Tender Archive
S.No. | Title | Issue Start Date | Issue Last Date | Submission Last Date | Opening Date | Opening Time | Status | View |
---|---|---|---|---|---|---|---|---|
1. | e-procurement of A-4 SIZE PAPER (BILT /J.K. /T.N.P.L. MAKE). (WE-119 e-tender No.MOIL/16-17/ET-193, Dt.23.02.17) | 23-02-2017 | 18-04-2017 | 18-04-2017 | 18-04-2017 | 3:30 PM | Active | View |
2. | Construction of temporary Substation for installation L.T. and H.T. Switchgear along with Transformer Room for IInd Vertical Shaft at Ukwa Mine(A and Sr DGM(M)/Civil/UM/16-17/3288) | 22-02-2017 | 04-03-2017 | 04-03-2017 | 04-03-2017 | 04:30 PM | Active | View |
3. | PURCHASE OF MANWINDING STEEL WIRE ROPE(WE-118 Dt.22/02/2017(eTender no.MOIL/16-17/ET/194)) | 22-02-2017 | 22-03-2017 | 22-03-2017 | 22-03-2017 | 03:30 PM | Active | View |
4. | Jaw Plates for Sayaji Make Jaw Crushers(PUR/MOIL/C-5/30/WE- 101 (MOIL/16-17/ET/192)) | 22-02-2017 | 24-03-2017 | 24-03-2017 | 24-03-2017 | 03:30 PM | Active | View |
5. | Picking and collection of material from South side of Siding waste dump at Tirodi Mine(Gr.II/GM(M)/CONT/R-DUMP/73/TRD/2016-17/53) | 21-02-2017 | 28-02-2017 | 28-02-2017 | 28-02-2017 | 03:30 PM | Active | View |
6. | Supply of black gitti in underground concreeting at Kandri Mine(GM(M)-III/CONT/Gitti/KAN/2016-17/52) | 21-02-2017 | 28-02-2017 | 28-02-2017 | 28-02-2017 | 03:30 PM | Active | View |
7. | Picking and collection of material from South staff Quarter waste Dump at Tirodi Mine(Gr.II/GM(M)/CONT/R-DUMP/74/2016-17/54) | 21-02-2017 | 28-02-2017 | 28-02-2017 | 28-02-2017 | 03:30 PM | Active | View |
8. | Maintenance of Garden in Mine office and Managers Bungalow at Beldongri Mine.(Bel/Civil/AGT/16-17/3166) | 20-02-2017 | 28-02-2017 | 28-02-2017 | 28-02-2017 | 04:30 PM | Active | View |
9. | Fabrication of Bucket Pins and Yokes, collar and link bushings of BE 700 no.2 and 3 Hydraulic Excavator Operating at Dongri Buzurg Mine(AII/CHK/DB/MECH/16-17/931 dtd 17.02.2017) | 20-02-2017 | 28-02-2017 | 28-02-2017 | 28-02-2017 | 04:30 PM | Active | View |
10. | Obtaining Environment Clearance from District Environment Impact Assessment Authority Balaghat for sand query lease at KankiTah-Lalbarra, Dist. Balaghat over an area of 4.413 Ha. as per scope of work mentioned in NIT(SDGM(M)/SE/ KC-KANKI/ 16-17/ 4 dt.18/0 | 20-02-2017 | 02-03-2017 | 02-03-2017 | 02-03-2017 | 03:00 PM | Active | View |
11. | ELECTRONIC TOTAL STATION WITH ACCESSORIES FOR SURVEYING of MINES WITH COMPREHENSIVE AMC - 7 SETS. (AS PER ANNEXURE - C ENCLOSED) (Only Through e-procurement)(WE-112 DT.20/02/2017, eTENDER NO.MOIL/16-17/ET/191) | 20-02-2017 | 21-03-2017 | 21-03-2017 | 21-03-2017 | 03:30 PM | Active | View |
12. | PICKING AND COLLECTION 20PERCENT MN SM GR-TDL469 FROM NORTH SIDE OF SIDDHA BABA DUMP AT TIRODI MINE(TRD/MINE/HO/2016-17/3414, DT.18.02.2017) | 18-02-2017 | 25-02-2017 | 25-02-2017 | 25-02-2017 | 06:55 PM | Active | View |
13. | PICKING AND COLLECTION OF 20 PERCENTAGE MN SM GRADE TDL-469 FROM SOUTH SIDING DUMP AT TIRODI MINE(TRD/MINE/HO/2016-17/3415, DT.18.02.2017) | 18-02-2017 | 25-02-2017 | 25-02-2017 | 25-02-2017 | 06:00 PM | Active | View |
14. | Picking and collection of material from waste dumps at Sitapatore mine()Gr.II/GM(M)/CONT/R-DUMP/71/SITA/2016-17/52 | 17-02-2017 | 27-02-2017 | 27-02-2017 | 27-02-2017 | 03:30 PM | Active | View |
15. | Dismantling of old quarter of Balapur Camp and baboo line .(Agent/Civil/DB/2016-17/909) | 17-02-2017 | 22-02-2017 | 22-02-2017 | 22-02-2017 | 04:30 PM | Active | View |
16. | Procurement of miscellaneous electrical item For EMD Plant at Dongri Buzurg Mine.(DB/EMD/ELECT/16-17/916) | 17-02-2017 | 23-02-2017 | 23-02-2017 | 23-02-2017 | 04:30 PM | Active | View |
17. | CLeaning of surplus underground ROM at Munsar Mine(GM(M)-III/CONT/52/ROM/MUN/2016-17/51) | 17-02-2017 | 23-02-2017 | 23-02-2017 | 23-02-2017 | 03:30 PM | Active | View |
18. | LT APFC PANELS FOR VARIOUS MINES - 5 NOS. (AS PER ANNEXURE - C ENCLOSED) (Only Through e-procurement)(WE-117 DT.17/02/2017, eTENDER NO.MOIL/16-17/ET/190) | 17-02-2017 | 15-03-2017 | 15-03-2017 | 15-03-2017 | 03:30 PM | Active | View |
19. | Purchase of Cross Bit 57MM Dia suitable for Cable Bolting Machine(PUR/MOIL/C-5/12/WE-54 (MOIL/16-17/ET/189)) | 17-02-2017 | 15-03-2017 | 15-03-2017 | 15-03-2017 | 03:30 PM | Active | View |
20. | Annual repairs and maintenance contract for domestic electrical installation of residential and non residential building of Balaghat Mine(BGT/TE/Elect/16-17/7853) | 17-02-2017 | 15-03-2017 | 15-03-2017 | 15-03-2017 | 04:30 PM | Active | View |
21. | e-procurement for Printing of Computer Stationery- 4 Items(WE-116 e-tender No.MOIL/16-17/ET-188, Dt.17.02.17) | 17-02-2017 | 06-04-2017 | 06-04-2017 | 06-04-2017 | 03:30 PM | Active | View |
22. | REDUCTION GEAR BOX FOR BELT CONVEYOR APPLICATION - 1 NO. (AS PER ANNEXURE - C ENCLOSED) (Only Through e-procurement)(WE-115 DT.16/02/2017, eTENDER NO.MOIL/16-17/ET/187) | 16-02-2017 | 15-03-2017 | 15-03-2017 | 15-03-2017 | 03:30 PM | Active | View |
23. | Construction of compound wall at staff quarter at Upper camp near Hospital and at Officer Colony at Chikla Mine(MOIL/16-17/ET/176) | 15-02-2017 | 14-03-2017 | 14-03-2017 | 14-03-2017 | 03:30 PM | Active | View |
24. | Construction of storm water drain at Chikla B Section and construction of road side drain from Siding Office to Chika B at Chikla Mine(MOIL/16-17/ET/180) | 15-02-2017 | 14-03-2017 | 14-03-2017 | 14-03-2017 | 03:30 PM | Active | View |
25. | Water Proofing Works at Beldongri Mine(MOIL/16-17/ET/181) | 15-02-2017 | 14-03-2017 | 14-03-2017 | 14-03-2017 | 03:30 PM | Active | View |
26. | Extension of Administrative Building at Chikla Mine(MOIL/16-17/ET/175) | 15-02-2017 | 14-03-2017 | 14-03-2017 | 14-03-2017 | 03:30 PM | Active | View |
27. | Drilling of 02 Nos of Bore Holes for Sand stowing plant at Beldongri Mine(Civil /HO/16-17 /BEL/88 Dated 14/02/2017) | 15-02-2017 | 15-03-2017 | 15-03-2017 | 15-03-2017 | 03:30 PM | Active | View |
28. | HOT CRANE, 5 MT. - 1 NO. FOR WORKSHOP OF BALAGHAT MINE (AS PER ANNEXURE - C ENCLOSED) (Only Through e-procurement)(WE-114 DT.14/02/2017, eTENDER NO.MOIL/16-17/ET/186) | 14-02-2017 | 08-03-2017 | 08-03-2017 | 08-03-2017 | 03:30 PM | Active | View |
29. | Operation and Maintenance work of electrical installations of establishment at Corporate Office, Nagpur comprises of MOIL Bhawan, Rest House, West Court, Hospital and other official buildings of the company for the period of one year.(SDGM(E)/86/ HO/16-17 | 14-02-2017 | 14-03-2017 | 14-03-2017 | 14-03-2017 | 03:30 PM | Active | View |
30. | e-procurement of Tub Coupling Chain and Pin -3 Items(WE-113 e-tender No.MOIL/16-17/ET-185, Dt.14.02.17) | 14-02-2017 | 21-03-2017 | 21-03-2017 | 21-03-2017 | 03:30 PM | Active | View |
31. | Hiring of Bolero Jeep (Diesel) for the period of One year for Balaghat Mine.(DGM/BGT/MECH/TAXI/16-17/7810 Date 10.02.2017) | 13-02-2017 | 28-02-2017 | 28-02-2017 | 28-02-2017 | 04:30 PM | Active | View |
32. | Washing, Picking and collection of material from East side of A-dump (waste dump) at Tirodi Mine.(Gr.II/GM(M)/CONT/WASH/65/TRD/2016-17/51) | 13-02-2017 | 21-02-2017 | 21-02-2017 | 21-02-2017 | 03:30 PM | Active | View |
33. | RENOVATION OF TOILETS IN MINE OFFICE(KAN/CIVIL/16-17/182 DT 11.02.2017) | 12-02-2017 | 20-02-2017 | 20-02-2017 | 20-02-2017 | 03:30 PM | Active | View |
34. | Laying of PCC plateform below ROM Bunker and crushing plant at Gumgaon Mine(Civil/16-17/GUM/3600 Date 08.02.2017) | 10-02-2017 | 16-02-2017 | 16-02-2017 | 16-02-2017 | 04:00 PM | Active | View |
35. | PURCHASE OF SPARES FOR SAICO MAKE HOIST 5 TON CAPACITY(PUR/MOIL/C-11/136/E-78/2004-M) | 08-02-2017 | 01-03-2017 | 01-03-2017 | 01-03-2017 | 03:30 PM | Active | View |
36. | Installation of Watertight door at 234 MRL at Beldongri Mine(Bel/Civil/AGT/16-17/3076) | 07-02-2017 | 17-02-2017 | 17-02-2017 | 17-02-2017 | 04:30 PM | Active | View |
37. | Supplying, providing, installation and commissioning of Centralized UPS and required wiring for computers of office buildings at Balaghat, Tirodi in MP and Chikla, Dongri Buzurg, Gumgaon, Munsar and Kandri Mine in Maharashtra(SDGM(E)/86/ HO/16-17/ 292) | 07-02-2017 | 03-03-2017 | 03-03-2017 | 03-03-2017 | 03:30 PM | Active | View |
38. | Supplying, providing, installation and commissioning of Centralized UPS and required wiring for computers of office buildings at Balaghat, Tirodi in MP and Chikla, Dongri Buzurg, Gumgaon, Munsar and Kandri Mine in Maharashtra (SDGM(E)/86/ HO/16-17/ 292 ) | 07-02-2017 | 07-03-2017 | 07-03-2017 | 07-03-2017 | 3:30 PM | Active | View |
39. | Repair to Ben Electrical make 10 HP DC Traction motors belong to Ovis make battery locomotive of Balaghat Mine(BGT/TE/Elect/16-17/7630 Date 01.02.2017) | 06-02-2017 | 02-03-2017 | 02-03-2017 | 02-03-2017 | 04:30 PM | Active | View |
40. | SPIRAL CLASSIFIER FOR BALAGHAT MINE - 1 NO. (AS PER ANNEXURE - C ENCLOSED) (Only Through e-procurement)(WE-111 DT.06/02/2017, eTENDER NO.MOIL/16-17/ET/179) | 06-02-2017 | 10-03-2017 | 10-03-2017 | 10-03-2017 | 03:30 PM | Active | View |
41. | Supply of Medicines (Tenderers to note that offers shall be accepted from companies having ORG Ranking upto top 100 only as per ORG list of March 2016)(WE-98 e-tender No.MOIL/16-17/ET-177, Dt.06.02.17) | 06-02-2017 | 23-03-2017 | 23-03-2017 | 23-03-2017 | 03:30 PM | Active | View |
42. | e-Procurement of Mens Shoe, Lace type, Oxford Pattern with toe for Security Guards, Make of the Shoe-Bata-Liberty-2 items(WE-110 e-tender No.MOIL/16-17/ET-178, Dt.06.02.17) | 06-02-2017 | 16-03-2017 | 16-03-2017 | 16-03-2017 | 03:30 PM | Active | View |
43. | PURCHASE OF STAINLESS STEEL BALL VALVES(PUR/MOIL/C-11/14/E-76/1964-M) | 04-02-2017 | 27-02-2017 | 27-02-2017 | 27-02-2017 | 03:30 PM | Active | View |
44. | PURCHASE OF SLURRY TRANSFER HOSE(PUR/MOIL/C-11/30/E-75/1958-M) | 04-02-2017 | 27-02-2017 | 27-02-2017 | 27-02-2017 | 03:30 PM | Active | View |
45. | PURCHASE OF PARKER SINGLE SOLENOID VALVE(PUR/MOIL/C-11/131/E-74/1956-M) | 04-02-2017 | 22-02-2017 | 22-02-2017 | 22-02-2017 | 03:30 PM | Active | View |
46. | PURCHASE OF SEAMLESS TUBE AND MS ERW BOILER TUBE(PUR/MOIL/C-11/20/E-77/1972-M) | 04-02-2017 | 01-03-2017 | 01-03-2017 | 01-03-2017 | 03:30 PM | Active | View |
47. | PURCHASE OF SEAMLESS TUBE AND MS ERW BOILER TUBE (PUR/MOIL/C-11/20/E-77/1972-M) | 04-02-2017 | 31-03-2017 | 31-03-2017 | 31-03-2017 | 3:30 PM | Active | View |
48. | Extension of Program stage at Durga Chowk at Chikla Mine(TE/CH/CIVIL/16-17/860 dated 23.01.2017) | 01-02-2017 | 06-02-2017 | 06-02-2017 | 06-02-2017 | 03:30 PM | Active | View |
49. | Drilling of Bore Hole 121/4 inch Diameter with 8 inch diameter UPVC casing for sand Stowing Balaghat Mine.(MOIL/16-17/ET/174) | 01-02-2017 | 01-03-2017 | 01-03-2017 | 01-03-2017 | 03:30 PM | Active | View |
50. | PURCHASE OF SPIRAL LINER(PUR/MOIL/C-11/135/E-71/1895-M) | 31-01-2017 | 13-02-2017 | 13-02-2017 | 13-02-2017 | 03:30 PM | Active | View |
51. | PURCHASE OF SPIRAL LINER ( PUR/MOIL/C-11/135/E-71/1895-M ) | 31-01-2017 | 20-02-2017 | 20-02-2017 | 20-02-2017 | 3:30 pm | Active | View |
52. | SCREEN FRAME WITH SCREEN PANEL FOR JIG(PUR/MOIL/C-11/130/WE-108 (MOIL/16-17/ET/169)) | 31-01-2017 | 28-02-2017 | 28-02-2017 | 28-02-2017 | 03:30 PM | Active | View |
53. | Repairing of Radiator of Dozer Make BEMl BD-155 of Tirodi Mine, MOIL LIMITED(HO/MECH/TRD/16-17/867 DT. 28.1.17) | 30-01-2017 | 04-02-2017 | 04-02-2017 | 04-02-2017 | 04:00 PM | Active | View |
54. | Erection of HT and LT Line Installation of power transformer for extension of load at old Satak Beldongri(Bel/Elcct./AGT/16-17/3000) | 30-01-2017 | 09-02-2017 | 09-02-2017 | 09-02-2017 | 04:30 PM | Active | View |
55. | Underground development at -30 feet level at Munsar Mine (MOIL/16-17/ET/170) | 30-01-2017 | 23-02-2017 | 23-02-2017 | 23-02-2017 | 3:30 PM | Active | View |
56. | Construction of Retaining Wall and Platform for Railway siding at Kandri Mine(Civil /HO/16-17/ KAN/85) | 30-01-2017 | 01-03-2017 | 01-03-2017 | 01-03-2017 | 03:30 PM | Active | View |
57. | Construction of Motor Garage at Munsar Mine(MOIL/16-17/ET/172) | 30-01-2017 | 01-03-2017 | 01-03-2017 | 01-03-2017 | 03:30 PM | Active | View |
58. | Construction of Precast Boundary wall around mine lease in Kaichi camp at Munsar Mine(MOIL/16-17/ET/173) | 30-01-2017 | 01-03-2017 | 01-03-2017 | 01-03-2017 | 03:30 PM | Active | View |
59. | HIRING OF 50 MT CAPACITY MOBILE CRANE WITH 360 DEGREE REVOLVING TELESCOPIC EXTENDED BOOM OF UNLOADING AND ASSEMBLING OF BH60M Dumper- 3 Nos AT DONGRI BUZURG MINE (A-II/CHK/DB/16-17/ 864 dtd 28.01.2017) | 28-01-2017 | 30-01-2017 | 30-01-2017 | 30-01-2017 | 2:30 PM | Active | View |
60. | RENOVATION OF OLD MINE MANAGER BUNGLOW TO CONVERT TO TRANSIT ROOM(TRD/CIVIL/A/2016-17/3069A DT 21.01.2017) | 25-01-2017 | 31-01-2017 | 31-01-2017 | 31-01-2017 | 04:30 PM | Active | View |
61. | Concrete lining of cross cut in new wide ore body at -200 L at Gumgaon Mine(Mining/Gum/16-17/3498 Date 23.01.2017) | 25-01-2017 | 01-02-2017 | 01-02-2017 | 01-02-2017 | 04:30 PM | Active | View |
62. | Washing, Picking and collection of material from waste/reject (crude) from west side of 6 B section at Tirodi Mine(Gr.II/GM(M)/CONT/WASH/66/TRD/2016-17/50) | 25-01-2017 | 01-02-2017 | 01-02-2017 | 01-02-2017 | 03:30 PM | Active | View |
63. | WEBSITE LIMITED TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF PRINTER RIBBON CARTRIDGES FOR TVS MSP-255 MARATHON PRINTER, EPSON-FX-2175 PRINTER, TVS MSP 430 PRINTER, LIPI 6605 LINE MATRIX(PUR/MOIL/C-1/203/E-73/1918-M Dt.25.01.2017) | 25-01-2017 | 17-02-2017 | 17-02-2017 | 17-02-2017 | 03:30 PM | Active | View |
64. | Pattern Making casting machining and dynamic Balacing of Pump spares for 75 HP Maxflow make Pump at 8th Level Under ground of Balaghat Mine(DGM/BGT/MECH/PUMP/16-17/7389) | 24-01-2017 | 03-02-2017 | 03-02-2017 | 03-02-2017 | 04:30 PM | Active | View |
65. | PURCHASE OF VIBRATOR ASSEMBLY (MAKE-MS TRF LIMITED, JAMSHEDPUR) - 1 SET. (AS PER ANNEXURE - A ENCLOSED).(PUR/MOIL/C-4/212/E-72/1913-M DT.24/01/2017) | 24-01-2017 | 13-02-2017 | 13-02-2017 | 13-02-2017 | 03:30 PM | Active | View |
66. | Designing supply fabrication installation and commissioning of Electronic Belt Weigher system for IMB Plant Balaghat Mine(DGM/BGT/MECH/IMBP/16-17/7394) | 24-01-2017 | 14-02-2017 | 14-02-2017 | 14-02-2017 | 04:30 PM | Active | View |
67. | PURCHASE OF VIBRATOR ASSEMBLY (MAKE-MS TRF LIMITED, JAMSHEDPUR) - 1 SET. (AS PER ANNEXURE - A ENCLOSED). (PUR/MOIL/C-4/212/E-72/1913-M DT.24/01/2017) | 24-01-2017 | 27-02-2017 | 27-02-2017 | 27-02-2017 | 3:30 PM | Active | View |
68. | Designing supply fabrication installation and commissioning of Electronic Belt Weigher system for IMB Plant Balaghat Mine (DGM/BGT/MECH/IMBP/16-17/7394) | 24-01-2017 | 24-02-2017 | 24-02-2017 | 24-02-2017 | 4:30 PM | Active | View |
69. | Designing supply fabrication installation and commissioning of Electronic Belt Weigher system for IMB Plant Balaghat Mine (DGM/BGT/MECH/IMBP/16-17/7394) | 24-01-2017 | 01-03-2017 | 01-03-2017 | 01-03-2017 | 4:30 PM | Active | View |
70. | Construction of Doctor cabin(Bel/Civil/AGT/16-17/2966) | 23-01-2017 | 30-01-2017 | 30-01-2017 | 30-01-2017 | 04:30 PM | Active | View |
71. | Development Works and Laying of Paver Block for the parking zone infront of Integrated Manganese Beneficiation Plant, IMB at Balaghat Mine(Civil/BGT/T.E./2016-17/7391 Dated 23.01.2017) | 23-01-2017 | 31-01-2017 | 31-01-2017 | 31-01-2017 | 04:00 PM | Active | View |
72. | Construction and erection of Precast Pre stressed concrete elements for underground supports at Balaghat Mine(Civil/HO/16-17/BGT/81) | 23-01-2017 | 23-02-2017 | 23-02-2017 | 23-02-2017 | 03:30 PM | Active | View |
73. | Construction of Water Supply Scheme at Dongribuzurg Mine.(MOIL/16-17/ET/166) | 23-01-2017 | 23-02-2017 | 23-02-2017 | 23-02-2017 | 03:30 PM | Active | View |
74. | Construction of Partition walls for stacking Yard ,Retaining walls at Ferro Manganese Plant of Balaghat Mine.(Civil/HO/16-17/BGT/80) | 23-01-2017 | 23-02-2017 | 23-02-2017 | 23-02-2017 | 03:30 PM | Active | View |
75. | Construction of Vehicle Shed With washing pit at Gumgaon Mine.(MOIL/16-17/ET/164) | 23-01-2017 | 23-02-2017 | 23-02-2017 | 23-02-2017 | 03:30 PM | Active | View |
76. | LOADING AND UNLOADING OF STEEL SECTIONS, CEMENT BAGS AND OTHER MATERIAL WITH STACKING AT BALAGHAT MINE STORE(Gr.-I/CGM(PR)/CONT/LOADING/27/BGT/2016-17/15) | 21-01-2017 | 30-01-2017 | 30-01-2017 | 30-01-2017 | 03:30 PM | Active | View |
77. | Handling and Despatch of ore at Munsar Mine (MOIL/16-17/ET/160) | 21-01-2017 | 23-02-2017 | 23-02-2017 | 23-02-2017 | 3:30 PM | Active | View |
78. | Handling and Despatch of ore at Beldongri Mine (MOIL/16-17/ET/157) | 21-01-2017 | 23-02-2017 | 23-02-2017 | 23-02-2017 | 3:30 PM | Active | View |
79. | Handling and Despatch of ore at Tirodi Mine (MOIL/16-17/ET/155) | 21-01-2017 | 23-02-2017 | 23-02-2017 | 23-02-2017 | 3:30 PM | Active | View |
80. | Handling and Despatch of ore at Kandri Mine (MOIL/16-17/ET/159) | 21-01-2017 | 23-02-2017 | 23-02-2017 | 23-02-2017 | 3:30 PM | Active | View |
81. | Handling and Despatch of ore at Sitapatore Mine (MOIL/16-17/ET/156 ) | 21-01-2017 | 23-02-2017 | 23-02-2017 | 23-02-2017 | 3:30 PM | Active | View |
82. | Handling and Despatch of ore at Gumgaon Mine (MOIL/16-17/ET/158 ) | 21-01-2017 | 23-02-2017 | 23-02-2017 | 23-02-2017 | 3:30 PM | Active | View |
83. | Handling and Despatch of ore at Dongri Buzurg Mine (MOIL/16-17/ET/154) | 21-01-2017 | 23-02-2017 | 23-02-2017 | 23-02-2017 | 3:30 PM | Active | View |
84. | Handling and Despatch of ore at Chikla Mine (MOIL/16-17/ET/153 ) | 21-01-2017 | 23-02-2017 | 23-02-2017 | 23-02-2017 | 3:30 PM | Active | View |
85. | Handling and Despatch of ore at Balaghat Mine (MOIL/16-17/ET/152) | 21-01-2017 | 23-02-2017 | 23-02-2017 | 23-02-2017 | 3:30 PM | Active | View |
86. | Repair of water supply pipeline from Bhatera Pumping Station to Balaghat Mine and installation of air valves at Bhatera Pumping Station towards water supply scheme at Balaghat Mine(83/Civil/BGT/2016-17/7281 Date 17.01.2017) | 20-01-2017 | 27-01-2017 | 27-01-2017 | 27-01-2017 | 04:00 PM | Active | View |
87. | Development Works infront of Siding Office and Sample Preparation Room at Balaghat Mine(Civil/BGT/T.E/2016-17/7278 Date 17.01.2017) | 19-01-2017 | 25-01-2017 | 25-01-2017 | 25-01-2017 | 04:00 PM | Active | View |
88. | PURCHASE OF OFFICE FURNITURE, MAKE GODREJ - 14 ITEMS.(AS PER ANNEXURE - A ENCLOSED.(PUR/MOIL/C-4/54/E-70/1884-M DT.19/01/2017) | 19-01-2017 | 08-02-2017 | 08-02-2017 | 08-02-2017 | 03:30 PM | Active | View |
89. | Obtaining Environmental Clearance for Gumgaon, Kodegaon and Tegai manganese mine over an area of 126.84 Hec.(. Sr.DGM(Mines)/ EC-Gumgaon/2016-17/ 03) | 18-01-2017 | 27-01-2017 | 27-01-2017 | 27-01-2017 | 03:00 PM | Active | View |
90. | Making kaccha road inside the NEERI plantation area from Dr Juwarkar statue upto Incline haulage road at Gumgaon Mine(CIVIL/16-17/GUM/3460 Date 16.01.2017) | 18-01-2017 | 27-01-2017 | 27-01-2017 | 27-01-2017 | 04:30 PM | Active | View |
91. | Obtaining Environmental Clearance for Satak manganese mine over an area of 5.62 Hec(Sr.DGM(Mines)/ SE/EC-Satak/2016-17/02) | 18-01-2017 | 27-01-2017 | 27-01-2017 | 27-01-2017 | 03:00 PM | Active | View |
92. | Renovation works of Mine Magzine at Gumgaon Mine(CIVIL/16-17/GUM/3459 Date 16.01.2017) | 18-01-2017 | 27-01-2017 | 27-01-2017 | 27-01-2017 | 04:30 PM | Active | View |
93. | BLANKET RATE CONTRACT FOR ONE YEAR FOR SUPPLY OF VARIOUS TYPE OF PAINTS, THINNER etc.(WE-107 DT.18/01/2017(e-Tenderno.MOIL/16-17/ET/168)) | 18-01-2017 | 14-02-2017 | 14-02-2017 | 14-02-2017 | 03:30 PM | Active | View |
94. | Construction of Sub-Station Building for Housing L.T. and H.T. Switchgear along with Transformer Room for II nd Vertical Shaft at Ukwa Mine.(Civil /HO/16-17/ UK/82 Dt 17/01/2017) | 18-01-2017 | 17-02-2017 | 17-02-2017 | 17-02-2017 | 03:30 PM | Active | View |
95. | Purchase of Agitator Assembly(PUR/MOIL/C-11/43/WE-105 (MOIL/16-17/ET/165)) | 18-01-2017 | 27-02-2017 | 27-02-2017 | 27-02-2017 | 03:30 PM | Active | View |
96. | Drop raise from 3rd to 4th and its allied work at Munsar Mine(GM(M)-III/CONT/40/UG-DEV/MUN/16-17/48) | 17-01-2017 | 24-01-2017 | 24-01-2017 | 24-01-2017 | 03:30 PM | Active | View |
97. | Outsourcing the assignment of tub pushing in OCF at Munsar mine (Mun/Mine/HO/Agent/16-17/3875) | 16-01-2017 | 25-01-2017 | 25-01-2017 | 25-01-2017 | 4:30 PM | Active | View |
98. | Outsourcing the assignment of tub pushing in OCF at Munsar mine (Mun/Mine/HO/Agent/16-17/3875) | 16-01-2017 | 25-01-2017 | 25-01-2017 | 25-01-2017 | 4:30 PM | Active | View |
99. | Dismantlling of old quarters of kaichi camp at Munsar Mine. (Mun/ C/HO/Agent/16-17/ 3874 ) | 16-01-2017 | 25-01-2017 | 25-01-2017 | 25-01-2017 | 4:30 PM | Active | View |
100. | Collection and stacking of Mn ore through Vibrating screen at Munsar Mine (GM(M)-III/CONT/VBS/47/MUN/16-17/49) | 16-01-2017 | 24-01-2017 | 24-01-2017 | 24-01-2017 | 3:30 PM | Active | View |
Tenders More Information |
---|
Contracts finalised on nomination basis Details of Purchase Order issued by MATERIALS DEPARTMENT valuing Rs.30.00 Lakhs & Above
List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website) |
View (2024) Year Tenders |
View (2023) Year Tenders |
View (2022) Year Tenders |
View (2021) Year Tenders |
View (2020) Year Tenders |
View (2019) Year Tenders |
View (2018) Year Tenders |
View (2017) Year Tenders |
View (2016) Year Tenders |
View (2015) Year Tenders |
View (2014) Year Tenders |
View (2013) Year Tenders |
View (2012) Year Tenders |
View (24) Year Tenders |
View Full Tender Archive |
See all MOIL tender. |