-03-2019 | 04:30 PM | Active | और देखें |
13. | Construction of L.T.Panel Room at Beldongri Mine.(MOIL/18-19/ET/448) | 07-03-2019 | 05-04-2019 | 05-04-2019 | 05-04-2019 | 03:30 PM | Active | और देखें |
14. | Construction of gantry for sand dumping yard for under ground sand stowing at Chikla Mine.(MOIL/18-19/ET/449) | 07-03-2019 | 05-04-2019 | 05-04-2019 | 05-04-2019 | 03:30 PM | Active | और देखें |
15. | Maintenance of garden at Administrative building, MM bungalow, officers colony and rest House at Gumgaon Mine.(MOIL/18-19/ET/451) | 07-03-2019 | 05-04-2019 | 05-04-2019 | 05-04-2019 | 03:30 PM | Active | और देखें |
16. | Construction of Guest House at Munsar Mine(MOIL/18-19/ET/447) | 07-03-2019 | 08-04-2019 | 08-04-2019 | 08-04-2019 | 03:30 PM | Active | और देखें |
17. | Development of Garden around sewage treatment plant at Munsar Mine.(MUN/Civil/2018-19/179 Date 03.03.2019) | 06-03-2019 | 12-03-2019 | 12-03-2019 | 12-03-2019 | 04:30 PM | Active | और देखें |
18. | Repairing of doors and Windows of Camp Colony at Balaghat Mine(Civil/BGT/T.E./2018-19/30) | 05-03-2019 | 14-03-2019 | 14-03-2019 | 14-03-2019 | 04:30 PM | Active | और देखें |
19. | Recovery of EMD from low grade waste EMD material at EMD Plant Dongri Buzurg Mine(MOIL/EMD/CH/SDGM/18-19/637) | 05-03-2019 | 19-03-2019 | 19-03-2019 | 19-03-2019 | 10:30 AM | Active | और देखें |
20. | Purchse of Pre-Stressed Steel Wire Rope(WE-83 DT.05.03.2019(e-Tender no.MOIL/18-19/ET/464)) | 05-03-2019 | 04-04-2019 | 04-04-2019 | 05-04-2019 | 03:30 PM | Active | और देखें |
21. | FABRICATION OF STEEL OREPASS AT BALAGHAT MINE AS PER DRAWING(AGENT/BGT/MECH/18-19/1730 dtd 03.03.2019) | 04-03-2019 | 13-03-2019 | 13-03-2019 | 13-03-2019 | 04:30 PM | Active | और देखें |
22. | Water Proofing to Mine Office and Staff Qtr. at Sitapatore Mine.(trd/civil/2018-19/517) | 01-03-2019 | 09-03-2019 | 09-03-2019 | 09-03-2019 | 03:30 PM | Active | और देखें |
23. | Extension of Box Culvert in front of IMB Plant at Balaghat Mine(Civil/BGT/T.E./2018-19/29) | 01-03-2019 | 11-03-2019 | 11-03-2019 | 11-03-2019 | 04:30 PM | Active | और देखें |
24. | Purchase of Servers, Accessories and Supporting Software with AMC for 3 Years (9 Lots) (Only Through e-procuremen(WE-139 DT.01/03/2019 (ET/463)) | 01-03-2019 | 25-03-2019 | 25-03-2019 | 26-03-2019 | 03:30 PM | Active | और देखें |
25. | Providing, Supplying, Installation and Commissioning of Winder signal changeover system at 250 HP DC Winder of Gumgaon Mine(MOIL/18-19/ET/446) | 01-03-2019 | 01-04-2019 | 01-04-2019 | 01-04-2019 | 03:30 PM | Active | और देखें |
26. | TENDER FOR PROVIDING, SUPPLYING, FIXING AND INSTALLATION OF ESE TYPE LIGHTING ARRESTER FOR MINE MAGAZINE AT MUNSAR MINE(ELECT/MUN/ADGM/18-19/815) | 28-02-2019 | 08-03-2019 | 08-03-2019 | 08-03-2019 | 03:30 PM | Active | और देखें |
27. | Raising of Boundary wall with chain link fencing besides mine lease PWD road entry at Balaghat Mine(BGT/CIVIL/18-19/28 DATE 27.02.2019) | 28-02-2019 | 11-03-2019 | 11-03-2019 | 11-03-2019 | 04:30 PM | Active | और देखें |
28. | Cleaning of ROM at Beldongri Mine(MOIL/18-19/ET/460) | 27-02-2019 | 13-03-2019 | 13-03-2019 | 13-03-2019 | 03:30 PM | Active | और देखें |
29. | Hiring of JCB, Road Roller and providing and fixing of RCC Pillars for demarcation of Parsoda Lease of Munsar Mine.(MUN/Civil/2018-19/174 Date 26.02.2019) | 26-02-2019 | 05-03-2019 | 05-03-2019 | 05-03-2019 | 04:30 PM | Active | और देखें |
30. | PROVIDNG, SUPPLYING, FIXING, INSTALLATION AND REPLACEMNT OF 3C X 240SQMM PVCDWA, COPPER CONDUCTOR CABLE CLAMP OF 167HP PUMPS IN VERTICAL SHAFT AT MUNSAR MINE(ELECT/MUN/ADGM/18-19/802) | 26-02-2019 | 06-03-2019 | 06-03-2019 | 06-03-2019 | 03:30 PM | Active | और देखें |
31. | Repairing of Fire Detection and Suppression System of BEML dumpers BH35 and BE700 Hydraulic Excavator of Dongri Buzurg Mine( MOIL/18-19/ET/445) | 26-02-2019 | 26-03-2019 | 26-03-2019 | 26-03-2019 | 03:30 PM | Active | और देखें |
32. | EXTENSION OF 11KV OVERHEAD LINE FEEDING POWER SUPPLY TO 2ND VERTICAL SHAFT TEMPORARY SUBSTATION AT MUNSAR MINE(ELECT/MUN/18-19/801) | 25-02-2019 | 05-03-2019 | 05-03-2019 | 05-03-2019 | 03:30 PM | Active | और देखें |
33. | Hiring of Wheel Load for Sand stowing pants of Balaghat Mine(Mining/BGT/T.E./18-19/27) | 25-02-2019 | 05-03-2019 | 05-03-2019 | 05-03-2019 | 04:30 PM | Active | और देखें |
34. | WEBSITE TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR K.G.KHOSLA AND KIRLOSKAR MAKE COMPRESSOR( PUR/MOIL/C-5/40/E-67/1035-M Dt. 25-02-2019) | 25-02-2019 | 18-03-2019 | 18-03-2019 | 18-03-2019 | 03:30 PM | Active | और देखें |
35. | Const of Front side Boundary wall Mine Manager Bungalow at Balaghat Mine(Civil/BGT/T.E./18-19/26) | 20-02-2019 | 27-02-2019 | 27-02-2019 | 27-02-2019 | 04:30 PM | Active | और देखें |
36. | WEBSITE TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF POLYPROPYLENE BALL AND DIAPHRAGM VALVES(PUR/MOIL/C-11/15/E-70/1101-M Dt. 20-02-2019) | 20-02-2019 | 15-03-2019 | 15-03-2019 | 15-03-2019 | 03:30 PM | Active | और देखें |
37. | WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR ATLAS COPCO MAKE COMPRESSOR(PUR/MOIL/C-5/40/E-69/1069-M Dt. 20/02/2019) | 20-02-2019 | 15-03-2019 | 15-03-2019 | 15-03-2019 | 03:30 PM | Active | और देखें |
38. | WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR INDUS ROCK TOOL MAKE DRILL MACHINE IRB-300(PUR/MOIL/C-5/77/E-65/994-MDt. 19/02/2019) | 19-02-2019 | 13-03-2019 | 13-03-2019 | 13-03-2019 | 03:30 PM | Active | और देखें |
39. | WEBSITE PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF TECHNO FILTERS MAKE RECESS PLATES FOR FILTER PRESS(PUR/MOIL/C-11/17/E-68/1041-M Dt. 19-02-2019) | 19-02-2019 | 25-03-2019 | 25-03-2019 | 25-03-2019 | 03:30 PM | Active | और देखें |
40. | Collection of Garbage and cleaning of drains at Balaghat Mine(Civil/BGT/T.E./2018-19/25) | 18-02-2019 | 26-02-2019 | 26-02-2019 | 26-02-2019 | 04:30 PM | Active | और देखें |
41. | Purchase of Tyre Handler for Dongri Buzurg Mine(M.S) - 1 No.(1 Lot.) (Only Through e-procurement)(WE-131 DT.16/02/2019 (ET/444)) | 16-02-2019 | 11-03-2019 | 11-03-2019 | 12-03-2019 | 03:30 PM | Active | और देखें |
42. | TENDER FOR PROVIDING, SUPPLYING, FIXING AND INSTALLATION OF ESE TYPE LIGHTING ARRESTER FOR MINE MAGAZINE AT MUNSAR MINE(Elect/MUN/ADGM/18-19/789) | 14-02-2019 | 25-02-2019 | 25-02-2019 | 25-02-2019 | 03:30 PM | Active | और देखें |
43. | Purchase of CEMENT- 688 MT(WE-142 e-tender No.MOIL/18-19/ET-442, Dt.14.02.19) | 14-02-2019 | 13-03-2019 | 13-03-2019 | 14-03-2019 | 03:30 PM | Active | और देखें |
44. | Purchase of POLYPROPYLENE JUMBO BAG CARRYING CAPACITY 1.0 MT - 13650 Nos.(WE-141 e-tender No.MOIL/18-19/ET-443, Dt.14.02.19) | 14-02-2019 | 13-03-2019 | 13-03-2019 | 14-03-2019 | 03:30 PM | Active | और देखें |
45. | Sky water Generating System. (Ready to use condition)(Capacity -380 Liter or more in 24 Hrs)( DB/PUR/18-19/608) | 14-02-2019 | 26-03-2019 | 26-03-2019 | 26-03-2019 | 04:30 PM | Active | और देखें |
46. | Removal of Spillage material accumulated during hoisting of skip from 15 level of production shaft at Balaghat Mine(MIN/BGT/18-19/6629 date 11.02.2019) | 12-02-2019 | 18-02-2019 | 18-02-2019 | 18-02-2019 | 04:30 PM | Active | और देखें |
47. | Annual Operation and Maintenance contract of Excavator 1 No. and Dumpers 4 Nos. at Dongri Buzurg Mine for the period of two years(MOIL/18-19/ET/433) | 12-02-2019 | 12-03-2019 | 12-03-2019 | 12-03-2019 | 03:30 PM | Active | और देखें |
48. | Picking and collection of material to recover Ferro Grade KD 2272 ore from subgrade mineral reject at Kandri Mine( MOIL/18-19/ET/438) | 12-02-2019 | 12-03-2019 | 12-03-2019 | 12-03-2019 | 03:30 PM | Active | और देखें |
49. | Sinking of winzes at various level at Munsar Mine(MOIL/18-19/ET/436) | 12-02-2019 | 12-03-2019 | 12-03-2019 | 12-03-2019 | 03:30 PM | Active | और देखें |
50. | Picking and collection of SM Grade SPL 463 SPL 481 and Fines from subgrade mineral reject at Sitapatore Mine(MOIL/18-19/ET/437) | 12-02-2019 | 12-03-2019 | 12-03-2019 | 12-03-2019 | 03:30 PM | Active | और देखें |
51. | Operation of dump screen to recover BGL-523 at Balaghat Mine(Mining/BGT/18-19/ Date 08.02.2019) | 11-02-2019 | 14-02-2019 | 14-02-2019 | 14-02-2019 | 04:30 PM | Active | और देखें |
52. | Construction of Stone Pitching Retaining Wall in continuation to the Stone Pitching Wall beside Mobile Crusher Unit, Munsar Mine.(MUN/Civil/T.E/2018-19/165 Date 10.02.2019) | 11-02-2019 | 16-02-2019 | 16-02-2019 | 16-02-2019 | 04:30 PM | Active | और देखें |
53. | Removal of waste rock and Manganiferous rock in F W benches from Ch.14 to Ch.20 and removal of waste rock in H W benches from Ch.08 to Ch.14 and handling the same by mechanized means at Dongri Buzurg Mine(MOIL/18-19/ET/434) | 11-02-2019 | 11-03-2019 | 11-03-2019 | 11-03-2019 | 03:30 PM | Active | और देखें |
54. | Removal of waste rock and Manganiferous rock and handling the same by mechanized means from Pit No.6 at Sitapatore Mine(MOIL/18-19/ET/435) | 11-02-2019 | 11-03-2019 | 11-03-2019 | 11-03-2019 | 03:30 PM | Active | और देखें |
55. | Purchase of 60mtrs LED Strip Light for Chikla Mine(TE-15 DT.09022019) | 09-02-2019 | 18-02-2019 | 18-02-2019 | 18-02-2019 | 04:30 PM | Active | और देखें |
56. | Fabrication of Steel Manways for Balaghat Mine (as per detail mentioned in Price Bid-II)(AGENT/BGT/MECH/18-19/1591 dtd 08.02.2019) | 09-02-2019 | 15-02-2019 | 15-02-2019 | 15-02-2019 | 04:30 PM | Active | और देखें |
57. | Fabrication of Steel Manways for Balaghat Mine (as per detail mentioned in Price Bid-II)(AGENT/BGT/MECH/18-19/1591 dtd 08.02.2019) | 09-02-2019 | 15-02-2019 | 15-02-2019 | 15-02-2019 | 04:30 PM | Active | और देखें |
58. | Drilling of Borehole for Sand Stowing at Munsar Mine( Civil/MUN/2018-19/166 Date 04.02.2019) | 08-02-2019 | 12-02-2019 | 12-02-2019 | 12-02-2019 | 04:30 PM | Active | और देखें |
59. | Erection of new LT Overhead line from substation to rest house at Kandri Mine(MOIL/18-19/ET/432) | 08-02-2019 | 08-03-2019 | 08-03-2019 | 08-03-2019 | 03:30 PM | Active | और देखें |
60. | Maintenance and Up Keeping of Effluent Treatment Plant ETP at EMD Plant Dongri Buzurg Mine(MOIL/EMD/CH/ADGM/2018-19/599) | 07-02-2019 | 19-02-2019 | 19-02-2019 | 19-02-2019 | 04:30 PM | Active | और देखें |
61. | SAFETY GOGGLES-2 ITEMS(PUR-MOIL-C-1-190-WE-136-ET-439 dt.07/02/2019) | 07-02-2019 | 26-02-2019 | 26-02-2019 | 27-02-2019 | 03:30 PM | Active | और देखें |
62. | Purchase of Grid Connected Roof Top Solar Power System - 3 Nos (3 Lots) (Only Through e-procurement)(WE-138 DT.07/02/2019 (ET/440)) | 07-02-2019 | 05-03-2019 | 05-03-2019 | 06-03-2019 | 03:30 PM | Active | और देखें |
63. | Purchase of LED Flood Lights for High Mast Towers - 492 Nos. (2 Lots) (Only Through e-procurement)(WE-140 Dt.07/02/2019 (ET/441)) | 07-02-2019 | 05-03-2019 | 05-03-2019 | 06-03-2019 | 03:30 PM | Active | और देखें |
64. | Extension of Stone pitching parafit wall around mine dump in between mine lease and purchase land at Balaghat Mine( CIVIL/BGT/T.E./2018-19/6417 DATE 21.01.2019) | 06-02-2019 | 12-02-2019 | 12-02-2019 | 12-02-2019 | 04:30 PM | Active | और देखें |
65. | WEB SITE TENDER ENQUIRYINTWO BIDSYSTEM FOR PURCHASE OF SET OF WORM WHEEL and SHAFT FOR GEAR BOX OF CONVEYOR BELT BC 2 OF CandS PLANT OF GUMGAON MINE 1 SET AS PER ANNEXURE A ENCLOSED(A-III/MUN/GUM/18-19/770 Date 05/02/2019) | 06-02-2019 | 09-02-2019 | 09-02-2019 | 09-02-2019 | 04;00 PM | Active | और देखें |
66. | Comprehensive Annual Maintenance Contract (CAMC) of computer hardware and peripherals(Agent an Sr DGM Group-III Mines/SYS/2018-19/765) | 06-02-2019 | 16-02-2019 | 16-02-2019 | 16-02-2019 | 04:30 PM | Active | और देखें |
67. | Railing and Transportation of ore at Kandri Mine(MOIL/18-19/ET/425) | 05-02-2019 | 05-03-2019 | 05-03-2019 | 05-03-2019 | 03:30 PM | Active | और देखें |
68. | Railing and Transportation of ore at Munsar Mine(MOIL/18-19/ET/426) | 05-02-2019 | 05-03-2019 | 05-03-2019 | 05-03-2019 | 03:30 PM | Active | और देखें |
69. | WEBSITE TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF STAINLESS STEEL BALL VALVES(PUR/MOIL/C-11/14/E-57/842-M Dt. 05-02-2019) | 05-02-2019 | 20-03-2019 | 20-03-2019 | 20-03-2019 | 03:30 PM | Active | और देखें |
70. | WEBSITE TENDER ENQUIRY IN SINGLE BID SYSTEM FOR PURCHASE OF MS-CI - NRV, GATE VALVES AND BUTTERFLY VALVES(PUR/MOIL/C-11/148/E-58/843-M Dt. 05-02-2019) | 05-02-2019 | 20-03-2019 | 20-03-2019 | 20-03-2019 | 03:30 PM | Active | और देखें |
71. | SUPPLY, INSTALLATION COMMISSIONING OF OFC WIRED Armoured LAN CONNECTIVITY TO FERRO MANGANESE PLANT, AGENT OFFICE, FROM ADMIN BUILDING AT BALAGHAT MINE(BG/SYSTEM/NETWORK/2018-19/1535) | 04-02-2019 | 12-02-2019 | 12-02-2019 | 12-02-2019 | 04;00 PM | Active | और देखें |
72. | Purchase of Single Axis Joystick of Gessmann for Balaghat Mine(BGT/ELECT/TE/18-19/1517) | 04-02-2019 | 11-03-2019 | 11-03-2019 | 11-03-2019 | 04;00 PM | Active | और देखें |
73. | PURCHASE OF CUMMINS DIESEL ENGINE - 1 NO. SUITABLE FOR BEML MAKE BH35-2 DUMPER OPERATING AT DONGRI BUZURG MINE(M.S) (AS PER ANNEXURE - A ENCLOSED).(PUR/MOIL/C-4/139/E-66/1006-M Dt.01/02/2019) | 01-02-2019 | 22-02-2019 | 22-02-2019 | 22-02-2019 | 03:30 PM | Active | और देखें |
74. | Railing and Transportation of ore at Beldongri Mine(MOIL/18-19/ET/428) | 01-02-2019 | 01-03-2019 | 01-03-2019 | 01-03-2019 | 03:30 PM | Active | और देखें |
75. | Railing and Transportation of ore at Tirodi Mine(MOIL/18-19/ET/424) | 01-02-2019 | 01-03-2019 | 01-03-2019 | 01-03-2019 | 03:30 PM | Active | और देखें |
76. | Railing and Transportation of ore at Sitapatore Mine(MOIL/18-19/ET/429) | 01-02-2019 | 01-03-2019 | 01-03-2019 | 01-03-2019 | 03:00 PM | Active | और देखें |
77. | Railing and Transportation of ore at Gumgaon Mine(MOIL/18-19/ET/427) | 01-02-2019 | 01-03-2019 | 01-03-2019 | 01-03-2019 | 03:30 PM | Active | और देखें |
78. | Construction of shed for 1500 KVA DG set for Khosla Compressor at Chikla Mine(MOIL/18-19/ET/409) | 31-01-2019 | 08-03-2019 | 08-03-2019 | 08-03-2019 | 03:30 PM | Active | और देखें |
79. | Construction of 3.3 KV Substation building, Panel room near crushing plant and store room near main vertical shaft at Chikla Mine.(MOIL/18-19/ET/410) | 31-01-2019 | 08-03-2019 | 08-03-2019 | 08-03-2019 | 03:30 PM | Active | और देखें |
80. | WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR GODREJ SULLAIR MAKE COMPRESSOR(PUR/MOIL/C-5/34/E-61/943-M Dt. 31/01/2019) | 31-01-2019 | 22-02-2019 | 22-02-2019 | 22-02-2019 | 03:30 PM | Active | और देखें |
81. | Interior and exterior renovation works for Mine Managers Bungalow at Munsar Mine(MOIL/18-19/ET/413) | 31-01-2019 | 01-03-2019 | 01-03-2019 | 01-03-2019 | 03:30 PM | Active | और देखें |
82. | Construction of ventilation fan evassi with substation building at Gadhaghat, Chikla Mine.( MOIL/18-19/ET/408) | 31-01-2019 | 01-03-2019 | 01-03-2019 | 01-03-2019 | 03:30 PM | Active | और देखें |
83. | Maintenance and operation of water supply pumps for drinking water supply in camp quarters, officers colony, Adm building, Industrial buildings etc at Gumgaon Mine.(MOIL/18-19/ET/412) | 31-01-2019 | 01-03-2019 | 01-03-2019 | 01-03-2019 | 03:30 PM | Active | और देखें |
84. | Annual repairs to camp quarters, Officers quarters at Gumgaon Mine.(MOIL/18-19/ET/414) | 31-01-2019 | 01-03-2019 | 01-03-2019 | 01-03-2019 | 03:30 PM | Active | और देखें |
85. | Construction of Residences for Directors and Sr. Executives at West court compound of MOIL LTD at Nagpur(MOIL/18-19/ET/411) | 31-01-2019 | 01-03-2019 | 01-03-2019 | 01-03-2019 | 03:30 PM | Active | और देखें |
86. | Purchase of ERW PIPE-3 items(WE-134 e-tender No.MOIL/18-19/ET-431, Dt.30.01.19) | 30-01-2019 | 26-02-2019 | 26-02-2019 | 27-02-2019 | 03:30 PM | Active | और देखें |
87. | Purchase of M.S.LANCING PIPE - 24 MT(WE-137 e-tender No.MOIL/18-19/ET-430, Dt.30.01.19) | 30-01-2019 | 11-03-2019 | 11-03-2019 | 12-03-2019 | 03:30 PM | Active | और देखें |
88. | Railing and Transportation of ore at Balaghat Mine(MOIL/18-19/ET/421) | 29-01-2019 | 28-02-2019 | 28-02-2019 | 28-02-2019 | 03:30 PM | Active | और देखें |
89. | Railing and Transportation of ore at Dongri Buzurg Mine(MOIL/18-19/ET/422) | 29-01-2019 | 28-02-2019 | 28-02-2019 | 28-02-2019 | 03:30 PM | Active | और देखें |
90. | Railing and Transportation of ore at Chikla Mine(MOIL/18-19/ET/423) | 29-01-2019 | 28-02-2019 | 28-02-2019 | 28-02-2019 | 03:30 PM | Active | और देखें |
91. | Underground Horizontal development at 370 Level and 470 Level from 2nd Vertical section at Chikla Mine(MOIL/18-19/ET/417) | 25-01-2019 | 25-02-2019 | 25-02-2019 | 25-02-2019 | 03:30 PM | Active | और देखें |
92. | Obtaining Environment Clearance of mining lease below 5 Hectare of Sitapatore, Bharweli and Tirodi Mine(MOIL/18-19/ET/402) | 25-01-2019 | 25-02-2019 | 25-02-2019 | 25-02-2019 | 03:30 PM | Active | और देखें |
93. | Underground Horizontal and Vertical development at 470 Level of Chikla Vertical section at Chikla Mine(MOIL/18-19/ET/403) | 25-01-2019 | 25-02-2019 | 25-02-2019 | 25-02-2019 | 03:30 PM | Active | और देखें |
94. | PURCHASE OF LABORATORY CHEMICALS(PUR/MOIL/C-3/43/E-64/1969-M Dt. 23/01/2019) | 23-01-2019 | 13-02-2019 | 13-02-2019 | 13-02-2019 | 03:30 PM | Active | और देखें |
95. | Security guard for diamond drilling site at Chikla Mine( MOIL/18-19/ET/405) | 22-01-2019 | 21-02-2019 | 21-02-2019 | 21-02-2019 | 03:30 PM | Active | और देखें |
96. | Picking and collection of 3rd grade and LGHS ore from diluted ROM at South Pit North side at Tirodi Mine(MOIL/18-19/ET/404) | 22-01-2019 | 21-02-2019 | 21-02-2019 | 21-02-2019 | 03:30 PM | Active | और देखें |
97. | Ore tolley breaking work at CH22 Ukwa Mine(16/Mining/UM/18-19/2229) | 22-01-2019 | 05-02-2019 | 05-02-2019 | 05-02-2019 | 04:30 PM | Active | और देखें |
98. | Underground transportation of tubs at 1750Level Vertical shaft Ukwa Mine( 16/Mining/UM/18-19/2232) | 22-01-2019 | 05-02-2019 | 05-02-2019 | 05-02-2019 | 04:30 PM | Active | और देखें |
99. | Underground transportation of tubs at 1850Level Vertical shaft Ukwa Mine(16/Mining/UM/18-19/2235) | 22-01-2019 | 05-02-2019 | 05-02-2019 | 05-02-2019 | 04:30 PM | Active | और देखें |
100. | Purchase of Oil and Lubricants - 28 Items (Only Through e-procurement)(WE-117 DT.22/01/2019 (ET-419 AND ET-420)) | 22-01-2019 | 12-02-2019 | 12-02-2019 | 13-02-2019 | 03:30 PM | Active | और देखें |
निविदाएं अधिक जानकारी |
---|
Details of Purchase Order issued by MATERIALS DEPARTMENT valuing Rs.30.00 Lakhs & Above
Details of Purchase Order issued by MATERIALS DEPARTMENT valuing Rs.5.00 Lakhs & Above List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website) |
(2025) वर्ष के निविदाएं देखें |
(2024) वर्ष के निविदाएं देखें |
(2023) वर्ष के निविदाएं देखें |
(2022) वर्ष के निविदाएं देखें |
(2021) वर्ष के निविदाएं देखें |
(2020) वर्ष के निविदाएं देखें |
(2019) वर्ष के निविदाएं देखें |
(2018) वर्ष के निविदाएं देखें |
(2017) वर्ष के निविदाएं देखें |
(2016) वर्ष के निविदाएं देखें |
(2015) वर्ष के निविदाएं देखें |
(2014) वर्ष के निविदाएं देखें |
(2013) वर्ष के निविदाएं देखें |
(2012) वर्ष के निविदाएं देखें |
(205) वर्ष के निविदाएं देखें |
(24) वर्ष के निविदाएं देखें |
पूर्ण निविदा पुरालेख देखें |
सभी मॉयल निविदाएं देखें |