1. | PURCHASE OF TRACK ROLLER ASSEMBLY FOR EIMCO ELECON MADE SIDE DUMP LOADER MODEL 625CR, PART NO- 1027C050000005 (PUR/MOIL/BGT/SDL/18-19/73 dtd 09.05.2018) | 11-05-2018 | 11-05-2018 | 24-05-2018 | 24-05-2018 | 04:30 PM | Active | और देखें |
2. | Open e-Tender No. WE-09-ET-62 for purchase of PEARL COKE with Transportation (WE-09 e-tender No.MOIL/18-19/ET-62, Dt.11.05.18) | 11-05-2018 | 04-06-2018 | 04-06-2018 | 05-06-2018 | 03:30 PM | Active | और देखें |
3. | Purchase of industrial power heaters for cells of EMD Plant at Dongri Buzurg Mine. (ADGM/DB/EMD/ELECT/18-19/66) | 10-05-2018 | 16-05-2018 | 16-05-2018 | 16-05-2018 | 4:00 PM | Active | और देखें |
4. | Arc Flash Protective wear (PUR-MOIL-C-1-WE-25-ET-61) | 10-05-2018 | 11-06-2018 | 11-06-2018 | 12-06-2018 | 03:30 PM | Active | और देखें |
5. | Shifting of 3 phase, 3 wire HT OH line and 11KV outdoor substation at Dongri Buzurg Mine (MOIL/18-19/ET/32 ) | 10-05-2018 | 10-05-2018 | 08-06-2018 | 08-06-2018 | 03:30 PM | Active | और देखें |
6. | SUPPLY OF BLACK GITTI FOR CONCRETING AT CHIKLA MINE (TE-03 DT.08052018) | 09-05-2018 | 09-05-2018 | 15-05-2018 | 15-05-2018 | 04:30 PM | Active | और देखें |
7. | Purchase of Geological Modelling, Mine Planning and Design Software for Four Modules i.e. Core, Tools, Geology and Surveying (WE-3 Dt.09/05/2018 (e-Tender No.MOIL/18-19/ET/60)) | 09-05-2018 | 12-06-2018 | 12-06-2018 | 13-06-2018 | 03:30 PM | Active | और देखें |
8. | Design, Manufacture and Supply Plummer Block of Pinion shaft of Production Shaft winder of Balaghat Mine (BGT/MECH/PS/18-19/ 989) | 09-05-2018 | 24-05-2018 | 24-05-2018 | 24-05-2018 | 4:00 PM | Active | और देखें |
9. | Open e-Tender No. WE-24-ET-56 for Purchase of copper bus bar, aluminium bus bar, Z bar and various type copper-aluminium bus with other electrical accessories for new Cell-Bay section at EMD PLANT, DONGRI BUZURG MINE (WE-24 e-tender No.MOIL/18-19/ET-56, D | 09-05-2018 | 09-05-2018 | 30-05-2018 | 31-05-2018 | 03:30 PM | Active | और देखें |
10. | TENDER ENQUIRY FOR ANNUAL MAINTENANCE CONTRACT OF COMPUTER, LAPTOPS, PRINTER, UPS AND NETWORKS (SYS/HW MAINTENANCE/2018-19/2) | 09-05-2018 | 30-05-2018 | 30-05-2018 | 30-05-2018 | 3:00 PM | Active | और देखें |
11. | Purchase of 550 H.P., 1000 RPM, Laminated Yoke, Shunt Wound, D.C.Motor - 2 Nos. for Double Drum Winder of Balaghat Mine (WE-23 (MOIL/18-19/ET/58) DT.09/05/2018) | 09-05-2018 | 09-05-2018 | 06-06-2018 | 07-06-2018 | 03:30 PM | Active | और देखें |
12. | Purchase of Lead Steam Coil - 10 Nos. (1 LOT) for EMD Plant, Dongri Buzurg Mine (WE-18 (MOIL/18-19/ET/59) DT.09/05/2018) | 09-05-2018 | 14-06-2018 | 14-06-2018 | 15-06-2018 | 03:30 PM | Active | और देखें |
13. | Purchase of Electrically Operated Travelling Crane - 1 No. (1 LOT) for EMD Plant, Dongri Buzurg Mine (WE-17 (MOIL/18-19/ET/57) DT.09/05/2018) | 09-05-2018 | 09-05-2018 | 05-06-2018 | 06-06-2018 | 03:30 PM | Active | और देखें |
14. | Limited tender for Removal of spillage from the bottom of conveyor belt of 141/2 level Loading station Production Shaft (BGT/ Mech /spillage/18-19/ 456) | 08-05-2018 | 16-05-2018 | 16-05-2018 | 16-05-2018 | 5:50 pm | Active | और देखें |
15. | PURCHASE OF SULPHATE TRANSFER PUMP 1 NO. AND CONDENSATE PUMP WITH MOTOR AND BASE FRAME 2 NOS. FOR EMD PLANT DONGRI BUZURG MINE (PUR/MOIL/C-4/78/E-8 /155 -M Dt.07.05.2018) | 08-05-2018 | 08-05-2018 | 21-05-2018 | 22-05-2018 | 03:30 PM | Active | और देखें |
16. | Housekeeping inside the house premises of IMB Plant at Balaghat Mine (MOIL/18-19/ET/33) | 08-05-2018 | 22-05-2018 | 22-05-2018 | 22-05-2018 | 03:30 PM | Active | और देखें |
17. | Construction of Stone Pitching Parapet Wall around Mine Dump Area behind Siding Region, Balaghat Mine. (Agent Sr DGM/Civil/BGT/18-19/981 Date 07.05.18) | 08-05-2018 | 17-05-2018 | 17-05-2018 | 17-05-2018 | 04:30 PM | Active | और देखें |
18. | PURCHASE OF CONDENSATE TANK WITH ACCESSORIES - 1 NO. FOR EMD PLANT, DONGRI BUZURG MINE (PUR/MOIL/C-4/315 /E-7 /156-M) | 08-05-2018 | 21-05-2018 | 21-05-2018 | 21-05-2018 | 03:30 PM | Active | और देखें |
19. | Purchase of MS Neoprene Rubber Lined Cell Feed Tank with Accessories - 1 No.(1 LOT) for EMD Plant, Dongri Buzurg Mine (WE-20(MOIL/18-19/ET/52) DT.08/05/2018) | 08-05-2018 | 04-06-2018 | 05-06-2018 | 05-06-2018 | 03:30 PM | Active | और देखें |
20. | Purchase of Polypropelene Pad - 80 Nos.(1 LOT) for EMD Plant, Dongri Buzurg Mine WE-22(MOIL/18-19/ET/55) DT.08/05/2018 | 08-05-2018 | 31-05-2018 | 01-06-2018 | 01-06-2018 | 03:30 PM | Active | और देखें |
21. | Purchase of Mild Steel Square Bar Cladded with Copper Sheet - 700 Nos.(1 LOT) for EMD Plant, Dongri Buzurg Mine (WE-21(MOIL/18-19/ET/54) DT.08/05/2018) | 08-05-2018 | 31-05-2018 | 01-06-2018 | 01-06-2018 | 03:30 PM | Active | और देखें |
22. | Outsourcing of Industrial Pumping Operation in Underground Vertical Shaft of Munsar Mine (MOIL/18-19/ET/30 ) | 08-05-2018 | 08-06-2018 | 08-06-2018 | 08-06-2018 | 3:30 PM | Active | और देखें |
23. | Washing picking and collection of material from waste reject crude from West side of 6 B at Tirodi Mine (MOIL/18-19/ET/34) | 08-05-2018 | 08-06-2018 | 08-06-2018 | 08-06-2018 | 03:30 PM | Active | और देखें |
24. | Conveyor Belt (PUR-MOIL-C-12-20-WE-01) | 08-05-2018 | 07-06-2018 | 07-06-2018 | 08-06-2018 | 03:30 PM | Active | और देखें |
25. | Outsourcing of Industrial Pumping Operation at UG level and OC of Kandri Mine (MOIL/18-19/ET/35 ) | 08-05-2018 | 08-06-2018 | 08-06-2018 | 08-06-2018 | 03:30 PM | Active | और देखें |
26. | Underground development work at 450 Level at Kandri Mine (MOIL/18-19/ET/36) | 08-05-2018 | 08-06-2018 | 08-06-2018 | 08-06-2018 | 03:30 PM | Active | और देखें |
27. | Underground Sump cleaning of Ukwa Mine i Vertical shaft UG section ii Ch.50 UG Section iii 9500 section and iv Ch.10800 (MOIL/18-19/ET/37) | 08-05-2018 | 08-06-2018 | 08-06-2018 | 08-06-2018 | 03:30 PM | Active | और देखें |
28. | Purchase of Spent Transfer Pump, Model 40 /13QF (Mech.Seal Type) MOC R-55 - 2 Nos. (1 LOT) for EMD Plant, Dongri Buzurg Mine (WE-19(MOIL/18-19/ET/51) DT.08/05/2018) | 08-05-2018 | 07-06-2018 | 07-06-2018 | 08-06-2018 | 03:30 PM | Active | और देखें |
29. | WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR DRUM ASSEMBLY OF LHD AND SDL MACHINES-MAKE EIMCO ELECON (PUR/MOIL/C-5/27/E-05/138-M Dt. 07/05/2018) | 07-05-2018 | 13-06-2018 | 13-06-2018 | 13-06-2018 | 03:30 PM | Active | और देखें |
30. | PURCHASE OF STRAIN BAR FOR CHIKLA MINE (TE-641 DT.07052018) | 07-05-2018 | 22-05-2018 | 22-05-2018 | 22-05-2018 | 04:30 PM | Active | और देखें |
31. | Maintenance of Gardens at Ukwa Mine. (16/Civil/UM/18-19/279) | 07-05-2018 | 07-05-2018 | 17-05-2018 | 17-05-2018 | 4:30 pm | Active | और देखें |
32. | WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR SAYAJI JAW CRUSHER (PUR/MOIL/C-5/30/E-04/137-M Dt. 07/05/2018) | 07-05-2018 | 06-06-2018 | 06-06-2018 | 06-06-2018 | 03:30 PM | Active | और देखें |
33. | Laying of 3C x 95Sqmm Cable from Main Vertical Shaft Subsation to 2nd level undergound for feeding supply to LHD(ELECT/MUN/ADGM/18-19/78) | 05-05-2018 | 12-05-2018 | 12-05-2018 | 12-05-2018 | 03:30 PM | Active | और देखें |
34. | Purchase of Drilling Accessories for Electro Hydraulic Crawler Drill Machines at Chikla and Gumgaon Mine.(WE-01 e-tender No.MOIL/18-19/ET-46, Dt.04.05.18) | 04-05-2018 | 12-06-2018 | 12-06-2018 | 13-06-2018 | 03:30 PM | Active | और देखें |
35. | Titanium Anode Plates - 256 Nos. (1 Lot) for EMD Plant Dongri Buzurg Mine (Only Through e-procurement)(WE-5 Dt.04/05/2018 (MOIL/18-19/ET/47)) | 04-05-2018 | 28-05-2018 | 28-05-2018 | 29-05-2018 | 03:30 PM | Active | और देखें |
36. | WEBSITE TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPIRAL LINER -200 Nos.(PUR/MOIL/C-11/135/E-03/119-M Dt. 03-05-2018) | 04-05-2018 | 30-05-2018 | 30-05-2018 | 30-05-2018 | 03:30 PM | Active | और देखें |
37. | WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR MATHER AND PLATT WATER PUMP.(PUR/MOIL/C-5/28/E-01/102-M Dt. 04/05/2018 | 04-05-2018 | 30-05-2018 | 30-05-2018 | 30-05-2018 | 03:30 PM | Active | और देखें |
38. | Purchase of Manwinding Steel Wire Rope - 36 MM for Balaghat Mine - 1950 Mtr(WE-2 DT.03.05.2018 (e-Tender No. MOIL/18-19/ET/43) | 03-05-2018 | 28-05-2018 | 28-05-2018 | 29-05-2018 | 03:30 PM | Active | और देखें |
39. | Purchase of Graphite Cathode Plates - 700 Nos. for EMD Plant, Dongri Buzurg Mine (1 Lot) (Only Through e-procurement)(WE-8 Dt.02/05/2018 (MOIL/18-19/ET/38)) | 02-05-2018 | 23-05-2018 | 23-05-2018 | 24-05-2018 | 03:30 PM | Active | और देखें |
40. | Purchase of Zirconium Coil - 18 Nos. (1 Lot) for EMD Plant, Dongri Buzurg Mine (Only Through e-procurement)(WE-7 Dt.02/05/2018 (MOIL/18-19/ET/41)) | 02-05-2018 | 24-05-2018 | 24-05-2018 | 25-05-2018 | 03:30 PM | Active | और देखें |
41. | Purchase of Lead Cathode Plates - 320 Nos. (1 Lot) for EMD Plant, Dongri Buzurg Mine (Only Through e-procurement)( WE-6 Dt.02/05/2018 (MOIL/18-19/ET/40)) | 02-05-2018 | 24-05-2018 | 24-05-2018 | 25-05-2018 | 03:30 PM | Active | और देखें |
42. | Screening of siding debridge to produce 420 MT ORE on 590 MT Fines at Chikla Mine(TE/CH/agent/ch/mine/18-19/52) | 01-05-2018 | 15-05-2018 | 15-05-2018 | 15-05-2018 | 04:00 PM | Active | और देखें |
43. | Providing and fixing of mosquito net door and vent to b and c type quarter of Munsar mine(MUN/CIVIL/18-19/16 DT. 30.04.2018) | 01-05-2018 | 11-05-2018 | 11-05-2018 | 11-05-2018 | 04:30 pm | Active | और देखें |
44. | Providing and supply of 5core X 25Sqmm Trailing cable - 100Meters(GM/Elect/TE/18-19/325,Dated - 30.04.2018) | 01-05-2018 | 21-05-2018 | 21-05-2018 | 21-05-2018 | 03:30 PM | Active | और देखें |
45. | Maintenance and operation of water supply scheme at Ukwa Mine.(16/Civil/UM/18-19/245) | 30-04-2018 | 15-05-2018 | 15-05-2018 | 15-05-2018 | 04:30 pm | Active | और देखें |
46. | Maintenance and cleaning of New Administrative Building at munsar mine(MUN/MINING/18-19/116) | 29-04-2018 | 02-05-2018 | 02-05-2018 | 02-05-2018 | 03:30 PM | Active | और देखें |
47. | Removing of loose Waste rock at 1850 level Ukwa Mine(16/Mining/UM/18-19/224) | 26-04-2018 | 10-05-2018 | 10-05-2018 | 10-05-2018 | 04:30 PM | Active | और देखें |
48. | Trench Cutting of OCF stacks at Munsar Mine(MUN/MINING/18-19/115) | 24-04-2018 | 02-05-2018 | 02-05-2018 | 02-05-2018 | 03:30 PM | Active | और देखें |
49. | Construction of New Building for Syndicate Bank Bharweli Branch at Balaghat Mine.( MOIL/17-18/ET/472) | 20-04-2018 | 21-05-2018 | 21-05-2018 | 21-05-2018 | 03:30 PM | Active | और देखें |
50. | EXTRA EXCAVATION AT -370L FOR RCC SUPPORT AT CHIKLA MINE(PUR/MOIL/CH/18-19/01) | 19-04-2018 | 26-04-2018 | 26-04-2018 | 26-04-2018 | 03:30 PM | Active | और देखें |
51. | Repairing and servicing of Actuators of Butterfly Valve of I.M.B Plant at Balaghat Mine(AGT/BGT/MECH/IMB/18-19/40 dtd 17/04/2018) | 19-04-2018 | 30-04-2018 | 30-04-2018 | 30-04-2018 | 04:30 PM | Active | और देखें |
52. | Loading and Unloading of steel section, Cement Bags, Timbers, Lubricants and other spare as well as store materials with stacking at Ukwa Mine stores(UK/Mech/17-18/2656 Dated 15/03/2018) | 19-04-2018 | 30-04-2018 | 30-04-2018 | 30-04-2018 | 04:30 PM | Active | और देखें |
53. | Cleaning of Surface Drain at Ukwa Mine(16/Civil/UM/18-19/164) | 19-04-2018 | 02-05-2018 | 02-05-2018 | 02-05-2018 | 04:30 PM | Active | और देखें |
54. | Retiling and roof repair work of camp quarter at Ukwa Mine(16/Civil/UM/18-19/165) | 19-04-2018 | 02-05-2018 | 02-05-2018 | 02-05-2018 | 04:30 PM | Active | और देखें |
55. | Repairs to roof slab of camp quarters at Ukwa Mine(16/Civil/UM/18-19/166) | 19-04-2018 | 02-05-2018 | 02-05-2018 | 02-05-2018 | 04:30 PM | Active | और देखें |
56. | Cleaning Desilting and removal of garbage from Dug Open Well through machine manually at Kandri Mine(MOIL/17-18/ET/493) | 18-04-2018 | 18-05-2018 | 18-05-2018 | 18-05-2018 | 03:30 PM | Active | और देखें |
57. | Providing and fixing of Paving Block Flooring at front and back side and construction of shed at backside of workshop at Gumgaon Mine(MOIL/17-18/ET/307) | 18-04-2018 | 18-05-2018 | 18-05-2018 | 18-05-2018 | 03:30 PM | Active | और देखें |
58. | Annual Repair to Camp Quarters at Beldongri Mine.(MOIL/17-18/ET/293) | 18-04-2018 | 18-05-2018 | 18-05-2018 | 18-05-2018 | 03:30 PM | Active | और देखें |
59. | Picking and collection of UKL 448 25 PERCENT from F W dumps from Ch.9500 to ch.12000 at Ukwa Mine(MOIL/18-19/ET/23) | 17-04-2018 | 22-05-2018 | 22-05-2018 | 22-05-2018 | 03:30 PM | Active | और देखें |
60. | Trench cutting in ore stacks including sample bags carrying at Ukwa Mine(MOIL/18-19/ET/21) | 17-04-2018 | 17-05-2018 | 17-05-2018 | 17-05-2018 | 03:30 PM | Active | और देखें |
61. | Picking and collection of UKL 448 25 PERCENT from F W dumps from Ch.4300 to ch.6800 at Ukwa Mine(MOIL/18-19/ET/22) | 17-04-2018 | 17-05-2018 | 17-05-2018 | 17-05-2018 | 03:30 PM | Active | और देखें |
62. | Pushing and unloading of ROM and rock tubs in underground at Munsar Mine(MOIL/18-19/ET/24) | 17-04-2018 | 17-05-2018 | 17-05-2018 | 17-05-2018 | 03:30 PM | Active | और देखें |
63. | Furniture and Interior Works for Civil Department 2nd Floor MOIL Bhawan Nagpur.(MOIL/18-19/ET/ 25) | 17-04-2018 | 08-05-2018 | 08-05-2018 | 08-05-2018 | 03:30 PM | Active | और देखें |
64. | Picking and collection of material from Magazine Dump South side at Chikla Mine(MOIL/18-19/ET/20) | 16-04-2018 | 16-05-2018 | 16-05-2018 | 16-05-2018 | 03:30 PM | Active | और देखें |
65. | Loading of Manganese Ore into trucks for despatches of ore at Ukwa Mine(MOIL/18-19/ET/18) | 16-04-2018 | 16-05-2018 | 16-05-2018 | 16-05-2018 | 03:30 PM | Active | और देखें |
66. | Cleaning of ROM recovered from Pit No.2 at Sitapatore Mine(MOIL/18-19/ET/19) | 16-04-2018 | 16-05-2018 | 16-05-2018 | 16-05-2018 | 03:30 PM | Active | और देखें |
67. | Providing and fixing of Paving Blocks in park near Old Admin Building at Dongri Buzurg Mine(MOIL/18-19/ET/12) | 16-04-2018 | 16-05-2018 | 16-05-2018 | 16-05-2018 | 03:30 PM | Active | और देखें |
68. | Renovation of Sabha Mandap in Syndicate Camp at Dongri Buzurg Mine(MOIL/17-18/ET/441) | 16-04-2018 | 16-05-2018 | 16-05-2018 | 16-05-2018 | 03:30 PM | Active | और देखें |
69. | Construction of Store Room for used oil at Dongri Buzurg Mine(MOIL/17-18/ET/286) | 16-04-2018 | 16-05-2018 | 16-05-2018 | 16-05-2018 | 03:30 PM | Active | और देखें |
70. | Purchase of Sand for Sand Stowing Plant at Balaghat Mine(MOIL/18-19/ET/17) | 16-04-2018 | 07-05-2018 | 07-05-2018 | 07-05-2018 | 03:30 PM | Active | और देखें |
71. | Annual Repair to Camp Quarters at Ukwa Mine.(MOIL/17-18/ET/310) | 16-04-2018 | 23-05-2018 | 23-05-2018 | 23-05-2018 | 03:30 PM | Active | और देखें |
72. | Repairing of OTR Tyres (18.00 X 25 and 24.00 X 35) for Dumpers of 35 T and 60 T at Dongri Buzurg Mine.(MOIL/18-19/ET/13) | 14-04-2018 | 01-05-2018 | 01-05-2018 | 01-05-2018 | 03:30 PM | Active | और देखें |
73. | Outsourcing of Crushing and Screening Plant Operation for Gumgaon Mine for 12 Months(MOIL/18-19/ET/14) | 14-04-2018 | 04-05-2018 | 04-05-2018 | 04-05-2018 | 03:30 PM | Active | और देखें |
74. | Construction/Extension of H.T Panel Room at 33kV Main Substation of Ukwa Mine(MOIL/17-18/ET/491) | 13-04-2018 | 14-05-2018 | 14-05-2018 | 14-05-2018 | 03:30 PM | Active | और देखें |
75. | Construction of vehicle parking shed at new workshop near Vertical Shaft at Ukwa Mine.(MOIL/17-18/ET/490) | 13-04-2018 | 14-05-2018 | 14-05-2018 | 14-05-2018 | 03:30 PM | Active | और देखें |
76. | Providing and fixing of Paver Block Flooring for infront of Winder House And Cap Lamp Room near Vertical Shaft at Ukwa Mine(MOIL/17-18/ET/309) | 13-04-2018 | 14-05-2018 | 14-05-2018 | 14-05-2018 | 03:30 PM | Active | और देखें |
77. | Operation and Maintenance works of Electrical Installations of Establishment at Corporate Office, Nagpur(MOIL/18-19/ET/16) | 13-04-2018 | 27-04-2018 | 27-04-2018 | 27-04-2018 | 03:30 PM | Active | और देखें |
78. | Construction of Compound Wall at new workshop premises at Ukwa Mine(MOIL/17-18/ET/487) | 11-04-2018 | 10-05-2018 | 10-05-2018 | 10-05-2018 | 03:30 PM | Active | और देखें |
79. | Notice Inviting Tender for Drilling of Borehole for Sand Stowing Plant and underground works(Surface to First Level) at near Vertical Shaft Ukwa Mine( MOIL/17-18/ET/486) | 11-04-2018 | 10-05-2018 | 10-05-2018 | 10-05-2018 | 03:30 PM | Active | और देखें |
80. | Construction of Sand Stowing Plant Bunker at First Vertical Shaft Ukwa Mine(MOIL/17-18/ET/489) | 11-04-2018 | 10-05-2018 | 10-05-2018 | 10-05-2018 | 03:30 PM | Active | और देखें |
81. | Construction of new sample room near Mine Store at Ukwa Mine(MOIL/17-18/ET/492) | 11-04-2018 | 10-05-2018 | 10-05-2018 | 10-05-2018 | 03:30 PM | Active | और देखें |
82. | Providing and laying epoxy flooring to Store Building at Gumgaon Mine(MOIL/17-18/ET/283) | 11-04-2018 | 10-05-2018 | 10-05-2018 | 10-05-2018 | 03:30 PM | Active | और देखें |
83. | Annual Plumbing and Sanitary items for Officers and Staff Quarters at Balaghat( Civil/BGT/T.E./2018-19/101) | 06-04-2018 | 12-04-2018 | 12-04-2018 | 12-04-2018 | 04:30 PM | Active | और देखें |
84. | Repairing of approach stone Pitching stair from 6 th Level Pit Top up to Production Shaft Balaghat Mine.(Civil/BGT/T.E./2018-19/99) | 06-04-2018 | 16-04-2018 | 16-04-2018 | 16-04-2018 | 04:30 PM | Active | और देखें |
85. | Cleaning of Inner sides of centralized Air Cooling Duct by robot and sterilization by Ozone generator at MOIL Bhawan, Nagpur.(MOIL/17-18/ET/495) | 06-04-2018 | 23-04-2018 | 23-04-2018 | 23-04-2018 | 03:30 PM | Active | और देखें |
86. | PURCHASE OF PULMONARY FUNCTION TESTS MACHINES -3 NOS(PUR-MOIL-C-10-35-E-85 dt.5-4-2018) | 05-04-2018 | 20-04-2018 | 20-04-2018 | 20-04-2018 | 03:30 PM | Active | और देखें |
87. | Providing, Supplying, installation and commissioning of DC drive with PLC system for production shaft winder at Balaghat Mine for Enhancement of Skip hoisting capacity(MOIL/17-18/ET/465) | 04-04-2018 | 16-04-2018 | 16-04-2018 | 16-04-2018 | 03:30 PM | Active | और देखें |
88. | RECASTING OF 6 NOS. CONTACT CLAMP OF FERRO MANGANESE PLANT(TE/MOIL/BGT/FMP/ELECT/18-19/08 Date 03.04.18) | 04-04-2018 | 07-05-2018 | 07-05-2018 | 07-05-2018 | 04:30 PM | Active | और देखें |
89. | ANNUAL OPERATION AND MAINTENANCE CONTRACT OF HEMM FOR THE PERIOD OF TWO YEARS AT DONGRI BUZURG MINE(MOIL/17-18/ET/484) | 03-04-2018 | 18-04-2018 | 18-04-2018 | 18-04-2018 | 03:30 PM | Active | और देखें |
90. | Providing Furniture and Interior works for proposed chamber of Director (H.R) on first floor of MOIL Bhawan Nagpur.(MOIL/17-18/ET/ 497) | 29-03-2018 | 10-04-2018 | 10-04-2018 | 10-04-2018 | 03:30 PM | Active | और देखें |
91. | Creation of Facilities under R and D for Production of Manganese Dioxide at Dongri Buzurg Mine(MOIL/18-19/ET/15) | 29-03-2018 | 17-04-2018 | 17-04-2018 | 17-04-2018 | 03:30 PM | Active | और देखें |
92. | TENDER ENQUIRY IN SINGLE BID SYSTEM FOR PURCHASE OF STAIN BAR FOR CHIKLA MINE AS PER ANNEXURE A ENCLOSED(TE-641 DT.27032018) | 27-03-2018 | 10-04-2018 | 10-04-2018 | 10-04-2018 | 04:30 PM | Active | और देखें |
93. | TENDER ENQUIRY IN SINGLE BID SYSTEM FOR PURCHASE OF STRATA MONITORING INSTRUMENT MPBX FOR CHIKLA MINE AS PER ANNEXURE A ENCLOSED(TE-640 DT.27032018) | 27-03-2018 | 10-04-2018 | 10-04-2018 | 10-04-2018 | 04:30 PM | Active | और देखें |
94. | WEBSITE PROPRIETARY TENDER ENQUIRY IN SINGLE BID SYSTEM FOR PURCHASE OF SPARES FOR KIRLOSKAR MAKE PUMP(PUR/MOIL/C-11/126/E-81/1309-M Dt. 27-03-2018) | 27-03-2018 | 18-04-2018 | 18-04-2018 | 18-04-2018 | 03:30 PM | Active | और देखें |
95. | WEBSITE TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF CONTACT SHOE -1 SET(PUR/MOIL/C-11/144/E-80/1291-M Dt. 27-03-2018) | 27-03-2018 | 27-04-2018 | 27-04-2018 | 27-04-2018 | 03:30 PM | Active | और देखें |
96. | Picking and collection of material from contaminated low grade ROM near Western side of Fagni Dump at Dongri Buzurg Mine(MOIL/18-19/ET/10) | 27-03-2018 | 27-04-2018 | 27-04-2018 | 27-04-2018 | 03:30 PM | Active | और देखें |
97. | Underground horizontal and vertical development at -200 ft L and -300 ft L at Gumgaon Mine(MOIL/18-19/ET/9) | 27-03-2018 | 27-04-2018 | 27-04-2018 | 27-04-2018 | 03:30 PM | Active | और देखें |
98. | Application of New Austrian tunneling method and Norwegian method of tunneling system for underground drift in Munsar Mine of MOIL limited under RandD with SRCoEM Nagpur(MUN/CIVIL/17-18/89 DT 24.03.2018) | 24-03-2018 | 31-03-2018 | 31-03-2018 | 31-03-2018 | 04:30 PM | Active | और देखें |
99. | Underground development of ore drive at 13.5th Level North Section at Balaghat Mine(MOIL/18-19/ET/05) | 23-03-2018 | 23-04-2018 | 23-04-2018 | 23-04-2018 | 03:30 PM | Active | और देखें |
100. | Underground development at 12th Level (South Section) at Balaghat Mine( MOIL/18-19/ET/7) | 23-03-2018 | 23-04-2018 | 23-04-2018 | 23-04-2018 | 03:30 PM | Active | और देखें |
निविदाएं अधिक जानकारी |
---|
Details of Purchase Order issued by MATERIALS DEPARTMENT valuing Rs.30.00 Lakhs & Above
Details of Purchase Order issued by MATERIALS DEPARTMENT valuing Rs.5.00 Lakhs & Above List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website) |
(2027) वर्ष के निविदाएं देखें |
(2025) वर्ष के निविदाएं देखें |
(2024) वर्ष के निविदाएं देखें |
(2023) वर्ष के निविदाएं देखें |
(2022) वर्ष के निविदाएं देखें |
(2021) वर्ष के निविदाएं देखें |
(2020) वर्ष के निविदाएं देखें |
(2019) वर्ष के निविदाएं देखें |
(2018) वर्ष के निविदाएं देखें |
(2017) वर्ष के निविदाएं देखें |
(2016) वर्ष के निविदाएं देखें |
(2015) वर्ष के निविदाएं देखें |
(2014) वर्ष के निविदाएं देखें |
(2013) वर्ष के निविदाएं देखें |
(2012) वर्ष के निविदाएं देखें |
(24) वर्ष के निविदाएं देखें |
पूर्ण निविदा पुरालेख देखें |
सभी मॉयल निविदाएं देखें |