Tender Archive
S.No. | Title | Issue Start Date | Issue Last Date | Submission Last Date | Opening Date | Opening Time | Status | View |
---|---|---|---|---|---|---|---|---|
1. | Annual Miscellaneous works and minor civil repairs works for Industrial Buildings at Chikla Mine.(MOIL/MOIL LIMITED/CMC/24-25/ET/18) | 09-05-2024 | 18-06-2024 | 18-06-2024 | 18-06-2024 | 04:00 PM | Active | View |
2. | Providing and fixing barbed wire fencing to protect thr sapling of plant planted to develop the 7.50 meter wide green belt at Parsoda Mine.(MOIL/MOIL LIMITED/CMC/24-25/ET/20) | 09-05-2024 | 18-06-2024 | 18-06-2024 | 18-06-2024 | 04:00 PM | Active | View |
3. | SUPPLY OF DRINKING WATER THROUGH WATER TANKERS TO CAMP AND COLONY AT CHIKLA MINE.(Civil/CH/NIT/24-25/163 DT.07.05.2024) | 08-05-2024 | 18-05-2024 | 18-05-2024 | 18-05-2024 | 04:30 PM | Active | View |
4. | Surplus Underground ROM Cleaning at Munsar Mine.(MUN/TENDER/24-25/183) | 08-05-2024 | 15-05-2024 | 15-05-2024 | 15-05-2024 | 04:30 PM | Active | View |
5. | Hiring of Statutory Staff (Mine Foremen) for Munsar Mine.(MUN/TENDER/24-25/171) | 07-05-2024 | 13-05-2024 | 13-05-2024 | 13-05-2024 | 04:30 PM | Active | View |
6. | Hiring of Statutory Staff (Mine Mate) for Munsar Mine.(MUN/TENDER/24-25/174) | 07-05-2024 | 13-05-2024 | 13-05-2024 | 13-05-2024 | 04:30 PM | Active | View |
7. | Removal of pebbles generated during sand stowing at Balaghat Mine(MINING/BGT/LTE/24-25/442 Dt. 03.05.2024) | 06-05-2024 | 10-05-2024 | 10-05-2024 | 10-05-2024 | 04:30 PM | Active | View |
8. | Outsourcing the work of making, collecting canteen items serving it in UG, BDC, Workshop, Administrative building of Kandri Mine(KD/PER/NIT/2024-25/223) | 06-05-2024 | 27-05-2024 | 27-05-2024 | 27-05-2024 | 04:30 PM | Active | View |
9. | Material required turbocharger assembly for TATA450 Hyd Excavator at Tirodi Mine(MOIL/TD01/MECH/2024/192 DT 04.05.2024) | 06-05-2024 | 15-05-2024 | 15-05-2024 | 15-05-2024 | 03:30 PM | Active | View |
10. | Concreting 13.5th Level (South) at Balaghat Mine(MINING/BGT/LTE/24-25/163 Dt 06.05.2024) | 06-05-2024 | 14-05-2024 | 14-05-2024 | 14-05-2024 | 04:30 PM | Active | View |
11. | Operation of Vibratory Screen Installed at Surface in Gumgaon Mine.(Agent/Gum/Min/24-25/169, Dt 06.05.2024) | 06-05-2024 | 16-05-2024 | 16-05-2024 | 16-05-2024 | 04:30 PM | Active | View |
12. | The transportation of sand from Kanhan River to the area near Rest House.(Agent/Gum/Min/23-24/346, date 06.05.2024) | 06-05-2024 | 17-05-2024 | 17-05-2024 | 17-05-2024 | 04:30 PM | Active | View |
13. | Loading and unloading of steel items, cement, timbers and other store items in the mine store.(CH/MECH/24-25/76-30630/109) | 02-05-2024 | 09-05-2024 | 09-05-2024 | 09-05-2024 | 04:30 PM | Active | View |
14. | Procurement of 33KV Oil Immersed 40/5A CTPT Metering Unit for Ukwa Mine(Procurement of 33KV Oil Immersed 40/5A CTPT Metete) | 02-05-2024 | 09-05-2024 | 09-05-2024 | 09-05-2024 | 04:30 PM | Active | View |
15. | Empanelment of LOCAL CHEMIST/MEDICAL SHOPS.(MOIL/MS/24-25/EC/01) | 02-05-2024 | 03-06-2024 | 03-06-2024 | 03-06-2024 | 03:30 PM | Active | View |
16. | Maintenance and Repairing work of Vertical shaft at Chikla Mine.(CH/MECH/24-25/76-30353/110) | 02-05-2024 | 09-05-2024 | 09-05-2024 | 09-05-2024 | 04:30 PM | Active | View |
17. | Fabrication of Turn Table Suitable for 24CFT Tilting Tubs of 13.5th level of Balaghat Mine.(AGT/BGT/MECH/TT/24-25/120) | 30-04-2024 | 21-05-2024 | 21-05-2024 | 21-05-2024 | 04:30 PM | Active | View |
18. | Fabrication of STEEL MANWAYS-1.5X0.84M For Ukwa Mine(AJGM/UK/MECH/2024-25/122) | 30-04-2024 | 08-05-2024 | 08-05-2024 | 08-05-2024 | 04:30 PM | Active | View |
19. | Installation of Ventilation fan at 2nd vertical and 5000CH Section and allied work for Ventilation in Underground of Ukwa Mine(AJGM/UK/MECH/2024-25/123) | 30-04-2024 | 09-05-2024 | 09-05-2024 | 09-05-2024 | 04:30 PM | Active | View |
20. | Restoration of Pipeline network of 9500CH Underground section at Ukwa Mine.(AJGM/UK/MECH/2024-25/124) | 30-04-2024 | 11-05-2024 | 11-05-2024 | 11-05-2024 | 04:30 PM | Active | View |
21. | Outsourcing of Operation and general maintenance of Side discharge loader at night shift of 1st vertical at Ukwa Mine.(AJGM/UK/MECH/2024-25/125) | 30-04-2024 | 13-05-2024 | 13-05-2024 | 13-05-2024 | 04:30 PM | Active | View |
22. | Schedule Maintenance and General Inspection of Rigid Guides Rails of 1st vertical shaft and 2nd vertical shaft Winder of Ukwa Mine(AJGM/UK/MECH/2024-25/126) | 30-04-2024 | 13-05-2024 | 13-05-2024 | 13-05-2024 | 04:30 PM | Active | View |
23. | Retrofitting Works towards strenghening of foundation of new Cell bay Building (01-09 No. Cell) and Interior Renovation Works for EMD Plant, Dongri Buzurg Mine.(MOIL/MOIL LIMITED/CMC/24-25/ET/16) | 30-04-2024 | 16-06-2024 | 16-06-2024 | 16-06-2024 | 04:00 PM | Active | View |
24. | Construction of Drain Network at Ukwa Village under Corporate Environment Responsibility (CER).(MOIL/MOIL LIMITED/CMC/24-25/ET/15) | 30-04-2024 | 06-06-2024 | 06-06-2024 | 06-06-2024 | 04:00 PM | Active | View |
25. | Renovation of Mine Canteen Building at Chikla Mine.(MOIL/MOIL LIMITED/CMC/24-25/ET/17) | 30-04-2024 | 06-06-2024 | 06-06-2024 | 06-06-2024 | 04:00 PM | Active | View |
26. | Drilling of Production holes at 8L North ,9 L North Balaghat Mine(MINING/BGT/LTE/24-25/130 Dt 30.04.2024) | 30-04-2024 | 08-05-2024 | 08-05-2024 | 08-05-2024 | 04:30 PM | Active | View |
27. | Drilling of Production holes at 13 L North at Balaghat Mine(MINING/BGT/LTE/24-25/392 Dt 30.04.2024) | 30-04-2024 | 09-05-2024 | 09-05-2024 | 09-05-2024 | 04:30 PM | Active | View |
28. | For Extra excavation of haulage road of 13.5 L North section at Balaghat Mine(MINING/BGT/LTE/24-25/394 Dt 30.04.2024) | 30-04-2024 | 09-05-2024 | 09-05-2024 | 09-05-2024 | 04:30 PM | Active | View |
29. | Making of Artificial pillar of RCC at 12th level north section Balaghat Mine(MINING/BGT/LTE/24-25/396 Dt 30.04.2024) | 30-04-2024 | 08-05-2024 | 08-05-2024 | 08-05-2024 | 04:30 PM | Active | View |
30. | Repairing of RH Travelling device of Hydraulic Excavator Tata Hitachi-220 deployed at Balaghat Mine.(AGT/BGT/MECH/EXC/24-25/116) | 29-04-2024 | 07-05-2024 | 07-05-2024 | 07-05-0024 | 04:30 PM | Active | View |
31. | Repairing of Bhatera pipe line between Boda and Tawejhari village beside Railway track at Balaghat Mine(CIVIL/BGT/LTE/24-25/114 Dt 29.04.2024) | 29-04-2024 | 07-05-2024 | 07-05-2024 | 07-05-2024 | 04:30 PM | Active | View |
32. | Major Renovation to Mine Manager Bunglow and under ground managers Bunglow at Balaghat Mine.(MOIL/MOIL LIMITED/CMC/24-25/ET/11) | 27-04-2024 | 28-05-2024 | 28-05-2024 | 28-05-2024 | 04:00 PM | Active | View |
33. | Construction of Community hall at Sitasaongi Village under CER.(MOIL/MOIL LIMITED/CMC/24-25/ET/12) | 27-04-2024 | 04-06-2024 | 04-06-2024 | 04-06-2024 | 04:00 PM | Active | View |
34. | Construcion of community hall at Chikla village under CER.(MOIL/MOIL LIMITED/CMC/24-25/ET/13) | 27-04-2024 | 04-06-2024 | 04-06-2024 | 04-06-2024 | 04:00 PM | Active | View |
35. | Fabrication of steel hopper and mixing chamber for new sand stowing plant at Chikla-B for Chikla.(CH/Mech/24-25/76-30535/231/84) | 26-04-2024 | 02-05-2024 | 02-05-2024 | 02-05-2024 | 04:30 PM | Active | View |
36. | OUTSOURCING OF SKILLED MANPOWER ELECTRICIAN FOR MAINTENANCE OF ELECTRICAL INSTALLAION IN UDERGROUND AT BALAGHAT MINE(BGT/TE/ELECT/AJGM/24-25/99) | 26-04-2024 | 07-05-2024 | 07-05-2024 | 07-05-2024 | 03:30 PM | Active | View |
37. | Annual Repair to Camp and Residential Quarters at Chikla Mine.(MOIL/MOIL LIMITED/CMC/24-25/ET/8) | 26-04-2024 | 03-06-2024 | 03-06-2024 | 03-06-2024 | 04:00 PM | Active | View |
38. | Construction of Cement Concrete Road at Chakhdehi Village, District Mandala (M.P) under CSR.(MOIL/MOIL LIMITED/CMC/24-25/ET/9) | 26-04-2024 | 03-06-2024 | 03-06-2024 | 03-06-2024 | 04:00 PM | Active | View |
39. | Annual Repair to Camp quarters at Balaghat Mine.(MOIL/MOIL LIMITED/CMC/24-25/ET/10) | 26-04-2024 | 27-05-2024 | 27-05-2024 | 27-05-2024 | 04:00 PM | Active | View |
40. | Dismantling of major Components, Shifting and Lowering to 7th and 2nd Level Underground assembling and Commissioning of 1 nos. new Load Haul Dump(LHD) Loader each at both Levels of Ukwa Mine(AJGM/UK/MECH/2024-25/102) | 25-04-2024 | 02-05-2024 | 02-05-2024 | 02-05-2024 | 04:30 PM | Active | View |
41. | Garbage disposal, drain cleaning,grass cutting and other sanitation work at Tirodi Mine.(MOIL/TRD/pers/24-25/128 DATED 24/04/2024) | 24-04-2024 | 29-04-2024 | 29-04-2024 | 29-04-2024 | 04:00 PM | Active | View |
42. | cleaning underground sump drain at munsar mine(MUN/TENDER/24-25/96) | 22-04-2024 | 27-04-2024 | 27-04-2024 | 27-04-2024 | 04:30 PM | Active | View |
43. | Providing and Applying weather shield paint, Interior emulsion and oil paint to MOIL VT Center building at Munsar Mine(AGT/GUM/CIVIL/LT/24-25/102) | 22-04-2024 | 29-04-2024 | 29-04-2024 | 29-04-2024 | 04:30 PM | Active | View |
44. | Drilling of Muck generation hole for production at -30 Level at Munsar Mine.(AGT/MUN/MIN/LT/24-25/103) | 22-04-2024 | 29-04-2024 | 29-04-2024 | 29-04-2024 | 04:30 PM | Active | View |
45. | Recover SM grade Ore Underground sub grade mineral rejects Mn rock at Munsar Mine(AGT/MUN/MIN/NIT/24-25/121) | 22-04-2024 | 29-04-2024 | 29-04-2024 | 29-04-2024 | 04:30 PM | Active | View |
46. | Drilling of Bore Hole 110mm(Diameter)5nos (30 Meters each)150RMT at 2nd level(MUN/TENDER/24-25/98) | 22-04-2024 | 27-04-2024 | 27-04-2024 | 27-04-2024 | 04:30 PM | Active | View |
47. | Ancillary Works for Crusher Unit installed at BDC Section, Dongribuzurg Mine(DB/CIVIL/NIT/TE/2024-25/47 Date 16.04.24) | 18-04-2024 | 23-04-2024 | 23-04-2024 | 23-04-2024 | 04:30 PM | Active | View |
48. | Development Works towards making of approach ramps, drains around Slime Pond near Integrated Manganese Beneficiation Plant, Dongribuzurg Mine.(DB/CIVIL/NIT/TE/2024-25/ Date 16.04.2024) | 18-04-2024 | 26-04-2024 | 26-04-2024 | 26-04-2024 | 04:30 PM | Active | View |
49. | Providing and laying 1 GI pipeline for drinking water with accessories as per inset level of 2nd Vertical shaft of Ukwa Mine(AJGM/UK/MECH/2024-25/86) | 18-04-2024 | 25-04-2024 | 25-04-2024 | 25-04-2024 | 04:30 PM | Active | View |
50. | Repairing of lubi make 40HP and 15HPN Submersible Pump of Ukwa Mine.(AJGM/UK/MECH/2024-25/85) | 18-04-2024 | 25-04-2024 | 25-04-2024 | 25-04-2024 | 04:30 PM | Active | View |
51. | The transportation of sand from Kanhan River to the area near Rest House.(Agent/Gum/Min/24-25/90, date 17.04.2024) | 17-04-2024 | 29-04-2024 | 29-04-2024 | 29-04-2024 | 04:30 PM | Active | View |
52. | Formation of base foundation for installation of Chock in underground faces.(Gum/Min/24-25/191, date 17.04.2024) | 17-04-2024 | 27-04-2024 | 27-04-2024 | 27-04-2024 | 04:30 PM | Active | View |
53. | Making of garland drain along various waste dumps at Tirodi Mine.(TRD/CIVIL/2023-24/2049 DATED 21/01/2024) | 17-04-2024 | 23-04-2024 | 23-04-2024 | 23-04-2024 | 04:00 PM | Active | View |
54. | Construction of stone masonry wall along South and North waste dump at Tirodi Mine.(TRD/CIVIL/2023-24/2048 DATED 21/03/2024) | 17-04-2024 | 23-04-2024 | 23-04-2024 | 23-04-2024 | 04:00 PM | Active | View |
55. | Making of garland drain along various waste dumps at Sitapatore Mine.(MOIL/SP/Civil/2023-24/2050 Dated 21/03/2024) | 17-04-2024 | 23-04-2024 | 23-04-2024 | 23-04-2024 | 04:00 PM | Active | View |
56. | EXTRA EXCAVATION IN 2ND LEVEL AT MUNSAR MINE(MUN /TENDER/24-25/100) | 17-04-2024 | 24-04-2024 | 24-04-2024 | 24-04-2024 | 04:30 PM | Active | View |
57. | PRINTING OF VARIOUS FORMS, FORMATS AND REGISTER FOR CHIKLA MINE.(CH/TE/PERS/24-25/30 DATE-08.04.2024) | 16-04-2024 | 27-04-2024 | 27-04-2024 | 27-04-2024 | 03:30 PM | Active | View |
58. | Construction of Boundary wall around government Primary and secondary School at ukwa under CER.(MOIL/MOIL LIMITED/CMC/24-25/ET/5) | 16-04-2024 | 16-05-2024 | 16-05-2024 | 16-05-2024 | 04:00 PM | Active | View |
59. | Laying of water Distribution Line to Chikla Village under CER.(MOIL/MOIL LIMITED/CMC/24-25/ET/6) | 16-04-2024 | 24-05-2024 | 24-05-2024 | 24-05-2024 | 04:00 PM | Active | View |
60. | Construction of Toilet Block in Government Girls School in Ukwa Village under Corporate Environment Responsibility (CER).(MOIL/MOIL LIMITED/CMC/24-25/ET/7) | 16-04-2024 | 16-05-2024 | 16-05-2024 | 16-05-2024 | 04:00 PM | Active | View |
61. | DEVELOPMENT OF GARDEN IN FRONT OF ADMINISTRATIVE BUILDING AT CHIKLA MINE.(CH/CIVIL/NIT/24-25/57 DATE-15.04.2024) | 16-04-2024 | 27-04-2024 | 27-04-2024 | 27-04-2024 | 04:30 PM | Active | View |
62. | Cleaning of accumulated sand from -50L at Kandri Mine(KD/MINES/NIT/2024-25/112) | 13-04-2024 | 04-05-2024 | 04-05-2024 | 04-05-2024 | 04:30 PM | Active | View |
63. | Cleaning of accumulated sand incline to from -150L at Kandri Mine(KD/MINES/NIT/2024-25/115) | 13-04-2024 | 06-05-2024 | 06-05-2024 | 06-05-2024 | 04:30 PM | Active | View |
64. | Supply, Installation, Commissioning of Wired Networking Equipment with necessary accessories/equipment for Re-setup of LAN of Admin Building at Ukwa Mine(AGT/UK/SYS/NETWORK/2024-25/65) | 12-04-2024 | 27-04-2024 | 27-04-2024 | 27-04-2024 | 04:00 PM | Active | View |
65. | REPAIR AND REWINDING OF 80V, 7.5KW, 10HP DC SERIES MOTOR OF BALAGHAT MINE 2 NOS.(BGT/TE/ELECT/AJGM/24-25/62) | 12-04-2024 | 02-05-2024 | 02-05-2024 | 02-05-2024 | 03:30 PM | Active | View |
66. | Annual repair work of School Bus MH40N3405 of kandri Mine(Mech/KD/24-25/107) | 11-04-2024 | 04-05-2024 | 04-05-2024 | 04-05-2024 | 04:30 PM | Active | View |
67. | Dismantling of existing 30lb Tram line of pit top and laying of 60lb Tram line and Fabrication of 60lb rail LH and diamond crossing(Mech/KD/24-25/94) | 11-04-2024 | 30-04-2024 | 30-04-2024 | 30-04-2024 | 04:30 PM | Active | View |
68. | Construction of RCC retaining wall for new Crushing and screening Plant at Sitapatore Mine.(MOIL/MOIL LIMITED/CMC/24-25/ET/4) | 10-04-2024 | 10-05-2024 | 10-05-2024 | 10-05-2024 | 04:00 PM | Active | View |
69. | Overhauling Centrifugal Pump Kirloskar 150HP second level(Mech/KD/24-25/105) | 10-04-2024 | 01-05-2024 | 01-05-2024 | 01-05-2024 | 04:30 PM | Active | View |
70. | Miscellaneous civil works for Slime pond at Nagra plant of Ukwa Mine.(AGT/CIVIL/UK/LT/2024-25/15 DT. 09/04/2024) | 09-04-2024 | 15-04-2024 | 15-04-2024 | 15-04-2024 | 04:30 PM | Active | View |
71. | providing, supplying and installing fire fighting system FMP, balaghat mine(TE/MOIL/AGT/FMP/ELECT/24-25/08) | 08-04-2024 | 25-04-2024 | 25-04-2024 | 25-04-2024 | 04:25 PM | Active | View |
72. | Purchase of spring Steel Mesh Wire Panel for 6mm and 25mm Vibrating Screen of IMB plant of Balaghat Mine.(PUR/MOIL/BGT/IMB/24-25/16) | 08-04-2024 | 22-04-2024 | 22-04-2024 | 22-04-2024 | 04:30 PM | Active | View |
73. | PURCHASE OF SPARES FOR AIR AND WATER COOLED COMPRESSORS FOR KANDRI MINE(PUR/MOIL/KD/MECH/01) | 08-04-2024 | 27-04-2024 | 27-04-2024 | 27-04-2024 | 04:30 PM | Active | View |
74. | Hiring of JCB Machine with Tolley Breaker at Tirodi Mine.(MOIL/TRD/MINE/2024/257 dated - 23/03/2024) | 08-04-2024 | 15-04-2024 | 15-04-2024 | 15-04-2024 | 04:00 PM | Active | View |
75. | Stripping of ore body, loading of blasted muck and pushing of loaded tubs upto haulage Road and supporting of the stripping Area.(MUN/TENDER/24-25/43) | 08-04-2024 | 15-04-2024 | 15-04-2024 | 15-04-2024 | 04:30 PM | Active | View |
76. | Construction of boundary wall for Existing school building at Ukwa Mine.(AGT/CIVIL/UK/LT/2024-25/13 DT. 08/04/2024) | 08-04-2024 | 15-04-2024 | 15-04-2024 | 15-04-2024 | 04:30 PM | Active | View |
77. | Construction of ventilation fan room for 2nd vertical shaft of ukwa mine.(AGT/CIVIL/UK/LT/2024-25/14 DT. 08/04/2024) | 08-04-2024 | 15-04-2024 | 15-04-2024 | 15-04-2024 | 04:30 PM | Active | View |
78. | Supply of Spears for TR Bearing, 30209 for Tub Trolley maintenance.(CH/MECH/24-25/10009732/14) | 08-04-2024 | 17-04-2024 | 17-04-2024 | 17-04-2024 | 04:30 PM | Active | View |
79. | Repairing to Old Gantry wall with stone Masonry at Siding Premises at Kandri Mine(CIVIL/KD/T.E./24-25/24 26.04.2024) | 06-04-2024 | 26-04-2024 | 26-04-2024 | 26-04-2024 | 04:30 PM | Active | View |
80. | Requirement of Spares for 150HP Mather and Platt Make Pump Model ET ISO32 0 150X125 500 for BALAGHAT MINE(PUR/BGT/PUMP/24-25/18) | 06-04-2024 | 26-04-2024 | 26-04-2024 | 26-04-2024 | 04:30 PM | Active | View |
81. | purchase of Button Bit for FRD DCR 20 DRILL MACHINE for Dongri Buzurg Mine(PUR/MOIL/DB/2024-25/24) | 05-04-2024 | 11-04-2024 | 11-04-2024 | 11-04-2024 | 04:30 PM | Active | View |
82. | Flushing of Septic Tanks, Inspection Chambers and conveying pipeline of Sewage System of Chandmara Colony, Dongribuzurg Mine.(DB/CIVIL/NIT/TE/2023-24/ 31.03.2024) | 05-04-2024 | 10-04-2024 | 10-04-2024 | 10-04-2024 | 04:30 PM | Active | View |
83. | De-silting and cleaning of sump and surrounding area of sump at 13L, 100L, 200L, 300L and 400L.(Agent/Gum/Min/24-25/17, date 03.04.2024) | 03-04-2024 | 15-04-2024 | 15-04-2024 | 15-04-2024 | 04:30 PM | Active | View |
84. | Hiring of equipment for removal of waster rock and handeling the same by mechanized means at uderground area,south section with drilling and blasting at Tirodi Mine.(MOIL/TRD/MINE/2024/211/2067 DATED 10/03/2024) | 02-04-2024 | 09-04-2024 | 09-04-2024 | 09-04-2024 | 04:00 PM | Active | View |
85. | Repairing and servicing of Air After cooler and Oil cooler of IR Compressor and Godrej compressor.(CH/Mech/23-24/76-30097/1924) | 02-04-2024 | 09-04-2024 | 09-04-2024 | 09-04-2024 | 04:30 PM | Active | View |
86. | Major Overhaul of Engine of L and T make Loader at Chikla Mine.(CH/Mech/23-24/76-30443/1928) | 02-04-2024 | 09-04-2024 | 09-04-2024 | 09-04-2024 | 04:30 PM | Active | View |
87. | Repairing of 4 Stage Hydraulic Pump and feed motor of Universal Drill Machine operating at 4TH Level(CH/MECH/23-24/76-30072/1925) | 02-04-2024 | 16-04-2024 | 16-04-2024 | 16-04-2024 | 04:30 PM | Active | View |
88. | LANDSCAPE WORKS COMPRISING OF LAYING OF TURF TOWARDS DEVELOPMENT OF LAWN SPACE INSIDE AGENTS BUNGALOW CHIKLA MINE.(CH/CIVIL/NIT/23-24/04 DATE-01.04.2024) | 02-04-2024 | 16-04-2024 | 16-04-2024 | 16-04-2024 | 04:30 PM | Active | View |
89. | Purchase of Spares for TATA make Tipper of Dongri Buzurg Mine.(PUR/MOIL/AGT/DB/2023-24/1910) | 01-04-2024 | 23-04-2024 | 23-04-2023 | 23-04-2023 | 04:30 PM | Active | View |
90. | Purchase of Spares for TATA make Tipper of Dongri Buzurg Mine.(PUR/MOIL/AGT/DB/2023-24/1910) | 01-04-2024 | 23-04-2024 | 23-04-2024 | 23-04-2024 | 04:30 PM | Active | View |
91. | Pro and fit RVA and Seat Belt reminder with human voice of Excavator Dumper and Tipper at TRD Mine(MOIL/TRD/ME/GEN/2024/139/2093 DT-28.03.2024) | 01-04-2024 | 10-04-2024 | 10-04-2024 | 10-04-2024 | 03:30 PM | Active | View |
92. | Maintenance and repair of L.T and H.T. overhead line at Chikla Mine.(AGENT/GR-II/ELECT/23-24/1929) | 01-04-2024 | 15-04-2024 | 15-04-2024 | 15-04-2024 | 04:30 PM | Active | View |
93. | Providing supplying and installation of 79 Mtr. radius Lightening Arrester.(AGENT/GR-II/ELECT/23-24/1936) | 01-04-2024 | 15-04-2024 | 15-04-2024 | 15-04-2024 | 04:30 PM | Active | View |
94. | Fabrication of Pump Spares by Pattern Making, Casting and Machining work for 240 HP Kirloskar Make Multistage Pump of Balaghat Mine.(AGT/BGT/MECH/PUMP/23-24/2107) | 30-03-2024 | 22-04-2024 | 22-04-2024 | 22-04-2024 | 04:30 PM | Active | View |
95. | Ultrasonic and Magnetic Particle NDT Testing of CSG Components of all Winders for one year at Balaghat Mine.(AGT/BGT/MECH/WINDER/23-24/2108) | 30-03-2024 | 22-04-2024 | 22-04-2024 | 22-04-2024 | 04:30 PM | Active | View |
96. | Underground Sump cleaning including drain at Chikla Mine.(Mining/CH/T.E./23-24/1912) | 30-03-2024 | 06-04-2024 | 06-04-2024 | 06-04-2024 | 04:30 PM | Active | View |
97. | Hiring front end loader to draw back the sub grade mineral reject within7.5 meters of mine lease boundary at Balaghat Mine(MINING/BGT/LTE/23-24/2095 Dt 29.03.2024) | 29-03-2024 | 05-04-2024 | 05-04-2024 | 05-04-2024 | 04:30 PM | Active | View |
98. | SPARES FOR INDUS ROCK TOOL MAKE DRILL MACHINE IRB 400 FOR TIRODI MINE(MOIL/HO/MECH/GEN/2024/134/2081 DT- 27.03.2024) | 29-03-2024 | 05-04-2024 | 05-04-2024 | 05-04-2024 | 03:30 PM | Active | View |
99. | Proposal for Major repairing of bucket PC450 AND TATA220 Hyd Excavator at Tirodi Mine(MOIL/TD01/ME/GEN/2024/139/2092 DT-28.03.2024) | 29-03-2024 | 06-04-2024 | 06-04-2024 | 06-04-2024 | 03:30 PM | Active | View |
100. | Misc works for firefighting arrangement in 33 KV substation at Balaghat Mine(CIVIL/BGT/LTE/23-24/2100 Dt 29.03.2024) | 29-03-2024 | 05-04-2024 | 05-04-2024 | 05-04-2024 | 04:30 PM | Active | View |
Tenders More Information |
---|
Details of Purchase Order issued by MATERIALS DEPARTMENT valuing Rs.30.00 Lakhs & Above List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website) |
View (2025) Year Tenders |
View (2024) Year Tenders |
View (2023) Year Tenders |
View (2022) Year Tenders |
View (2021) Year Tenders |
View (2020) Year Tenders |
View (2019) Year Tenders |
View (2018) Year Tenders |
View (2017) Year Tenders |
View (2016) Year Tenders |
View (2015) Year Tenders |
View (2014) Year Tenders |
View (2013) Year Tenders |
View (2012) Year Tenders |
View (205) Year Tenders |
View (24) Year Tenders |
View Full Tender Archive |
See all MOIL tender. |