Tender Archive
S.No. | Title | Issue Start Date | Issue Last Date | Submission Last Date | Opening Date | Opening Time | Status | View |
---|---|---|---|---|---|---|---|---|
1. | Transportation and unloading of tubs into tippler at surface.(Agent/Gum/Min/23-24/35, Date-08.04.2023) | 11-04-2023 | 18-04-2023 | 18-04-2023 | 18-04-2023 | 04:30 PM | Active | View |
2. | for Pushing of tubs from LHD faces in 300L at Gumgaon Mine.(Agent/Gum/Min/23-24/37, Dt 08/04/2023) | 11-04-2023 | 18-04-2023 | 18-04-2023 | 18-04-2023 | 04:40 PM | Active | View |
3. | Operation of vibratory screen installed at surface in Gumgaon Mine.(Agent/Gum/Min/23-24/38 Dt 08/04/2023) | 11-04-2023 | 18-04-2023 | 18-04-2023 | 18-04-2023 | 04:45 PM | Active | View |
4. | for Cleaning of silt accumulated in drain, haulage road and sump of 200L and 300L(Agent/Gum/Min/23-24/39, Dt 08.04.2023) | 11-04-2023 | 18-04-2023 | 18-04-2023 | 18-04-2023 | 05:00 PM | Active | View |
5. | Fabrication of Rack and Pinion Gear set 30Nos.,Sleeves-20Nos. and Piston-20Nos. of Actuator assembly of butterfly valve of air pulsating Jig of IMB plant at Balaghat(AGT/BGT/MECH/IMB/23-24/32) | 10-04-2023 | 24-04-2023 | 24-04-2023 | 24-04-2023 | 04:30 PM | Active | View |
6. | Fabrication of 1.5Mtrs Dia. X 2.4Mtrs Height Steel Manways-12 sets for underground at Balaghat Mine(AGT/BGT/MECH/Man-way/23-24/33) | 10-04-2023 | 24-04-2023 | 24-04-2023 | 24-04-2023 | 04:00 PM | Active | View |
7. | PURCHASE OF HIGHER GRADE CONCAVE-1No. and MANTLE-1NO. (Gr-MNS-04) FOR CONE CRUSHER UNIT OF PILOT PLANT OF BALAGHAT MINE.(PUR/MOIL/BGT/PP-CC/23-24/31) | 08-04-2023 | 28-04-2023 | 28-04-2023 | 28-04-2023 | 04:30 PM | Active | View |
8. | CABLE BOLTING OPERATION IN -450 LEVE UNDERGROUND AT KANDRI MINE(KD/MINES/NIT/2023-24/57) | 08-04-2023 | 17-04-2023 | 17-04-2023 | 17-04-2023 | 04:30 PM | Active | View |
9. | Minor Repairing and Testing of Transmission Assy. of LT WL-9020 Wheel loader of Balaghat Mine.(AGT/BGT/MECH/MG/23-24/22) | 06-04-2023 | 13-04-2023 | 13-04-2023 | 13-04-2023 | 04:30 PM | Active | View |
10. | Repair of existing khosala compressor house building and water proofing of Electrical substation at First vertical shaft premises at Chikla Mine.(Civil/CH/TE/23-24/04 Date-01.04.2023) | 06-04-2023 | 20-04-2023 | 20-04-2023 | 20-04-2023 | 04:30 PM | Active | View |
11. | Fabrication of Grizzly segments for IMB Plant of DB mine.(DB/IMB/22-23/76-24622/03 Date 01/04/2023) | 04-04-2023 | 11-04-2023 | 11-04-2023 | 11-04-2023 | 03:30 PM | Active | View |
12. | Hiring of Hyd. Excavator with Rock breaker arrangement for excavating the Outcrop ore at Surface between Ch-63-58.50 of South Section of Mine areas of Balaghat Mine.(AGT/BGT/MECH/HIRING/23-24/09) | 04-04-2023 | 13-04-2023 | 13-04-2023 | 13-04-2023 | 04:30 PM | Active | View |
13. | Fabrication of pinion Gear and idler gear set for Tub Tippler of Material Handling Plant at Chikla.(TE/CH/MECH/22-23/76-24186/1494 Date 30/03/2023) | 03-04-2023 | 10-04-2023 | 10-04-2023 | 10-04-2023 | 03:30 PM | Active | View |
14. | NDT of vital components of winder of Chikla Mine.(TE/CH/MECH/22-23/76-24560/1495 DATE 30/03/2023) | 03-04-2023 | 10-04-2023 | 10-04-2023 | 10-04-2023 | 03:30 PM | Active | View |
15. | Proposal for supply of unskilled labour for loading and unloading of various materials.(STORE/CH/T.E./22-23/1473) | 01-04-2023 | 19-04-2023 | 19-04-2023 | 19-04-2023 | 04:00 PM | Active | View |
16. | Supply of brake liners for BEML make BH60M dumpers Operating at Dongri Buzurg Mine(PUR/DB/MECH/2022-23/1478) | 31-03-2023 | 18-04-2023 | 18-04-2023 | 18-04-2023 | 04:30 PM | Active | View |
17. | Supply of front caliper brake liners for BEML make BH60M dumper no-5 and no-6 Operating at Dongri Buzurg Mine(PUR/DB/MECH/2022-23/1479) | 31-03-2023 | 19-04-2023 | 19-04-2023 | 19-04-2023 | 04:30 PM | Active | View |
18. | Shifting of 3phase 5wire LT Overhead Line from construction site of of new WBM road at Gumgaon Mine(GUM/ELECT/22-23/3050 DT 30/03/2023) | 30-03-2023 | 12-04-2023 | 12-04-2023 | 12-04-2023 | 04:30 PM | Active | View |
19. | SHIFTING AND INSTALLATION OF ROAD WEIGHBRIDGE FROM TIRODI(MP) TO KALAPHATA SAND LEASE AREA (MAHARASHTRA)(Agent/Gr-III/Mech/22-23/3720) | 29-03-2023 | 07-04-2023 | 07-04-2023 | 07-04-2023 | 04:30 PM | Active | View |
20. | Construction of retaining wall for Bunker near Vertical Shaft at Gumgaon Mine.(MOIL/23-24/ET/2) | 29-03-2023 | 10-05-2023 | 10-05-2023 | 10-05-2023 | 03:30 PM | Active | View |
21. | Providing and fixing chain link fencing along Parsoda old open Cast pit (325 MRL) at Parsoda Mine.(MOIL/23-24/ET/10) | 29-03-2023 | 15-05-2023 | 15-05-2023 | 15-05-2023 | 03:30 PM | Active | View |
22. | Construction of Settling tank and drain near crushing plant bunker, second vertical Shaft at chikla Mine.(MOIL/23-24/ET/12) | 29-03-2023 | 15-05-2023 | 15-05-2023 | 15-05-2023 | 03:30 PM | Active | View |
23. | Landscaping and Beautification works at C type officers colony quarters at Ukwa mine.(MOIL/23-24/ET/5) | 29-03-2023 | 10-05-2023 | 10-05-2023 | 10-05-2023 | 03:30 PM | Active | View |
24. | Fabrication, Installation and commissioning of water tight Doors at -270 feet Level CH 1580, -70 feet level CH 1700 and -470 feet level CH 1800 at Chikla Mine.(MOIL/23-24/ET/6) | 29-03-2023 | 10-05-2023 | 10-05-2023 | 10-05-2023 | 03:30 PM | Active | View |
25. | Miscellaneous Civil Works at EMD Plant and Administrative Building at Dongri Buzurg Mine.(MOIL/23-24/ET/7) | 29-03-2023 | 10-05-2023 | 10-05-2023 | 10-05-2023 | 03:30 PM | Active | View |
26. | Tub Pushing work in different levels of Balaghat mine(MINING/BGT/LT/AGT/2022-23/1675 dt.28.03.2023) | 28-03-2023 | 04-04-2023 | 04-04-2023 | 04-04-2023 | 04:30 PM | Active | View |
27. | Filling Spreading of Waste rock at production shaft of 10th level at Balaghat Mine(MINING/BGT/LT/AGT/2022-23/1674 DT28.03.2023) | 28-03-2023 | 04-04-2023 | 04-04-2023 | 04-04-2023 | 04:30 PM | Active | View |
28. | Insulation and painting of air cooler duct installed at New Administrative building at Balaghat Mine.(CIVIL/BGT/LT/AGT/2022-23/1673 dt.28.03.2023) | 28-03-2023 | 04-04-2023 | 04-04-2023 | 04-04-2023 | 04:30 PM | Active | View |
29. | Upgradation of CCTV system installed at Kalaphata Sand Ghat and weigh bridge at Kandri Mine.(AGENT/GRIII/ELECT/22-23/1870) | 27-03-2023 | 31-03-2023 | 31-03-2023 | 31-03-2023 | 04:30 PM | Active | View |
30. | Fabrication of steel ore pass chute of 1.0 Meter diameter X 1.05 Meter height for Chikla Mine.(TE/CH/MECH/GEN/2023/114/1443 date 21/03./2023) | 27-03-2023 | 03-04-2023 | 03-04-2023 | 03-04-2023 | 03:30 PM | Active | View |
31. | Drilling of Bore Hole 110mm 5 NOS 30 MTR EACH 150RMT At I st Level plus 70 L(Agent and Dy.GM(M)/G-III/2022-23/1873) | 25-03-2023 | 31-03-2023 | 31-03-2023 | 31-03-2023 | 04:30 PM | Active | View |
32. | EXPRESSION OF INTEREST FOR PROVIDING CONSULTANCY FOR PRELIMINARY DESIGN, DETAILED COST ESTIMATE/ SCHEDULE TENDER DOCUMENT AND ASSISTANCE IN EVALUATION OF BIDS IN RESPECT OF PROPOSED PRODUCTION AND VENTILATION SHAFTS AT DONGRI BUZURG MINE OFMOIL LTD NDA/Pre Qualification AS PER TENDER DOCUMENT(EOI/MOIL/TECH/2023/345) | 25-03-2023 | 10-04-2023 | 10-04-2023 | 10-04-2023 | 03:30 PM | Active | View |
33. | Out sourcing of maintenance and operation manpower master banks man and Fitters(UK01/MECH/GEN/2023/86/1653 DT 23.03.2023) | 25-03-2023 | 01-04-2023 | 01-04-2023 | 01-04-2023 | 04:30 PM | Active | View |
34. | Out sourcing of maintenance and operation manpower bell man for 2nd vertical shaft at Ukwa Mine(UK01/MECH/GEN/2023/86/1654 DT 23.03.2023) | 25-03-2023 | 01-04-2023 | 01-04-2023 | 01-04-2023 | 04:30 PM | Active | View |
35. | Various repair work to be caried out at IMB plant of DB Mine(DB/IMBP.22-23/76-24188/1444) | 24-03-2023 | 04-04-2023 | 04-04-2023 | 04-04-2023 | 04:00 PM | Active | View |
36. | Fabrication of Steel Ore-Passes and Manways for Underground Mines i.e. Balaghat, Ukwa, Chikla, Beldongri, Munsar, Kandri and Gumgaon Mine(MOIL/23-24/ET/15) | 24-03-2023 | 24-04-2023 | 24-04-2023 | 24-04-2023 | 03:30 PM | Active | View |
37. | PURCHASE OF BOILER SPARES FOR EMD PLANT, DONGRI BUZRUG MINE(MOIL/22-23/ET-16) | 23-03-2023 | 12-04-2023 | 12-04-2023 | 13-04-2023 | 03:30 PM | Active | View |
38. | 1. Repairing of 1010KVA DG Set of Dongri Buzurg Mine(OEM/Authorized Service Dealer )(DB/ELECT/22-23/1454) | 23-03-2023 | 01-04-2023 | 01-04-2023 | 01-04-2023 | 04:30 PM | Active | View |
39. | ELECTRICAL WIRING AND FIXTURE AT NEWLY CONSTRUCTED PANEL ROOM AT IMB PLANT OF BALAGHAT MINE(BGT/TE/ELECT/AJGM/22-23/1645) | 22-03-2023 | 29-03-2023 | 29-03-2023 | 29-03-2023 | 03:30 PM | Active | View |
40. | Fabrication of Rock bolts and Bearing plates for underground of Gumgaon Mine(AGENT/GM/MECH/22-23/1838) | 21-03-2023 | 04-04-2023 | 04-04-2023 | 04-04-2023 | 04:30 PM | Active | View |
41. | Repairing of 40 Cft and 24 Cft Tub assemblies at Gumgaon Mine(AGENT/GM/MECH/22-23/1851) | 21-03-2023 | 05-04-2023 | 05-04-2023 | 05-04-2023 | 04:30 PM | Active | View |
42. | Store handling at Mine store of Gumgaon Mine(AGENT/GM/MECH/22-23/1852) | 21-03-2023 | 04-04-2023 | 04-04-2023 | 04-04-2023 | 04:00 PM | Active | View |
43. | Construction of canteen building at Gumgaon Mine.(MOIL/23-24/ET/14) | 21-03-2023 | 20-04-2023 | 20-04-2023 | 20-04-2023 | 03:30 PM | Active | View |
44. | Construction of Cement Concrete Platform at Railway Siding at Tirodi Mine.(MOIL/23-24/ET/13) | 21-03-2023 | 24-04-2023 | 24-04-2023 | 24-04-2023 | 03:30 PM | Active | View |
45. | Construction of Bituminous Tar road in industrial premises and residential quarters of ukwa Mine.(MOIL/23-24/ET/11) | 21-03-2023 | 20-04-2023 | 20-04-2023 | 20-04-2023 | 03:30 PM | Active | View |
46. | Construction of two Nos. Switch room Building for East and West ventilation fan at ukwa Mine.(MOIL/23-24/ET/8) | 21-03-2023 | 20-04-2023 | 20-04-2023 | 20-04-2023 | 03:30 PM | Active | View |
47. | Landscaping and Beautification works at new colony A type quarters at Ukwa mine.(MOIL/23-24/ET/4) | 21-03-2023 | 20-04-2023 | 20-04-2023 | 20-04-2023 | 03:30 PM | Active | View |
48. | Renovation of existing School building at Ukwa Mine.(MOIL/23-24/ET/3) | 21-03-2023 | 20-04-2023 | 20-04-2023 | 20-04-2023 | 03:30 PM | Active | View |
49. | Construction of RCC Circular GSR-01 No of one lakh liter capacity at CH 250 feet level and one RCC Elevated Rectangular tank of one lakh Liter capacity for vertical Shaft at Chikla Mine.(MOIL/23-24/ET/1) | 21-03-2023 | 20-04-2023 | 20-04-2023 | 20-04-2023 | 03:30 PM | Active | View |
50. | FABRICATION OF STEEL MANWAY CHUTE 1.5MTR FOR KANDRI MINE(Agent/Gr-III/Mech/22-23/3676) | 20-03-2023 | 27-03-2023 | 27-03-2023 | 27-03-2023 | 04:30 PM | Active | View |
51. | for Fabrication of Steel Manways Chute 1.5 Mtrs Dia for Gumgaon Mine(AGENT/GM/MECH/22-23/1835) | 20-03-2023 | 29-03-2023 | 29-03-2023 | 29-03-2023 | 04:30 PM | Active | View |
52. | Major Overhauling of Cummins Make 6B 5.9 150C Engine Assy of Eimco Elecon Loader No. of Balaghat Mine(AGT/BGT/MECH/EE/22-23/1632) | 20-03-2023 | 27-03-2023 | 27-03-2023 | 27-03-2023 | 04:30 PM | Active | View |
53. | Requirement of spares of Vibrating feeder Model OA/1275X750 ASU10X for MOIL Ltd. Chikla Mine.(TE/CH/MECH/22-23/10007595/1427 date 19.03.2023) | 20-03-2023 | 03-04-2023 | 03-04-2023 | 03-04-2023 | 03:30 PM | Active | View |
54. | Fabrication of Steel Cradle Assembly and Misc. Items for Joplin Jig Section of OCF of Balaghat Mine.(AGT/BGT/MECH/22-23/1626) | 18-03-2023 | 04-04-2023 | 04-04-2023 | 04-04-2023 | 04:30 PM | Active | View |
55. | Cleaning Maintenance and Up keeping of Rest House at Kandri Mine(KD/MINES/NIT/2022-23/3621) | 18-03-2023 | 24-03-2023 | 24-03-2023 | 24-03-2023 | 04:30 PM | Active | View |
56. | Laying of 6 and 4 inch G.I Pipe Lines for Compressed Air supply in underground levels at Balaghat Mine(AGT/BGT/MECH/PIPE/22-23/1622) | 17-03-2023 | 03-04-2023 | 03-04-2023 | 03-04-2023 | 04:30 PM | Active | View |
57. | Schedule Maintenance and General inspection of Rigid Guide Rails of Holmes shaft cage and Production shaft winder of Balaghat Mine for the period of one year(AGENT/BGT/MECH/WIN/22-23/1621) | 17-03-2023 | 03-04-2023 | 03-04-2023 | 03-04-2023 | 04:30 PM | Active | View |
58. | Construction of waste water drain at mahadeo chowk at tirodi mine(TRD/CIVIL/22-23/1623 DATED 16/03/2023) | 17-03-2023 | 24-03-2023 | 24-03-2023 | 24-03-2023 | 04:00 PM | Active | View |
59. | PURCHASE OF CS WHEEL ASSEMBLY WITH BEARING COVER 30 NOS FOR 4 MT GB CAR IN UNDERGROUND AT BALAGHAT MINE(PUR/MOIL/BGT/GB CAR/22-23/1611) | 16-03-2023 | 21-03-2023 | 21-03-2023 | 21-03-2023 | 04:30 PM | Active | View |
60. | Fabrication of Pneumatic Actuators Valves of Air Pulsating Jig for I.M.B Plant at Balaghat Mine.(AGT/BGT/MECH/IMB/22-23/1615) | 16-03-2023 | 17-04-2023 | 17-04-2023 | 17-04-2023 | 04:30 PM | Active | View |
61. | PROCUREMENT OF CARRYING, IMPACT AND RETURN ROLLERS FOR CONVEYOR BELTS AT IMB PLANT BALAGHAT MINE(PUR/MOIL/BGT/ROLLER/22-23/1616) | 16-03-2023 | 04-04-2023 | 04-04-2023 | 04-04-2023 | 04:30 PM | Active | View |
62. | Construction of Foundation and allied works for mounting acid tank for EMD Plant, Dongribuzurg Mine.(DB/CIVIL/NIT/TE/2022-23/3707 Dt 14.03.2023) | 15-03-2023 | 24-03-2023 | 24-03-2023 | 24-03-2023 | 04:30 PM | Active | View |
63. | Concreting Works infront of MCC and Rectifier Room including construction of chambers and deepening and widening of drain for streamlining drainage issues inside EMD Plant Premises at Dongribuzurg Mine.(DB/EMD/CIVIL/NIT/TE/22-23/3706 14.03.23) | 15-03-2023 | 24-03-2023 | 24-03-2023 | 24-03-2023 | 04:30PM | Active | View |
64. | Removal of Garbage, Cleaning of Drains and Septic Tanks including collection of Garbage for Camp Colonies i.e. Syndicate Camp, Chandmara Colony and Officers Colony of Dongribuzurg Mine(DB/WELFARE/NIT/TE/2022-23/3705 Dt 14.03.23) | 15-03-2023 | 24-03-2023 | 24-03-2023 | 24-03-2023 | 04:30 PM | Active | View |
65. | Procurement of Brake Tie Rod Set i.e Horizontal and Vertical rod for 350 HP Holmes Shaft Cage winder at Balaghat Mine(AGT/BGT/MECH/WIN/22-23/1541) | 15-03-2023 | 06-04-2023 | 06-04-2023 | 06-04-2023 | 04:30 PM | Active | View |
66. | Secondry Recovery of UKL 471 AT CH 9500 SECTION(AGT/CIVIL/UK/LT/2022-23/1604 Date- 14.03.2023) | 15-03-2023 | 23-03-2023 | 23-03-2023 | 23-03-2023 | 4:30 PM | Active | View |
67. | PLANTATION WITHIN 7.5M BARRIER OF LEASE BOUNDRAY OF NEW CABLE DUMP AT TIRODI MINE(TRD/CIVIL/22-23/1568 DATE 06.03.2023) | 15-03-2023 | 23-03-2023 | 23-03-2023 | 23-03-2023 | 04:30 PM | Active | View |
68. | Construction of rcc retaining wall near at 50/52 are at tirodi mine(TRD/CIVIL/22-23/1582DATE 10.03.2023) | 15-03-2023 | 23-03-2023 | 23-03-2023 | 23-03-2023 | 04:30 PM | Active | View |
69. | Disposal of Disposable Hazardous Waste of used Filter element and Hoses.(DB/MECH/22-23/AGENT/1411) | 15-03-2023 | 18-03-2023 | 18-03-2023 | 18-03-2023 | 04:30 PM | Active | View |
70. | REPAIR AND REWINDING OF 15HP SUBMERSIBLE PUMP AND 10HP DC SERIES WOUND MOTOR OF BALAGHAT MINE(BGT/TE/ELECT/AJGM/22-23/1614) | 15-03-2023 | 23-03-2023 | 23-03-2023 | 23-03-2023 | 03:00 PM | Active | View |
71. | PROVIDING, SUPPLYING OF DIFFERENT SIZE OF LADDER FOR CARRYING OUT ELECTRICAL WORK IN SURFACE AND UG.(BGT/TE/ELECT/AJGM/22-23/1596) | 14-03-2023 | 21-03-2023 | 21-03-2023 | 21-03-2023 | 03:30 PM | Active | View |
72. | Security guards in Diamond Drilling site for Sandvik DE-710 Balaghat Mine.(MINING/BGT/LT/AGT/2022-23/1591 DT.13.03.2023) | 13-03-2023 | 20-03-2023 | 20-03-2023 | 20-03-2023 | 04:30 PM | Active | View |
73. | Repair of existing khosala compressor house building and water proofing of Electrical substation at First vertical shaft premises at Chikla Mine.(Civil/CH/TE/22-23/1407 Date-13.03.2023) | 13-03-2023 | 27-03-2023 | 27-03-2023 | 27-03-2023 | 04:30 PM | Active | View |
74. | Providing and Fixing of profile sheet on Pit Office front shed at Gumgoan Mine.(AGT/GUM/CIVIL/LT/22-23/ 2803 DT 10/03/2023) | 11-03-2023 | 18-03-2023 | 18-03-2023 | 18-03-2023 | 04:30 PM | Active | View |
75. | Handling reported complaints of repairing rewiring of electrical wiring of residential nonresidential quarter of Gumgaon mine.(GUM/ELECT/22-23/2827 Dt 11.03.2023) | 11-03-2023 | 18-03-2023 | 18-03-2023 | 18-03-2023 | 04:30 PM | Active | View |
76. | Outsourcing of Mechanical Maintenance work of Ferro Manganese Plant during shutdown period for Furnace relining work of FMP, Balaghat Mine for a period of 45 days.(AGT/FMP/MECH/22-23/337) | 10-03-2023 | 16-03-2023 | 16-03-2023 | 16-03-2023 | 04:30 PM | Active | View |
77. | Power supply arrangement for 15HP screen plant at OCF dump at Gumgaon mine(GUM/ELECT/22-23/2808 DT 10.03.2023) | 10-03-2023 | 18-03-2023 | 18-03-2023 | 18-03-2023 | 04:30 PM | Active | View |
78. | PROVIDING SUPPLYING OF RESTRICTED NEUTRAL SYSTEM FOR 1600KVA, 1000KVA, 500KVA 11KV/433V TRANSFORMERS FOR BALAGHAT MINE(BGT/TE/ELECT/AJGM/22-23/1581) | 10-03-2023 | 17-03-2023 | 17-03-2023 | 17-03-2023 | 03:30 PM | Active | View |
79. | Purchase of 11KV HT Metering Cubicle for Dongri Buzurg Mine(DB/ELECT/22-23/1386) | 09-03-2023 | 15-03-2023 | 15-03-2023 | 15-03-2023 | 04:30 PM | Active | View |
80. | Purchase Of NGR panel for Dongri Buzurg Mine(DB/ELECT/22-23/1387) | 09-03-2023 | 21-03-2023 | 21-03-2023 | 21-03-2023 | 04:30 PM | Active | View |
81. | Upgradation of CCTV system installed at Kalaphata Sand Ghat and weigh bridge at Kandri Mine(TE Kan Elect 1704) | 08-03-2023 | 11-03-2023 | 11-03-2023 | 11-03-2023 | 04:30 PM | Active | View |
82. | Empanelment of advertising agencies(MOIL/22-23/ET/75) | 08-03-2023 | 06-04-2023 | 06-04-2023 | 06-04-2023 | 03:30 PM | Active | View |
83. | Purchase of Contact Shoe(MOIL/22-23/ET-100 08/03/2023) | 08-03-2023 | 28-03-2023 | 28-03-2023 | 29-03-2023 | 03:30 PM | Active | View |
84. | Providing 10 mbps 1 is to 1 Internet Leased Line at Kandri Mine(ADGM/GrpIIISYS/NW/2022-23/1766) | 07-03-2023 | 14-03-2023 | 14-03-2023 | 14-03-2023 | 04:00 PM | Active | View |
85. | Cleaning and Collection of Garbage and Cleaning of Drains Cleaning and collecting waste from septic tanks chambers at Kandri Mine(KD/PER/NIT/2022-23/3562) | 06-03-2023 | 11-03-2023 | 11-03-2023 | 11-03-2023 | 04:30 PM | Active | View |
86. | Construction of RCC foundation for installation of weigh bridge at Pathari sand Ghat for supply of sand at Chikla Mine.(Civil/CH/TE/22-23/1341) | 06-03-2023 | 20-03-2023 | 20-03-2023 | 20-03-2023 | 04:30 PM | Active | View |
87. | Providing and fixing of Chain link fencing at 33 11 kv substation at Ukwa Mine(AGT/CIVIL/UK/LT/2022-23/1544 Date- 04.03.2023) | 06-03-2023 | 16-03-2023 | 16-03-2023 | 16-03-2023 | 04:30 PM | Active | View |
88. | Removal of Waste Mitti and transport of o/c Dump material at Ukwa Mine(AGT/Min/UK/LT/2022-23/1563 Date- 06.03.2023) | 06-03-2023 | 16-03-2023 | 16-03-2023 | 16-03-2023 | 04:30 PM | Active | View |
89. | Hoisting of tubs through vertical shaft at Gumgaon Mine(Agent/Gum/Min/21-22/1773) | 06-03-2023 | 13-03-2023 | 13-03-2023 | 13-03-2023 | 05:45 PM | Active | View |
90. | Pushing of tubs from LHD faces in 300L at Gumgaon Mine(Agent/Gum/Min/21-22/1771) | 06-03-2023 | 13-03-2023 | 13-03-2023 | 13-03-2023 | 05:15 PM | Active | View |
91. | Transportation of Tubs in Surface and Underground at Gumgaon Mine(Agent/Gum/Min/21-22/1772) | 06-03-2023 | 13-03-2023 | 13-03-2023 | 13-03-2023 | 05:45 PM | Active | View |
92. | Operation of pumps for drinking water supply at Munsar mine(MUN/CIVIL/NIT/22-23/292 DT 04/03/2023) | 06-03-2023 | 11-03-2023 | 11-03-2023 | 11-03-2023 | 04:30 PM | Active | View |
93. | Fabrication of Single Acting Hydraulic Cylinder 4 Nos. for the Service Brakes of Holmes Shaft Skip Winder and Production Shaft Winder of Balaghat Mine(AGT/BGT/MECH/22-23/1538) | 04-03-2023 | 20-03-2023 | 20-03-2023 | 20-03-2023 | 04:30 PM | Active | View |
94. | Providing and Fitting of Non Contact Type Temperature Sensors along with the Data Log Module for displaying the operating temperature of white metal pedestal of Holmes Shaft Skip Winder(AGT/BGT/MECH/22-23/1539) | 04-03-2023 | 27-03-2023 | 27-03-2023 | 27-03-2023 | 04:30 PM | Active | View |
95. | Fabrication of Pump Spares by Pattern Making, Casting and Machining work for 300 HP MaxFlow Make Multistage Pump of 8th Level at Balaghat Mine(AGENT/BGT/MECH/PUMP/22-23/1540) | 04-03-2023 | 20-03-2023 | 20-03-2023 | 20-03-2023 | 04:30 PM | Active | View |
96. | WEBSITE SINGLE PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR WILO MATHER AND PLATT MAKE PUMP(PUR/MOIL/C-5/28/E-25/330-M Dt.03/03/2023) | 03-03-2023 | 24-03-2023 | 24-03-2023 | 24-03-2023 | 03:30 PM | Active | View |
97. | Annual Maintenance Contract for replacement of Boiler tubes of FBC Boiler at EMD Plant, D.B.Mine.(MOIL/DB/EMD/ADGM/22-23/1365) | 02-03-2023 | 16-03-2023 | 16-03-2023 | 16-03-2023 | 04:30 PM | Active | View |
98. | Maintenance of Garden at Munsar Mine(MUN/CIVIL/NIT/22-23/286 DT 25/02/2023) | 02-03-2023 | 04-03-2023 | 04-03-2023 | 04-03-2023 | 04:30 PM | Active | View |
99. | Cable Bolting operation by contractual means(Agent/Gum/Min/22-23/1740) | 01-03-2023 | 08-03-2023 | 08-03-2023 | 08-03-2023 | 04:30 PM | Active | View |
100. | Major repairing of Track chain assembly (LH and RH side) for TATA Hitachi Make Hydraulic Excavator Xasis-220(Mech/Mun/22-23/ 1712) | 01-03-2023 | 08-03-2023 | 08-03-2023 | 08-03-2023 | 04:30 PM | Active | View |
Tenders More Information |
---|
Contracts finalised on nomination basis Details of Purchase Order issued by MATERIALS DEPARTMENT valuing Rs.30.00 Lakhs & Above
List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website) |
View (2024) Year Tenders |
View (2023) Year Tenders |
View (2022) Year Tenders |
View (2021) Year Tenders |
View (2020) Year Tenders |
View (2019) Year Tenders |
View (2018) Year Tenders |
View (2017) Year Tenders |
View (2016) Year Tenders |
View (2015) Year Tenders |
View (2014) Year Tenders |
View (2013) Year Tenders |
View (2012) Year Tenders |
View (24) Year Tenders |
View Full Tender Archive |
See all MOIL tender. |