1. | UNDERGROUND CONCRETING WORK AT BALAGHAT MINE(MOIL/18-19/ET/124) | 22-06-2018 | 23-07-2018 | 23-07-2018 | 23-07-2018 | 03:30 PM | Active | View |
2. | G.I.Wire Netting and S S Screen Cloth -7 items(PUR-MOIL-C-1-203-WE-48-ET-140) | 21-06-2018 | 16-07-2018 | 16-07-2018 | 17-07-2018 | 03:30 PM | Active | View |
3. | PROVIDING, SUPPLYING, FIXING AND INSTALLATION OF ESE TYPE LIGHTING ARRESTER FOR RAILWAY AND ROAD WEIGH BRIDGE AT MUNSAR MINE(Elect/MUN/ADGM/18-19/215) | 20-06-2018 | 30-06-2018 | 30-06-2018 | 30-06-2018 | 03:30 PM | Active | View |
4. | Repairing MS Tanks and FRVE Lining on MS Neutralization tanks and Hoppers at EMD PLANT DB MINE(MOIL/EMD/CH/ADGM/2018-19/168) | 20-06-2018 | 29-06-2018 | 29-06-2018 | 30-06-2018 | 04:30 PM | Active | View |
5. | WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR SANDVIK ASIA PVT. LTD MAKE, JUMBO DRILLING MACHINE OPERATING AT BALAGHAT MINE.(PUR/MOIL/C-5/23/E-12/218-M Dt. 20/06/2018) | 20-06-2018 | 11-07-2018 | 11-07-2018 | 11-07-2018 | 03:30 PM | Active | View |
6. | HDPE Pipes,Bends,Ends(PUR-MOIL-C-1-190-WE-41-ET-139 dt.20.06.2018) | 20-06-2018 | 12-07-2018 | 12-07-2018 | 13-07-2018 | 03:30 PM | Active | View |
7. | FABRICATION OF CONDENSATE STORAGE TANK AT EMD PLANT D.B. MINE.(MOIL/EMD/CH/ADGM/2018-19/169) | 20-06-2018 | 07-07-2018 | 07-07-2018 | 10-07-2018 | 04:30 PM | Active | View |
8. | Picking and collection of material from South side of A waste dump at Tirodi Mine(MOIL/18-19/ET/120) | 20-06-2018 | 20-07-2018 | 20-07-2018 | 20-07-2018 | 03:30 PM | Active | View |
9. | Picking and collection of material from Sidha Baba Mandir at Tirodi Mine(MOIL/18-19/ET/119) | 20-06-2018 | 20-07-2018 | 20-07-2018 | 20-07-2018 | 03:30 PM | Active | View |
10. | Picking and collection of material from South A waste dump at Tirodi Mine(MOIL/18-19/ET/118) | 20-06-2018 | 20-07-2018 | 20-07-2018 | 20-07-2018 | 03:30 PM | Active | View |
11. | Washing Picking and collection of material from East side of A dump at Tirodi Mine(MOIL/18-19/ET/117) | 20-06-2018 | 20-07-2018 | 20-07-2018 | 20-07-2018 | 03:30 PM | Active | View |
12. | Purchase of Copper Hangers - 1400 Nos.(WE-46 DT.19.06.2018(e-Tender no.MOIL/18-19/ET/138)) | 19-06-2018 | 28-06-2018 | 28-06-2018 | 29-06-2018 | 03:30 PM | Active | View |
13. | Hiring of Hydraulic Rock Breaker with hydraulic excavator at Dongri Buzurg Mine(MOIL/18-19/ET/105) | 19-06-2018 | 02-07-2018 | 02-07-2018 | 02-07-2018 | 03:30 PM | Active | View |
14. | Butterfly valves-3 items(PUR-MOIL-C-1-202-WE-47-ET-137 dt.19.06.2018) | 19-06-2018 | 10-07-2018 | 10-07-2018 | 11-07-2018 | 03:30 PM | Active | View |
15. | Security for Mine Hospital at Balaghat Mine( MOIL/18-19/ET/97) | 19-06-2018 | 12-07-2018 | 12-07-2018 | 12-07-2018 | 03:30 PM | Active | View |
16. | Outsourcing of Industrial Pumping Operation in Underground Mine at Gumgaon Mine(MOIL/18-19/ET/98) | 19-06-2018 | 17-07-2018 | 17-07-2018 | 17-07-2018 | 03:30 PM | Active | View |
17. | Picking and collection of UKL 448 25 percent from F W dumps from Ch 3500 to Ch 4300 at Ukwa Mine(MOIL/18-19/ET/116) | 19-06-2018 | 19-07-2018 | 19-07-2018 | 19-07-2018 | 03:30 PM | Active | View |
18. | Picking and collection of material DBL 56 DBL 457 from surplus contaminated low grade ROM at Dongri Buzurg Mine(MOIL/18-19/ET/113) | 19-06-2018 | 19-07-2018 | 19-07-2018 | 19-07-2018 | 03:30 PM | Active | View |
19. | Picking and collection of Ferro Grade TD 4505 and SM Grade TDL 439 AND TDL 499 from North Magazine dump at Tirodi Mine(MOIL/18-19/ET/114) | 19-06-2018 | 19-07-2018 | 19-07-2018 | 19-07-2018 | 03:30 PM | Active | View |
20. | Picking and collection of SM Grade and Ferro Grade ore from North dump at Tirodi Mine(MOIL/18-19/ET/115) | 19-06-2018 | 19-07-2018 | 19-07-2018 | 19-07-2018 | 03:25 PM | Active | View |
21. | Purchase of Tilting Tubs for Various Mines - 290 Nos. (24 CFT Tilting Tubs - 275 Nos. and 16 CFT Tilting Tubs - 15 Nos.) (3 Lots) (Only Through e-procurement)(WE-39 DT.18.06.2018 (MOIL/18-19/ET/134)) | 18-06-2018 | 12-07-2018 | 12-07-2018 | 13-07-2018 | 03:30 PM | Active | View |
22. | Purchase of Pneumatic Rock Drill Machines and Pusher Leg for Various Mines - 64 Nos. Each (4 Lots) (Only Through e-procurement)(WE-37 DT.18.06.2018 (MOIL/18-19/ET/136)) | 18-06-2018 | 11-07-2018 | 11-07-2018 | 12-07-2018 | 03:30 PM | Active | View |
23. | G.I.Pipes of assorted sizes(PUR-MOIL-C-1-197-WE-16-ET-133 dt 18-6-2018) | 18-06-2018 | 16-07-2018 | 16-07-2018 | 17-07-2018 | 03:30 PM | Active | View |
24. | Purchase of Battery Locomotives, Capacity 3 and 4 Ton (3 Ton Cap. - 2 Nos. and 4 Ton Cap. - 4 Nos.) for Various Mines (3 Lots) (Only Through e-procurement)( WE-40 DT.18.06.2018 (MOIL/18-19/ET/135)) | 18-06-2018 | 16-07-2018 | 16-07-2018 | 17-07-2018 | 03:30 PM | Active | View |
25. | Picking and collection of 3rd Grade and LGHS ore from diluted ROM at South pit North side of Tirodi Mine(MOIL/18-19/ET/110) | 18-06-2018 | 18-07-2018 | 18-07-2018 | 18-07-2018 | 03:30 PM | Active | View |
26. | Picking and collection of material DBL 456 AND DBL 457 from surplus contaminated low grade ROM at Dongri Buzurg Mine( MOIL/18-19/ET/112) | 18-06-2018 | 18-07-2018 | 18-07-2018 | 18-07-2018 | 03:30 PM | Active | View |
27. | Picking and collection of Ferro Grade TD-4505 and SM Grade TDL 439 AND TDL 499 from South of Magazine dump at Tirodi Mine(MOIL/18-19/ET/111) | 18-06-2018 | 18-07-2018 | 18-07-2018 | 18-07-2018 | 03:30 PM | Active | View |
28. | Cleaning of surplus underground ROM at Munsar Mine(MOIL/18-19/ET/109) | 18-06-2018 | 18-07-2018 | 18-07-2018 | 18-07-2018 | 03:30 PM | Active | View |
29. | ADDITIONAL PILLAR OF RCC AT CHIKLA B SECTION OF CHIKLA MINE(TE-06 Dt.16062018) | 16-06-2018 | 23-06-2018 | 23-06-2018 | 23-06-2018 | 04:30 PM | Active | View |
30. | DRILLING OF SMALL DIA. HOLE TO RECOVER SM GRADE ORE AT CHIKLA MINE(TE-07 Dt.16062018) | 16-06-2018 | 23-06-2018 | 23-06-2018 | 23-06-2018 | 04:30 PM | Active | View |
31. | PURCHASE OF Sensor Assembly for 1500 KVA, 11KV DG Set for CHIKLA MINE(TE-04 DT.14062018) | 14-06-2018 | 23-06-2018 | 23-06-2018 | 23-06-2018 | 04:30 PM | Active | View |
32. | Appointment of Qualified Coordination Agency (QCA) for Wind Power forecasting and scheduling from 15.2 MW Wind Farm at Ratedi(SDGM(E)/WE/15.2/18-19/90) | 13-06-2018 | 03-07-2018 | 03-07-2018 | 03-07-2018 | 03:30 PM | Active | View |
33. | Outsourcing of Pilot Plant Operation for Balaghat Mine(MOIL/18-19/ET/95) | 12-06-2018 | 10-07-2018 | 10-07-2018 | 10-07-2018 | 03:30 PM | Active | View |
34. | Providing, Supplying and Commissioning of Gear Motor for Tippler at Ukwa Mine.(UK/MECH/18-19/428 DATED 24/05/2018) | 11-06-2018 | 23-06-2018 | 23-06-2018 | 23-06-2018 | 04:30 PM | Active | View |
35. | Re-insulation of 220 KW 3.3 KV T motor(BGT/TE/Elect./18-19/188) | 11-06-2018 | 04-07-2018 | 04-07-2018 | 04-07-2018 | 04:30 PM | Active | View |
36. | Purchase of FRVE Header Bars for Anodes - 800 Nos. for EMD Plant, Dongri Buzurg Mine (1 Lot) (Only Through e-procurement(WE-38 DT.11/06/2018, eTENDER NO.MOIL/18-19/ET/104) | 11-06-2018 | 05-07-2018 | 05-07-2018 | 06-07-2018 | 03:30 PM | Active | View |
37. | PROVIDING, SUPPLYING, FIXING AND INSTALLATION OF ESE TYPE LIGHTING ARRESTER FOR RAILWAY AND ROAD WEIGH BRIDGE AT MUNSAR MINE(Elect/MUN/ADGM/18-19/181) | 11-06-2018 | 18-06-2018 | 18-06-2018 | 18-06-2018 | 03:30 PM | Active | View |
38. | STRINGING OF ONE SPAN 11KV OVERHEAD LINE AT MSEB LINE TAPPING FROM 11KV KANDRI FEEDER AT MUNSAR MINE(Elect/MUN/ADGM/18-19/183) | 11-06-2018 | 19-06-2018 | 19-06-2018 | 19-06-2018 | 03:30 PM | Active | View |
39. | Erection of new LT Overhead Line from 5th level substation to Filtration plant and Mine Hospital at Balaghat Mine(MOIL/18-19/ET/94) | 08-06-2018 | 09-07-2018 | 09-07-2018 | 09-07-2018 | 03:30 PM | Active | View |
40. | Purchase of Ammonium Nitrate (Prilled) - 75 MT.(WE-103 DT.07.06.2018(e-Tender no.MOIL/18-19/ET/103) | 08-06-2018 | 03-07-2018 | 03-07-2018 | 04-07-2018 | 03:30 PM | Active | View |
41. | Providing, Supplying, Installation and Commissioning of CCTV System at West Court, CMD Banglow, Nagpur and New Delhi Office(MOIL/18-19/ET/93) | 08-06-2018 | 06-07-2018 | 06-07-2018 | 06-07-2018 | 03:30 PM | Active | View |
42. | Designing and printing of Annual Report 2017-18 (Deluxe Version in English, Hindi and Marathi Shareholder version and Abridged Version in English, Translation of text from English to Hindi and Marathi and handling charges)(MOIL/18-19/ET/96) | 07-06-2018 | 25-06-2018 | 25-06-2018 | 25-06-2018 | 03:30 PM | Active | View |
43. | Purchase of 90 W LED Flood lights fitting IP 65, for new cell bay of EMD Plant at Dongri Buzurg Mine.(ADGM/DB/EMD/ELECT/18-19/143) | 07-06-2018 | 12-06-2018 | 12-06-2018 | 12-06-2018 | 04:30 PM | Active | View |
44. | Purchase of Amplifier unit, Megaphone Other associated accessories unit for blasting room at Dongri Buzurg Mine.(ADGM/DB/ELECT/18-19/136) | 07-06-2018 | 13-06-2018 | 13-06-2018 | 13-06-2018 | 04:30 PM | Active | View |
45. | Open e-Tender No. WE-36, ET-102 for Purchase of SULPHURIC ACID with Transportation - 275 MT(WE-36 e-tender No.MOIL/18-19/ET-102, Dt.07.06.18) | 07-06-2018 | 03-07-2018 | 03-07-2018 | 04-07-2018 | 03:30 PM | Active | View |
46. | Cleaning of accumulated Silt from cross cut of Different level at Balaghat Mine(Mining/BGT/T.E./2018-19/194) | 06-06-2018 | 12-06-2018 | 12-06-2018 | 12-06-2018 | 04:30 PM | Active | View |
47. | Removal of Spillage material accumulated during hoisting of skip from 15th Level of Production shaft at Balaghat Mine(Mining/BGT/T.E./2018-19/198) | 06-06-2018 | 12-06-2018 | 12-06-2018 | 12-06-2018 | 04:30 PM | Active | View |
48. | Installation of Biometric attendance system at Gumgaon Mine(MOIL/18-19/ET/88) | 06-06-2018 | 03-07-2018 | 03-07-2018 | 03-07-2018 | 03:30 PM | Active | View |
49. | PURCHASE OF CUMMINS DIESEL ENGINE - 1 NO. SUITABLE FOR BEML MAKE BD155 DOZER OPERATING AT TIRODI MINE (AS PER ANNEXURE - A ENCLOSED)(PUR/MOIL/C-4/139/E-15/260-M DT.05.06.2018) | 05-06-2018 | 20-06-2018 | 20-06-2018 | 20-06-2018 | 03:30 PM | Active | View |
50. | Providing and fixing of exterior tiles and paiver blocks for front and backside portion of Agent bungalow Balaghat Mine(Civil/BGT/T.E./2017-19/1527 Date- 31.05.2018) | 04-06-2018 | 11-06-2018 | 11-06-2018 | 11-06-2018 | 04:30 PM | Active | View |
51. | Replacement of Old Worn Out Steel Doors and Windows with new steel doors and windows for Camp Quarters at Balaghat Mine.( CIVIL/BGT/T.E./2018-19/172 Date 31.05.2018) | 04-06-2018 | 11-06-2018 | 11-06-2018 | 11-06-2018 | 04:30 pm | Active | View |
52. | WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR LHD AND SDL MACHINES-MAKE EIMCO ELECON.(PUR/MOIL/C-5/27/E-13/219-M Dt. 04/06/2018) | 04-06-2018 | 27-06-2018 | 27-06-2018 | 27-06-2018 | 03:30 PM | Active | View |
53. | Picking and collection of material from crushed ROM DBL 456 at South Part II of the Quarry at Dongri Buzurg Mine(MOIL/18-19/ET/90) | 04-06-2018 | 04-07-2018 | 04-07-2018 | 04-07-2018 | 03:30 PM | Active | View |
54. | Picking and sorting of material SM Grade Lump 30 percent Mn ore (KDL-435) and SM Grade 25 percent Mn ore KDL 446 from dumps at Kandri Mine(MOIL/18-19/ET/92) | 04-06-2018 | 04-07-2018 | 04-07-2018 | 04-07-2018 | 03:30 PM | Active | View |
55. | Picking and collection of material from crushed ROM DBL 456 at South Part III of the Quarry at Dongri Buzurg Mine(MOIL/18-19/ET/91) | 04-06-2018 | 04-07-2018 | 04-07-2018 | 04-07-2018 | 03:30 PM | Active | View |
56. | Picking and collection of UKL 448 25 PERCENT from F W dumps from Ch 6800 to ch 8600 at Ukwa Mine(MOIL/18-19/ET/89) | 04-06-2018 | 04-07-2018 | 04-07-2018 | 04-07-2018 | 03:30 PM | Active | View |
57. | Picking and collection of UKL 448 25 PERCENT from F W dumps from Ch 6800 to ch 8600 at Ukwa Mine(MOIL/18-19/ET/89) | 04-06-2018 | 10-07-2018 | 10-07-2018 | 10-07-2018 | 03:30 PM | Active | View |
58. | Concreting work for Packwall bracewall at Ch 10800 section of Ukwa Mine(16/Mining/UM/18-19/471) | 04-06-2018 | 18-06-2018 | 18-06-2018 | 18-06-2018 | 04:30 pm | Active | View |
59. | PROVIDING, SUPPLYING, INSTALLATION AND COMMISSIONING OF TUB PULLING ARRANGEMENT AT VERTICAL SHAFT PIT TOP OF MUNSAR MINE.(MUN/MECH/18-19/170) | 04-06-2018 | 18-06-2018 | 18-06-2018 | 18-06-2018 | 03:30 pm | Active | View |
60. | purchase of 3.5 C x 70 Sq. MM PVC Insulated Single Wire Armoured, Aluminium Conductor Cable of 1100 Volts Grade(WE-35 Dt.02/06/2018(e-Tender no.MOIL/18-19/ET/101)) | 02-06-2018 | 12-06-2018 | 12-06-2018 | 13-06-2018 | 03:30 pm | Active | View |
61. | Underground Filling spreading at 270 Level and 370 Level at Chikla Mine(MOIL/18-19/ET/80) | 02-06-2018 | 02-07-2018 | 02-07-2018 | 02-07-2018 | 03:30 pm | Active | View |
62. | Annual Underground sand cleaning work at Balaghat Mine(MOIL/18-19/ET/82) | 02-06-2018 | 02-07-2018 | 02-07-2018 | 02-07-2018 | 03:30 pm | Active | View |
63. | Loading and unloading of steel section and various materials with stacking at NOS Kandri Mine store(MOIL/18-19/ET/79) | 02-06-2018 | 02-07-2018 | 02-07-2018 | 02-07-2018 | 03:30 pm | Active | View |
64. | Making and supply of stemming material Mud Plug for blasting at Ukwa Mine(MOIL/18-19/ET/81) | 02-06-2018 | 02-07-2018 | 02-07-2018 | 02-07-2018 | 03:30 pm | Active | View |
65. | Re-tiling and roof repair including Laying polythene sheet over roof of camp quarters at Chikla Mine( TE/CH/CIVIL/18-19/117 date 27/05/2018) | 02-06-2018 | 07-06-2018 | 07-06-2018 | 07-06-2018 | 03:30 pm | Active | View |
66. | Sampling of Manganese ore for output (Production) and Despatch (Railing) for all the mines of MOIL Limited(MOIL/18-19/ET/87) | 02-06-2018 | 15-06-2018 | 15-06-2018 | 15-06-2018 | 03:30 pm | Active | View |
67. | COMPUTER HARDWARE AMC for Chikla and Dongri Buzurg Mine 2018-19 (COMPREHENSIVE)(TE/CH/SYSTEM/AMC/2018-19/1/128) | 01-06-2018 | 07-06-2018 | 07-06-2018 | 07-06-2018 | 04:00 PM | Active | View |
68. | Repairing and servicing of Actuators of Butterfly Valve of I.M.B Plant at Balaghat Mine(AGT/BGT/MECH/IMB/18-19/164 dtd 29.05.2018) | 31-05-2018 | 03-07-2018 | 03-07-2018 | 03-07-2018 | 04:30 PM | Active | View |
69. | Repairing of 4 Flow Hydraulic Pump Of Sandvik make Jumbo Drill Machine operating at Balaghat Mine(AGT/BGT/MECH/18-19/165 dtd 31.05.2018) | 31-05-2018 | 07-06-2018 | 07-06-2018 | 07-06-2018 | 04:30 PM | Active | View |
70. | WEBSITE TENDER ENQUIRY IN TWO BID SYSTEM TO ENTER INTO BLANKET RATE CONTRACT FOR TWO YEARS (i.e.01/04/2018 TO 31/03/2020) FOR PURCHASE OF HOLMAN-ROCKWELL MAKE SPARES FOR ROCK DRILL AND AIR LEG MACHINES HOLMAN AND ROCKEWELL ONLY.(PUR/MOIL/C-5/16/E-11/217-M | 31-05-2018 | 22-06-2018 | 22-06-2018 | 22-06-2018 | 03:30 PM | Active | View |
71. | Purchase of Reduction Gear Box - 1 No.(1 Lot) for Man Winding Engine of Production Shaft at Balaghat Mine(M.P) (Only Through e-procurement)(WE-34 DT.30/05/2018, eTENDER NO.MOIL/18-19/ET/86) | 30-05-2018 | 25-06-2018 | 25-06-2018 | 26-06-2018 | 03:30 PM | Active | View |
72. | Retilling and Reroofing of country tiles and manglower tiles roof of Residencial quarter at Tirodi Mine(TRD/Civil/A/2018-19/569B Dated 27/05/2018) | 30-05-2018 | 06-06-2018 | 06-06-2018 | 06-06-2018 | 03:30 PM | Active | View |
73. | Cleaning of susrface drain and making of Earthen bound Preparation Mansoon south , north section and 7No. Pit to 9 No. pit area at Tirodi Mine(TRD/CIVIL/2018-19/569-C) | 30-05-2018 | 06-06-2018 | 06-06-2018 | 06-06-2018 | 03:30 PM | Active | View |
74. | Sand stowing plant operation at Gumgaon Mine(MOIL/18-19/ET/72) | 29-05-2018 | 28-06-2018 | 28-06-2018 | 28-06-2018 | 03:30 PM | Active | View |
75. | Drilling of holes for cable bolting and grouting operation at Kandri Mine(MOIL/18-19/ET/73) | 29-05-2018 | 28-06-2018 | 28-06-2018 | 28-06-2018 | 03:30 PM | Active | View |
76. | Picking and collection of material from crushed ROM (DBL-456) at South Part of Quarry at Dongri Buzurg Mine(MOIL/18-19/ET/75) | 29-05-2018 | 28-06-2018 | 28-06-2018 | 28-06-2018 | 03:30 PM | Active | View |
77. | Winzing from 12th Level to 13.5th Level at Balaghat Mine(MOIL/18-19/ET/74) | 29-05-2018 | 28-06-2018 | 28-06-2018 | 28-06-2018 | 03:30 PM | Active | View |
78. | Picking and collection of material (DBL-456 and DBL-457) from surplus contaminated low grade ROM at Dongri Buzurg Mine(MOIL/18-19/ET/77) | 29-05-2018 | 29-06-2018 | 29-06-2018 | 29-06-2018 | 03:30 PM | Active | View |
79. | Picking and collection of material from crushed ROM (DBL-456) at South Part-I of the Quarry at Dongri Buzurg Mine(MOIL/18-19/ET/76) | 29-05-2018 | 29-06-2018 | 29-06-2018 | 29-06-2018 | 03:30 PM | Active | View |
80. | Picking and collection of material (DBL-456 and DBL-457) from surplus contaminated low grade ROM at Dongri Buzurg Mine(MOIL/18-19/ET/78) | 29-05-2018 | 29-06-2018 | 29-06-2018 | 29-06-2018 | 03:30 PM | Active | View |
81. | HIRING OF EXCAVATOR ON HOURLY BASIS AT CHIKLA MINE(TE-05 Dt.26052018) | 29-05-2018 | 02-06-2018 | 02-06-2018 | 02-06-2018 | 04:30 PM | Active | View |
82. | Purchase of Kirloskar and Benlec make Carbon brush and carbon brush holder( BGT/TE/Elect./18-19/814) | 28-05-2018 | 20-06-2018 | 20-06-2018 | 20-06-2018 | 04:30 PM | Active | View |
83. | Miners Safety Canvas Boots(PUR-MOIL-C-1-186-WE-32-ET-85 dt.28.05.2018) | 28-05-2018 | 19-06-2018 | 19-06-2018 | 20-06-2018 | 03:30 PM | Active | View |
84. | WEBSITE PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR ABB MAKE SF6 HT BREAKER.(PUR/MOIL/C-11/155/E-10/201-M Dt. 25-05-2018) | 28-05-2018 | 29-06-2018 | 29-06-2018 | 29-06-2018 | 03:30 PM | Active | View |
85. | HIRING OF HYDRAULIC ROCK BREAKER WITHHYDRAULIC EXCVATOR FOR LGHS PRODUCTION AT DONGRI BUZURG MINE(DB/MECH/PROJECT/18-19/ 115) | 28-05-2018 | 05-06-2018 | 05-06-2018 | 05-06-2018 | 04:30 PM | Active | View |
86. | Providing and laying torchshield over mangalore tiled roofing for mine managers Bungalow balaghat Mine(Civil/BGT/T.E./2018-19/141) | 28-05-2018 | 04-06-2018 | 04-06-2018 | 04-06-2018 | 04:30 PM | Active | View |
87. | Maintenance and cleaning of New Administrative Building at Munsar Mine( MUN/MINING/18-19/613) | 28-05-2018 | 06-06-2018 | 06-06-2018 | 06-06-2018 | 03:30 PM | Active | View |
88. | Trench Cutting at OCF stacks at Munsar Mine(MUN/MINING/18-19/612) | 28-05-2018 | 06-06-2018 | 06-06-2018 | 06-06-2018 | 03:30 PM | Active | View |
89. | Providing and applying distempering, painting, of Ground Floor, First Floor and Second Floor and outer Snowcem to MOIL Bhawan, Nagpur(MOIL/18-19/ET/71) | 28-05-2018 | 08-06-2018 | 08-06-2018 | 08-06-2018 | 03:30 PM | Active | View |
90. | Drilling of Borehole, Supply of Submersible Pump with pipeline etc. at the location of High Speed Shaft Gumgaon Mine(MOIL/18-19/ET/83) | 28-05-2018 | 08-06-2018 | 08-06-2018 | 08-06-2018 | 03:30 PM | Active | View |
91. | Procurement of Copper Lugs, double Compression Cable Glands and Tools for Balaghat Mine(BGT/TE/Elect./18-19/98) | 25-05-2018 | 11-06-2018 | 11-06-2018 | 11-06-2018 | 04:30 PM | Active | View |
92. | Providing and Supplying of trailing cable for Balaghat Mine(BGT/TE/Elect./18-19/132) | 25-05-2018 | 20-06-2018 | 20-06-2018 | 20-06-2018 | 04:30 PM | Active | View |
93. | Providing supplying and installation of CCTV system for the vertical shaft of Ukwa Mine.(Uk/elect/2018-19/435) | 25-05-2018 | 07-06-2018 | 07-06-2018 | 07-06-2018 | 04:30 PM | Active | View |
94. | WEBSITE TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF NEOPRENE RUBBER CUSHION - 300 Mtrs.(PUR/MOIL/C-11/147/E-09/196-M) | 24-05-2018 | 22-06-2018 | 22-06-2018 | 22-06-2018 | 03:30 PM | Active | View |
95. | Rewinding and Repairs of submersible water pumps of Balaghat Mine(BGT/TE/Elect./18-19/96) | 23-05-2018 | 11-06-2018 | 11-06-2018 | 11-06-2018 | 04:30 PM | Active | View |
96. | Installation of 1000KVA Transformer for power supply of skip winder at Balaghat Mine(BGT/TE/Elect./18-19/119) | 23-05-2018 | 20-06-2018 | 20-06-2018 | 20-06-2018 | 04:30 PM | Active | View |
97. | Open e-Tender No. WE-29, ET-84 for purchase of SCREEN FRAME WITH SCREEN PANEL FOR JIG(WE-29 e-tender No.MOIL/18-19/ET-84, Dt.23.05.18) | 23-05-2018 | 18-07-2018 | 18-07-2018 | 19-07-2018 | 03:30 PM | Active | View |
98. | Drilling of Borehole at Awlajhari Pumping Station towards Water supply Scheme at Balaghat Mine.(Civil/ BGT/T.E./2018-19/122) | 23-05-2018 | 29-05-2018 | 29-05-2018 | 29-05-2018 | 04:40 PM | Active | View |
99. | Retiling and Reroofing of camp quarters at Kandri mine(Kan/Civil/NIT/18-19/12) | 23-05-2018 | 29-05-2018 | 29-05-2018 | 29-05-2018 | 04:30 PM | Active | View |
100. | Cleaning of storm water drain of surface and underground sump at Kandri mine(Kan/Civil/NIT/18-19/11) | 22-05-2018 | 29-05-2018 | 29-05-2018 | 29-05-2018 | 04:30 PM | Active | View |
Tenders More Information |
---|
Contracts finalised on nomination basis Details of Purchase Order issued by MATERIALS DEPARTMENT valuing Rs.30.00 Lakhs & Above
List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website) |
View (2024) Year Tenders |
View (2023) Year Tenders |
View (2022) Year Tenders |
View (2021) Year Tenders |
View (2020) Year Tenders |
View (2019) Year Tenders |
View (2018) Year Tenders |
View (2017) Year Tenders |
View (2016) Year Tenders |
View (2015) Year Tenders |
View (2014) Year Tenders |
View (2013) Year Tenders |
View (2012) Year Tenders |
View (24) Year Tenders |
View Full Tender Archive |
See all MOIL tender. |