निविदा संग्रह

निविदाएं संग्रह

खोज के लिए शीर्षक निविदा जारी करने की तिथि निविदा जारी करने की अंतिम तिथि
क्रमांक शीर्षक अंक प्रारंभ दिनांक अंक अंतिम तिथी प्रस्तुत करने की अंतिम तिथि खुलने की तिथि खुलने का समय स्थिति और देखें
1. Replacement of CFL Lamps and FI. Lamp fixture with LED Lights at CMD Bungalow MOIL Ltd. Nagpur(SDGM(E)/86/ HO/16-17/ 337) 17-03-2017 06-04-2017 06-04-2017 06-04-2017 03:30 PM Active और देखें
2. Making and Supply of stemming material(Mud Plug) used for Blasting at Ukwa Mine(A and Sr DGM(M)/Civil/UM/16-17/3461) 16-03-2017 01-04-2017 01-04-2017 01-04-2017 04:30 PM Active और देखें
3. Trench cutting in Ore stacks including sample bags carrying at Ukwa Mine(A and Sr DGM(M)/Civil/UM/16-17/3458) 16-03-2017 01-04-2017 01-04-2017 01-04-2017 04:30 PM Active और देखें
4. RENOVATION OF TOILETS IN MM BUNGALOW AT KANDRI MINE(KAN/CIVIL/16-17/197 DT 14.03.2017) 15-03-2017 21-03-2017 21-03-2017 21-03-2017 03:00 PM Active और देखें
5. PLOTTER (44) - 1 NO. (AS PER ANNEXURE - C ENCLOSED) (Only Through e-procurement)(WE-121 DT.15/03/2017, eTENDER NO.MOIL/16-17/ET/204) 15-03-2017 07-04-2017 07-04-2017 07-04-2017 03:30 PM Active और देखें
6. outsource of pumping operation at underground vertical shaft 400 ft level at Gumgaon mine by contractual means for 2 months.(A-III/MUN/GUM/16-17/1605 dated-11.03.2017) 14-03-2017 16-03-2017 16-03-2017 16-03-2017 04:30 PM Active और देखें
7. REPAIRING OF TRACK CHAIN ASSY- 2 Nos, SPROCKET ASSY- 2 Nos AND IDLER ASSY- 2 Nos OF DI 500 No 1 SANDVIK MAKE DRILLING MACHINE OPERATING AT DONGRI BUZURG MINE(A-II/CHK/DB/16-17/997 dtd 11.03.2017) 14-03-2017 22-03-2017 22-03-2017 22-03-2017 04:30 PM Active और देखें
8. Construction of Residential Quarter at Chikla Mine of MOIL (AType 100 units 8 Nos Type B quarters, 4 Nos Type C quarters and 1 No Type D quarter ) including Internal and External Electrification Infrastructure amenities.(MOIL/16-17/ET/182) 14-03-2017 10-04-2017 10-04-2017 10-04-2017 03:30 PM Active और देखें
9. Construction of Residential Quarter at Chikla Mine of MOIL (AType 100 units 8 Nos Type B quarters, 4 Nos Type C quarters and 1 No Type D quarter ) including Internal and External Electrification Infrastructure amenities.(MOIL/16-17/ET/182) 14-03-2017 10-04-2017 10-04-2017 10-04-2017 03:30 PM Active और देखें
10. Refurbishing and deepening of 2nd outlet and modification of sinking winder at Balaghat mine.(SDGMT/BGT/II-Outlet/Tender/16-17/302/ET-195) 14-03-2017 18-04-2017 18-04-2017 18-04-2017 03:30 PM Active और देखें
11. Sinking of 2nd. Outlet- Ventilation shaft from surface to -150L (2nd. Level) at Kandri Mine(SDGMT/KAN/V-ShaftII-Outlet/Tender/16-17/303/ET-196) 14-03-2017 19-04-2017 19-04-2017 19-04-2017 03:30 PM Active और देखें
12. Out sourcing of crushing and screening plant operation at Gumgaon mine(A-III/MUN/GUM/16-17/1607 dated-11.03.2017) 11-03-2017 16-03-2017 16-03-2017 16-03-2017 04:30 PM Active और देखें
13. Sulphuric Acid(PUR/MOIL/C-11/3/WE-120 (MOIL/16-17/ET/203)) 11-03-2017 31-03-2017 31-03-2017 31-03-2017 03:30 PM Active और देखें
14. Providing and Supplying of Auxiliary Ventilation Fan 1.5 KW, 1480RPM, Hollow FRP Blade, 7000 cfm for Gumgaon mine 2 Nos(GM/ELECT/TE/16-17/3830 DT. 11.03.2017) 11-03-2017 31-03-2017 31-03-2017 31-03-2017 03:30 PM Active और देखें
15. Removal of spillage material accumulated during hoisting of skip from 15th L of production shaft at Balaghat Mine(Gr.-I/CGM(PR)/CONT/SPILLAGE/32/BGT/16-17/16) 10-03-2017 21-03-2017 21-03-2017 21-03-2017 03:30 PM Active और देखें
16. HIRING OF 80 MT CAPACITY MOBILE CRANE WITH 360 DEGREE REVOLVING TELESCOPIC EXTENDED BOOM OF UNLOADING AND ASSEMBLING OF TATA HITACHI EX1200V 1 NO EXCAVATOR AT DONGRI BUZURG MINE(A-II/CHK/DB/16-17/990 dtd 08.03.2017) 09-03-2017 14-03-2017 14-03-2017 14-03-2017 04:30 PM Active और देखें
17. Cleaning of surplus underground ROM at Kandri Mine (GM(M)-III/CONT/59/ROM-CL/KAN/16-17/54) 08-03-2017 15-03-2017 15-03-2017 15-03-2017 3:30 PM Active और देखें
18. PURCHASE OF SPARES FOR SAYAJI JAW CRUSHERS(PUR/MOIL/C-5/30/E-69/2069-M) 07-03-2017 17-03-2017 17-03-2017 17-03-2017 03:30 PM Active और देखें
19. PURCHASE OF BOILER SPARES IMPELLER AND SHAFT(PUR/MOIL/C-11/20/E-79/2101-M) 07-03-2017 22-03-2017 22-03-2017 22-03-2017 03:30 PM Active और देखें
20. Purchase of all in one Integrated Solar LED Street Lighting System 466 Nos(WE- 99 (e-tender no.MOIL/16-17/ET/199)) 07-03-2017 06-04-2017 06-04-2017 06-04-2017 03:30 PM Active और देखें
21. Cleaning of surplus opencast ROM at Kandri Mine(MOIL/16-17/ET/198) 07-03-2017 07-04-2017 07-04-2017 07-04-2017 03:30 PM Active और देखें
22. Consultancy Services for Preparation Of Design, Drawings and Detail Estimate for construction Of Material Handling Systems and Crushing and Screening Plants etc. at various Mines(MOIL/16-17/ET/197) 07-03-2017 07-04-2017 07-04-2017 07-04-2017 03:30 PM Active और देखें
23. Drilling of 115mm Diameter Hole for Opencast Development at Dongri Buzurg Mine(AII/CHK/DB/MECH/16-17/981 dtd 05.03.2017) 06-03-2017 11-03-2017 11-03-2017 11-03-2017 04:30 PM Active और देखें
24. Pushing and unloading of ROM and rock tubs in underground and on surface at Gumgoan Min(GM(M)-III/CONT/57/PUSHING/GUM/16-17/53) 06-03-2017 15-03-2017 15-03-2017 15-03-2017 03:30 PM Active और देखें
25. Providing and erecting Barbed wire fencing at Crushing plant at Chikla Mine(CH/CIVIL/16-17/941 dated 20/02/2017) 04-03-2017 08-03-2017 08-03-2017 08-03-2017 03:30 PM Active और देखें
26. Maintenance of garden at various places at Dongri Bz. Mine.(CIVIL/HO/16-17/CH/89 Dt- 03/03/2017) 04-03-2017 05-04-2017 05-04-2017 05-04-2017 03:30 PM Active और देखें
27. Applications for empanelment of firms for conducting Transaction Auditing for three (MOIL/I. Audit/2017/ 197) 02-03-2017 30-03-2017 30-03-2017 30-03-2017 2:30 PM Active और देखें
28. Land Scapping and Plantation For Development of Garden At Guest House Of Tirodi Mine.(TRD/Civil/HO/2016-17/964) 01-03-2017 08-03-2017 08-03-2017 08-03-2017 04:30 PM Active और देखें
29. DRILLING OF BORE HOLE 100 MM DIAMETER IN UNDERGROUND AT BALAGHAT MINE FOR THE 2017-18(DGM/BGT/MECH/B-HOLE/16-17/ 8198) 01-03-2017 17-03-2017 17-03-2017 17-03-2017 04:30 PM Active और देखें
30. DRINKING WAER SUPPLY BY OPERATING PUMPS AT KANDRI MINE(KAN/CIVIL/16-17/190 DT.25.02.2017) 25-02-2017 07-03-2017 07-03-2017 07-03-2017 03:30 PM Active और देखें
31. Picking and Collection of material from contaminated low grade ROM at Eastern side of Quarry at Dongri Buzurg Mine(MOIL/16-17/ET/184) 25-02-2017 16-03-2017 16-03-2017 16-03-2017 03:30 PM Active और देखें
32. Picking and Collection of material from contaminated ROM by using crusher at Dongri Buzurg Mine(MOIL/16-17/ET/183) 25-02-2017 16-03-2017 16-03-2017 16-03-2017 03:30 PM Active और देखें
33. Schedule for Annual repairs and maintenance for domestic Electrical installations of Residential and Non Residential buildings of Gumgaon mine(GM/ELECT/TE/16-17/3699 DT. 23.02.2016) 24-02-2017 21-03-2017 21-03-2017 21-03-2017 03:30 PM Active और देखें
34. e-procurement of A-4 SIZE PAPER (BILT /J.K. /T.N.P.L. MAKE).(WE-119 e-tender No.MOIL/16-17/ET-193, Dt.23.02.17) 23-02-2017 06-04-2017 06-04-2017 06-04-2017 03:30 PM Active और देखें
35. e-procurement of A-4 SIZE PAPER (BILT /J.K. /T.N.P.L. MAKE). (WE-119 e-tender No.MOIL/16-17/ET-193, Dt.23.02.17) 23-02-2017 18-04-2017 18-04-2017 18-04-2017 3:30 PM Active और देखें
36. Construction of temporary Substation for installation L.T. and H.T. Switchgear along with Transformer Room for IInd Vertical Shaft at Ukwa Mine(A and Sr DGM(M)/Civil/UM/16-17/3288) 22-02-2017 04-03-2017 04-03-2017 04-03-2017 04:30 PM Active और देखें
37. PURCHASE OF MANWINDING STEEL WIRE ROPE(WE-118 Dt.22/02/2017(eTender no.MOIL/16-17/ET/194)) 22-02-2017 22-03-2017 22-03-2017 22-03-2017 03:30 PM Active और देखें
38. Jaw Plates for Sayaji Make Jaw Crushers(PUR/MOIL/C-5/30/WE- 101 (MOIL/16-17/ET/192)) 22-02-2017 24-03-2017 24-03-2017 24-03-2017 03:30 PM Active और देखें
39. Picking and collection of material from South side of Siding waste dump at Tirodi Mine(Gr.II/GM(M)/CONT/R-DUMP/73/TRD/2016-17/53) 21-02-2017 28-02-2017 28-02-2017 28-02-2017 03:30 PM Active और देखें
40. Supply of black gitti in underground concreeting at Kandri Mine(GM(M)-III/CONT/Gitti/KAN/2016-17/52) 21-02-2017 28-02-2017 28-02-2017 28-02-2017 03:30 PM Active और देखें
41. Picking and collection of material from South staff Quarter waste Dump at Tirodi Mine(Gr.II/GM(M)/CONT/R-DUMP/74/2016-17/54) 21-02-2017 28-02-2017 28-02-2017 28-02-2017 03:30 PM Active और देखें
42. Maintenance of Garden in Mine office and Managers Bungalow at Beldongri Mine.(Bel/Civil/AGT/16-17/3166) 20-02-2017 28-02-2017 28-02-2017 28-02-2017 04:30 PM Active और देखें
43. Fabrication of Bucket Pins and Yokes, collar and link bushings of BE 700 no.2 and 3 Hydraulic Excavator Operating at Dongri Buzurg Mine(AII/CHK/DB/MECH/16-17/931 dtd 17.02.2017) 20-02-2017 28-02-2017 28-02-2017 28-02-2017 04:30 PM Active और देखें
44. Obtaining Environment Clearance from District Environment Impact Assessment Authority Balaghat for sand query lease at KankiTah-Lalbarra, Dist. Balaghat over an area of 4.413 Ha. as per scope of work mentioned in NIT(SDGM(M)/SE/ KC-KANKI/ 16-17/ 4 dt.18/0 20-02-2017 02-03-2017 02-03-2017 02-03-2017 03:00 PM Active और देखें
45. ELECTRONIC TOTAL STATION WITH ACCESSORIES FOR SURVEYING of MINES WITH COMPREHENSIVE AMC - 7 SETS. (AS PER ANNEXURE - C ENCLOSED) (Only Through e-procurement)(WE-112 DT.20/02/2017, eTENDER NO.MOIL/16-17/ET/191) 20-02-2017 21-03-2017 21-03-2017 21-03-2017 03:30 PM Active और देखें
46. PICKING AND COLLECTION 20PERCENT MN SM GR-TDL469 FROM NORTH SIDE OF SIDDHA BABA DUMP AT TIRODI MINE(TRD/MINE/HO/2016-17/3414, DT.18.02.2017) 18-02-2017 25-02-2017 25-02-2017 25-02-2017 06:55 PM Active और देखें
47. PICKING AND COLLECTION OF 20 PERCENTAGE MN SM GRADE TDL-469 FROM SOUTH SIDING DUMP AT TIRODI MINE(TRD/MINE/HO/2016-17/3415, DT.18.02.2017) 18-02-2017 25-02-2017 25-02-2017 25-02-2017 06:00 PM Active और देखें
48. Picking and collection of material from waste dumps at Sitapatore mine()Gr.II/GM(M)/CONT/R-DUMP/71/SITA/2016-17/52 17-02-2017 27-02-2017 27-02-2017 27-02-2017 03:30 PM Active और देखें
49. Dismantling of old quarter of Balapur Camp and baboo line .(Agent/Civil/DB/2016-17/909) 17-02-2017 22-02-2017 22-02-2017 22-02-2017 04:30 PM Active और देखें
50. Procurement of miscellaneous electrical item For EMD Plant at Dongri Buzurg Mine.(DB/EMD/ELECT/16-17/916) 17-02-2017 23-02-2017 23-02-2017 23-02-2017 04:30 PM Active और देखें
51. CLeaning of surplus underground ROM at Munsar Mine(GM(M)-III/CONT/52/ROM/MUN/2016-17/51) 17-02-2017 23-02-2017 23-02-2017 23-02-2017 03:30 PM Active और देखें
52. LT APFC PANELS FOR VARIOUS MINES - 5 NOS. (AS PER ANNEXURE - C ENCLOSED) (Only Through e-procurement)(WE-117 DT.17/02/2017, eTENDER NO.MOIL/16-17/ET/190) 17-02-2017 15-03-2017 15-03-2017 15-03-2017 03:30 PM Active और देखें
53. Purchase of Cross Bit 57MM Dia suitable for Cable Bolting Machine(PUR/MOIL/C-5/12/WE-54 (MOIL/16-17/ET/189)) 17-02-2017 15-03-2017 15-03-2017 15-03-2017 03:30 PM Active और देखें
54. Annual repairs and maintenance contract for domestic electrical installation of residential and non residential building of Balaghat Mine(BGT/TE/Elect/16-17/7853) 17-02-2017 15-03-2017 15-03-2017 15-03-2017 04:30 PM Active और देखें
55. e-procurement for Printing of Computer Stationery- 4 Items(WE-116 e-tender No.MOIL/16-17/ET-188, Dt.17.02.17) 17-02-2017 06-04-2017 06-04-2017 06-04-2017 03:30 PM Active और देखें
56. REDUCTION GEAR BOX FOR BELT CONVEYOR APPLICATION - 1 NO. (AS PER ANNEXURE - C ENCLOSED) (Only Through e-procurement)(WE-115 DT.16/02/2017, eTENDER NO.MOIL/16-17/ET/187) 16-02-2017 15-03-2017 15-03-2017 15-03-2017 03:30 PM Active और देखें
57. Construction of compound wall at staff quarter at Upper camp near Hospital and at Officer Colony at Chikla Mine(MOIL/16-17/ET/176) 15-02-2017 14-03-2017 14-03-2017 14-03-2017 03:30 PM Active और देखें
58. Construction of storm water drain at Chikla B Section and construction of road side drain from Siding Office to Chika B at Chikla Mine(MOIL/16-17/ET/180) 15-02-2017 14-03-2017 14-03-2017 14-03-2017 03:30 PM Active और देखें
59. Water Proofing Works at Beldongri Mine(MOIL/16-17/ET/181) 15-02-2017 14-03-2017 14-03-2017 14-03-2017 03:30 PM Active और देखें
60. Extension of Administrative Building at Chikla Mine(MOIL/16-17/ET/175) 15-02-2017 14-03-2017 14-03-2017 14-03-2017 03:30 PM Active और देखें
61. Drilling of 02 Nos of Bore Holes for Sand stowing plant at Beldongri Mine(Civil /HO/16-17 /BEL/88 Dated 14/02/2017) 15-02-2017 15-03-2017 15-03-2017 15-03-2017 03:30 PM Active और देखें
62. HOT CRANE, 5 MT. - 1 NO. FOR WORKSHOP OF BALAGHAT MINE (AS PER ANNEXURE - C ENCLOSED) (Only Through e-procurement)(WE-114 DT.14/02/2017, eTENDER NO.MOIL/16-17/ET/186) 14-02-2017 08-03-2017 08-03-2017 08-03-2017 03:30 PM Active और देखें
63. Operation and Maintenance work of electrical installations of establishment at Corporate Office, Nagpur comprises of MOIL Bhawan, Rest House, West Court, Hospital and other official buildings of the company for the period of one year.(SDGM(E)/86/ HO/16-17 14-02-2017 14-03-2017 14-03-2017 14-03-2017 03:30 PM Active और देखें
64. e-procurement of Tub Coupling Chain and Pin -3 Items(WE-113 e-tender No.MOIL/16-17/ET-185, Dt.14.02.17) 14-02-2017 21-03-2017 21-03-2017 21-03-2017 03:30 PM Active और देखें
65. Hiring of Bolero Jeep (Diesel) for the period of One year for Balaghat Mine.(DGM/BGT/MECH/TAXI/16-17/7810 Date 10.02.2017) 13-02-2017 28-02-2017 28-02-2017 28-02-2017 04:30 PM Active और देखें
66. Washing, Picking and collection of material from East side of A-dump (waste dump) at Tirodi Mine.(Gr.II/GM(M)/CONT/WASH/65/TRD/2016-17/51) 13-02-2017 21-02-2017 21-02-2017 21-02-2017 03:30 PM Active और देखें
67. RENOVATION OF TOILETS IN MINE OFFICE(KAN/CIVIL/16-17/182 DT 11.02.2017) 12-02-2017 20-02-2017 20-02-2017 20-02-2017 03:30 PM Active और देखें
68. Laying of PCC plateform below ROM Bunker and crushing plant at Gumgaon Mine(Civil/16-17/GUM/3600 Date 08.02.2017) 10-02-2017 16-02-2017 16-02-2017 16-02-2017 04:00 PM Active और देखें
69. PURCHASE OF SPARES FOR SAICO MAKE HOIST 5 TON CAPACITY(PUR/MOIL/C-11/136/E-78/2004-M) 08-02-2017 01-03-2017 01-03-2017 01-03-2017 03:30 PM Active और देखें
70. Installation of Watertight door at 234 MRL at Beldongri Mine(Bel/Civil/AGT/16-17/3076) 07-02-2017 17-02-2017 17-02-2017 17-02-2017 04:30 PM Active और देखें
71. Supplying, providing, installation and commissioning of Centralized UPS and required wiring for computers of office buildings at Balaghat, Tirodi in MP and Chikla, Dongri Buzurg, Gumgaon, Munsar and Kandri Mine in Maharashtra(SDGM(E)/86/ HO/16-17/ 292) 07-02-2017 03-03-2017 03-03-2017 03-03-2017 03:30 PM Active और देखें
72. Supplying, providing, installation and commissioning of Centralized UPS and required wiring for computers of office buildings at Balaghat, Tirodi in MP and Chikla, Dongri Buzurg, Gumgaon, Munsar and Kandri Mine in Maharashtra (SDGM(E)/86/ HO/16-17/ 292 ) 07-02-2017 07-03-2017 07-03-2017 07-03-2017 3:30 PM Active और देखें
73. Repair to Ben Electrical make 10 HP DC Traction motors belong to Ovis make battery locomotive of Balaghat Mine(BGT/TE/Elect/16-17/7630 Date 01.02.2017) 06-02-2017 02-03-2017 02-03-2017 02-03-2017 04:30 PM Active और देखें
74. SPIRAL CLASSIFIER FOR BALAGHAT MINE - 1 NO. (AS PER ANNEXURE - C ENCLOSED) (Only Through e-procurement)(WE-111 DT.06/02/2017, eTENDER NO.MOIL/16-17/ET/179) 06-02-2017 10-03-2017 10-03-2017 10-03-2017 03:30 PM Active और देखें
75. Supply of Medicines (Tenderers to note that offers shall be accepted from companies having ORG Ranking upto top 100 only as per ORG list of March 2016)(WE-98 e-tender No.MOIL/16-17/ET-177, Dt.06.02.17) 06-02-2017 23-03-2017 23-03-2017 23-03-2017 03:30 PM Active और देखें
76. e-Procurement of Mens Shoe, Lace type, Oxford Pattern with toe for Security Guards, Make of the Shoe-Bata-Liberty-2 items(WE-110 e-tender No.MOIL/16-17/ET-178, Dt.06.02.17) 06-02-2017 16-03-2017 16-03-2017 16-03-2017 03:30 PM Active और देखें
77. PURCHASE OF STAINLESS STEEL BALL VALVES(PUR/MOIL/C-11/14/E-76/1964-M) 04-02-2017 27-02-2017 27-02-2017 27-02-2017 03:30 PM Active और देखें
78. PURCHASE OF SLURRY TRANSFER HOSE(PUR/MOIL/C-11/30/E-75/1958-M) 04-02-2017 27-02-2017 27-02-2017 27-02-2017 03:30 PM Active और देखें
79. PURCHASE OF PARKER SINGLE SOLENOID VALVE(PUR/MOIL/C-11/131/E-74/1956-M) 04-02-2017 22-02-2017 22-02-2017 22-02-2017 03:30 PM Active और देखें
80. PURCHASE OF SEAMLESS TUBE AND MS ERW BOILER TUBE(PUR/MOIL/C-11/20/E-77/1972-M) 04-02-2017 01-03-2017 01-03-2017 01-03-2017 03:30 PM Active और देखें
81. PURCHASE OF SEAMLESS TUBE AND MS ERW BOILER TUBE (PUR/MOIL/C-11/20/E-77/1972-M) 04-02-2017 31-03-2017 31-03-2017 31-03-2017 3:30 PM Active और देखें
82. Extension of Program stage at Durga Chowk at Chikla Mine(TE/CH/CIVIL/16-17/860 dated 23.01.2017) 01-02-2017 06-02-2017 06-02-2017 06-02-2017 03:30 PM Active और देखें
83. Drilling of Bore Hole 121/4 inch Diameter with 8 inch diameter UPVC casing for sand Stowing Balaghat Mine.(MOIL/16-17/ET/174) 01-02-2017 01-03-2017 01-03-2017 01-03-2017 03:30 PM Active और देखें
84. PURCHASE OF SPIRAL LINER(PUR/MOIL/C-11/135/E-71/1895-M) 31-01-2017 13-02-2017 13-02-2017 13-02-2017 03:30 PM Active और देखें
85. PURCHASE OF SPIRAL LINER ( PUR/MOIL/C-11/135/E-71/1895-M ) 31-01-2017 20-02-2017 20-02-2017 20-02-2017 3:30 pm Active और देखें
86. SCREEN FRAME WITH SCREEN PANEL FOR JIG(PUR/MOIL/C-11/130/WE-108 (MOIL/16-17/ET/169)) 31-01-2017 28-02-2017 28-02-2017 28-02-2017 03:30 PM Active और देखें
87. Repairing of Radiator of Dozer Make BEMl BD-155 of Tirodi Mine, MOIL LIMITED(HO/MECH/TRD/16-17/867 DT. 28.1.17) 30-01-2017 04-02-2017 04-02-2017 04-02-2017 04:00 PM Active और देखें
88. Erection of HT and LT Line Installation of power transformer for extension of load at old Satak Beldongri(Bel/Elcct./AGT/16-17/3000) 30-01-2017 09-02-2017 09-02-2017 09-02-2017 04:30 PM Active और देखें
89. Underground development at -30 feet level at Munsar Mine (MOIL/16-17/ET/170) 30-01-2017 23-02-2017 23-02-2017 23-02-2017 3:30 PM Active और देखें
90. Construction of Retaining Wall and Platform for Railway siding at Kandri Mine(Civil /HO/16-17/ KAN/85) 30-01-2017 01-03-2017 01-03-2017 01-03-2017 03:30 PM Active और देखें
91. Construction of Motor Garage at Munsar Mine(MOIL/16-17/ET/172) 30-01-2017 01-03-2017 01-03-2017 01-03-2017 03:30 PM Active और देखें
92. Construction of Precast Boundary wall around mine lease in Kaichi camp at Munsar Mine(MOIL/16-17/ET/173) 30-01-2017 01-03-2017 01-03-2017 01-03-2017 03:30 PM Active और देखें
93. HIRING OF 50 MT CAPACITY MOBILE CRANE WITH 360 DEGREE REVOLVING TELESCOPIC EXTENDED BOOM OF UNLOADING AND ASSEMBLING OF BH60M Dumper- 3 Nos AT DONGRI BUZURG MINE (A-II/CHK/DB/16-17/ 864 dtd 28.01.2017) 28-01-2017 30-01-2017 30-01-2017 30-01-2017 2:30 PM Active और देखें
94. RENOVATION OF OLD MINE MANAGER BUNGLOW TO CONVERT TO TRANSIT ROOM(TRD/CIVIL/A/2016-17/3069A DT 21.01.2017) 25-01-2017 31-01-2017 31-01-2017 31-01-2017 04:30 PM Active और देखें
95. Concrete lining of cross cut in new wide ore body at -200 L at Gumgaon Mine(Mining/Gum/16-17/3498 Date 23.01.2017) 25-01-2017 01-02-2017 01-02-2017 01-02-2017 04:30 PM Active और देखें
96. Washing, Picking and collection of material from waste/reject (crude) from west side of 6 B section at Tirodi Mine(Gr.II/GM(M)/CONT/WASH/66/TRD/2016-17/50) 25-01-2017 01-02-2017 01-02-2017 01-02-2017 03:30 PM Active और देखें
97. WEBSITE LIMITED TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF PRINTER RIBBON CARTRIDGES FOR TVS MSP-255 MARATHON PRINTER, EPSON-FX-2175 PRINTER, TVS MSP 430 PRINTER, LIPI 6605 LINE MATRIX(PUR/MOIL/C-1/203/E-73/1918-M Dt.25.01.2017) 25-01-2017 17-02-2017 17-02-2017 17-02-2017 03:30 PM Active और देखें
98. Pattern Making casting machining and dynamic Balacing of Pump spares for 75 HP Maxflow make Pump at 8th Level Under ground of Balaghat Mine(DGM/BGT/MECH/PUMP/16-17/7389) 24-01-2017 03-02-2017 03-02-2017 03-02-2017 04:30 PM Active और देखें
99. PURCHASE OF VIBRATOR ASSEMBLY (MAKE-MS TRF LIMITED, JAMSHEDPUR) - 1 SET. (AS PER ANNEXURE - A ENCLOSED).(PUR/MOIL/C-4/212/E-72/1913-M DT.24/01/2017) 24-01-2017 13-02-2017 13-02-2017 13-02-2017 03:30 PM Active और देखें
100. Designing supply fabrication installation and commissioning of Electronic Belt Weigher system for IMB Plant Balaghat Mine(DGM/BGT/MECH/IMBP/16-17/7394) 24-01-2017 14-02-2017 14-02-2017 14-02-2017 04:30 PM Active और देखें

निविदाएं अधिक जानकारी

Independent External Monitor

Finalised Tenders

MOU Between MOIL & TII

Integrity Pact

Contracts finalised on nomination basis

Details of Purchase Order issued by MATERIALS DEPARTMENT valuing Rs.30.00 Lakhs & Above


List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website)

(2024) वर्ष के निविदाएं देखें
(2023) वर्ष के निविदाएं देखें
(2022) वर्ष के निविदाएं देखें
(2021) वर्ष के निविदाएं देखें
(2020) वर्ष के निविदाएं देखें
(2019) वर्ष के निविदाएं देखें
(2018) वर्ष के निविदाएं देखें
(2017) वर्ष के निविदाएं देखें
(2016) वर्ष के निविदाएं देखें
(2015) वर्ष के निविदाएं देखें
(2014) वर्ष के निविदाएं देखें
(2013) वर्ष के निविदाएं देखें
(2012) वर्ष के निविदाएं देखें
(24) वर्ष के निविदाएं देखें
पूर्ण निविदा पुरालेख देखें
सभी मॉयल निविदाएं देखें