Tender Archive
S.No. | Title | Issue Start Date | Issue Last Date | Submission Last Date | Opening Date | Opening Time | Status | View |
---|---|---|---|---|---|---|---|---|
1. | Procurement of 1 no. Elecrically Operated Mono- block pump for IMB Plant at Dongri Buzurg mine(PUR/DB/20-21/ 277) | 15-06-2020 | 10-07-2020 | 10-07-2020 | 10-07-2020 | 04:30 PM | Active | View |
2. | Terrace water proofing to RCC slab of old B type quarters 05 blocks at Chikla Mine(MOIL/20-21/ET/47) | 15-06-2020 | 27-07-2020 | 27-07-2020 | 27-07-2020 | 03:30 PM | Active | View |
3. | Maintenance and Operation of Sewage Treatment Plant at Munsar Mine.(MOIL/20-21/ET/50) | 15-06-2020 | 27-07-2020 | 27-07-2020 | 27-07-2020 | 03:30 PM | Active | View |
4. | Providing and fixing heat guard (Cool roof) for work shop building of Munsar Mine.(MOIL/20-21/ET/51) | 15-06-2020 | 27-07-2020 | 27-07-2020 | 27-07-2020 | 03:30 PM | Active | View |
5. | Construction of Security watch tower (2 nos) for surveillance and strengtheing of internal security at Kandri Mine(MOIL/20-21/ET/52) | 15-06-2020 | 31-07-2020 | 31-07-2020 | 31-07-2020 | 03:30 PM | Active | View |
6. | Operation of pumps for drinking water supply at Wahitola, Kaichi and Chargaon camp at Munsar Mine(MOIL/20-21/ET/48) | 15-06-2020 | 27-07-2020 | 27-07-2020 | 27-07-2020 | 03:30 PM | Active | View |
7. | Concreting of x-cut between Ch.34 to Ch.42 at -300 Level for stope preparation at Gumgaon Mine(MOIL/20-21/ET/63) | 15-06-2020 | 15-07-2020 | 15-07-2020 | 15-07-2020 | 03:30 PM | Active | View |
8. | Additional excavation in manganiferous rock between Ch.37 to Ch.42 at -300 Level at Gumgaon Mine(MOIL/20-21/ET/64) | 15-06-2020 | 30-06-2020 | 30-06-2020 | 30-06-2020 | 03:30 PM | Active | View |
9. | Underground development at 9th Level and 8th Level North at Balaghat Mine(MOIL/20-21/ET/61) | 15-06-2020 | 15-07-2020 | 15-07-2020 | 15-07-2020 | 03:30 PM | Active | View |
10. | Additional excavation in Mangeniferous rock at 1750 Level and 1650 Level at Ukwa Mine(MOIL/20-21/ET/62) | 15-06-2020 | 15-07-2020 | 15-07-2020 | 15-07-2020 | 03:30 PM | Active | View |
11. | Maintenance and Operation of Solid waste Management plant at Munsar Mine.(MOIL/20-21/ET/49) | 15-06-2020 | 27-07-2020 | 27-07-2020 | 27-07-2020 | 03:30 PM | Active | View |
12. | Construction of New Administrative building including compound wall and vehical parking shed at Kandri Mine(MOIL/20-21/ET/53) | 15-06-2020 | 31-07-2020 | 31-07-2020 | 31-07-2020 | 03:30 PM | Active | View |
13. | Repairing of RCC roof of Laboure and staff quarters of Gudma Camp colony ,prem Nagar(AGT/Civil/UK/LT/20-21/224) | 13-06-2020 | 20-06-2020 | 20-06-2020 | 20-06-2020 | 04:30 PM | Active | View |
14. | TRANSPORTATION OF 538 MT OF BOTTOM FLY ASH FROM ADANI POWER PLANT, TIRORA TO CHIKLA MINE FOR UNDERGROUND BACKFILLING WORKS.(TE-04 Dt.13062020) | 13-06-2020 | 25-06-2020 | 25-06-2020 | 25-06-2020 | 04:00 PM | Active | View |
15. | Dewatering of Satak open pit during rainy season(Bel/Mech/NIT/2020/445 Dated 10.06.2020) | 12-06-2020 | 22-06-2020 | 22-06-2020 | 22-06-2020 | 03:30 PM | Active | View |
16. | Operation of pump at Beldongri Mine during Monsoon(Bel/Mech/NIT/2020/444 Dated 10.06.2020) | 12-06-2020 | 22-06-2020 | 22-06-2020 | 22-06-2020 | 03:30 PM | Active | View |
17. | TWO BID SYSTEM FOR PURCHASE OF Failsafe Electro Hydraulic Thruster Brake suitable for 250HP motor FOR KANDRI MINE.(PUR/MOIL/GR.III/KD/2020-21/335) | 12-06-2020 | 30-06-2020 | 30-06-2020 | 30-06-2020 | 04:30 PM | Active | View |
18. | Extension of existing coal shed at EMD plant premises at Dongri Buzurg mine(DB/Civil/20-21/220 Date 01/06/2020) | 11-06-2020 | 20-06-2020 | 20-06-2020 | 20-06-2020 | 04:30 PM | Active | View |
19. | Deployment of 02 Nos Sweepers for Miscellaneous cleaning works at Ukwa Mine(AGT/CIVIL/UK/LT/20-21/187) | 11-06-2020 | 20-06-2020 | 20-06-2020 | 22-06-2020 | 04:30 PM | Active | View |
20. | Providing and fixing aluminium sliding windows at Mine Office at Dongri Buzurg Mine.(DB/Civil/20-21/381 Date 29/05/2020) | 11-06-2020 | 19-06-2020 | 19-06-2020 | 19-06-2020 | 04:30 PM | Active | View |
21. | Replacement of old damaged steel doors with new steel doors at Dongri Buzurg Mine(DB/Civil/20-21/219 Date 01/06/2020) | 11-06-2020 | 23-06-2020 | 23-06-2020 | 23-06-2020 | 04:30 PM | Active | View |
22. | ELECTRIC WINCH FOR PULLING OF TUB FROM ORE DISCHARGE CHUTE UPTO CAGES AT -330L UNDERGROUND AT MUNSAR MINE(ADGM (Mines)/Grp-III/2020-21/344) | 09-06-2020 | 24-06-2020 | 24-06-2020 | 24-06-2020 | 03:30 PM | Active | View |
23. | Proposal for outsourcing manpower for daily electrical maintenance work at Tirodi Mine.(TRD/EL./20-21/7400004572/373 Dated 05.06.2020) | 08-06-2020 | 30-06-2020 | 30-06-2020 | 30-06-2020 | 03:30 PM | Active | View |
24. | Engine Overhauling of L and T Loader 9020 Sr No AD0055 operating at Dongri Buzurg Mine.(DB/MECH/20-21/JGM(MECH)/235) | 08-06-2020 | 16-06-2020 | 16-06-2020 | 16-06-2020 | 04:30 PM | Active | View |
25. | TENDER DOCUMENTS FOR PROVIDING SUPPLYING OF RESTRICTED NEUTRAL SYSTEM FOR 1000KVA AND 500KVA, 11KV/433V TRANSFORMERS OF MUNSAR MINE(ELECT/MUN/ADGM/20-21/334) | 08-06-2020 | 17-06-2020 | 17-06-2020 | 17-06-2020 | 03:30 PM | Active | View |
26. | DRILLING OF BORE HOLE 110 MM DIAMETER FROM 8TH TO 11 LEVEL FOR LAYING OF ELECTRICAL POWER CABLE AT PRODUCTION SHAFT IN UNDERGROUND AT BALAGHAT MINE(AGENT/MECH/B-HOLE/20-21/199) | 06-06-2020 | 17-06-2020 | 17-06-2020 | 17-06-2020 | 04:30 PM | Active | View |
27. | Grass thatching of Bunglow No. 01 (Mine Manager Bunglow) at Tirodi Mine.(TRD/CIVIL/20-21/361) | 06-06-2020 | 10-06-2020 | 10-06-2020 | 11-06-2020 | 05:30 PM | Active | View |
28. | Proposal for errection of new L.T. Line at Sitapatore Mine.(TRD/EL./20-21/7400004314/374 Dated 05.06.20) | 06-06-2020 | 27-06-2020 | 27-06-2020 | 27-06-2020 | 03:30 PM | Active | View |
29. | Purchase of FRP TRANSLUCENT ROOF SHEET-400 Nos(MOIL/20-21/ET-60 dt.05.06.2020) | 05-06-2020 | 29-06-2020 | 29-06-2020 | 30-06-2020 | 03:30 PM | Active | View |
30. | Construction of foundation for Chimney for 1500 KVA DG Set at Second vertical Shaft at Chikla mine.(CH/Civil/2020-21/316 date 01.06.2020) | 04-06-2020 | 13-06-2020 | 13-06-2020 | 13-06-2020 | 03:30 PM | Active | View |
31. | PURCHASE OF VIBRATING FEEDER COMPLETE WITH DRIVE, MAKE-ENESTEE ENGINEERING LTD., MODEL-E-VF-1016-001- 1 NO. FOR BALAGHAT MINE (M.P) (AS PER ANNEXURE A ENCLOSED)(PUR/MOIL/C-4/239/E-3/35-M DT.03/06/2020) | 04-06-2020 | 24-06-2020 | 24-06-2020 | 24-06-2020 | 03:30 PM | Active | View |
32. | PURCHASE OF WHEEL AND EXCEL ASSEMBLY WITH GEARBOX COMPLETE WITHOUT MOTOR - 1 SET, MAKE- M/S OVIS EQUIPMENT PVT.LTD., HYDERABAD, MODEL- 4 TON BATTERY OPERATED LOCOMOTIVE (SR.NO.603 AND 582) OPERATING AT BALAGHAT MINE(M.P) (AS PER ANNEXURE A ENCLOSED)(PUR/MOIL/C-4/4/E-4/36-M DT.03/06/2020) | 04-06-2020 | 24-06-2020 | 24-06-2020 | 24-06-2020 | 03:30 PM | Active | View |
33. | DRILLING OF BORE HOLE 110 MM DIAMETER FROM 8TH TO 11 LEVEL FOR LAYING OF ELECTRICAL POWER CABLE AT PRODUCTION SHAFT IN UNDERGROUND AT BALAGHAT MINE(AGENT/BGT/B-HOLE/20-21/188) | 04-06-2020 | 15-06-2020 | 15-06-2020 | 15-06-2020 | 04:30 PM | Active | View |
34. | Providing and installation of Effluent Treatment Plant in work shop area at Chikla Mine.(CH/Civil/2020-21/211 date 16.05.2020) | 03-06-2020 | 10-06-2020 | 10-06-2020 | 10-06-2020 | 03:30 PM | Active | View |
35. | purchase of Pneumatically Operated Double Diaphragm Pumps for Various Mines - 10 Nos. (2 Lots)(WE-13(ET-57) DT.01/06/2020) | 02-06-2020 | 24-06-2020 | 24-06-2020 | 25-06-2020 | 03:30 PM | Active | View |
36. | Obtaining Final Forest Clearance from Ministry of Environment, Forest and Climate Change over an area of 150.586 Ha., 3.986 Ha. and 4.734 Ha. within Mining lease of Tirodi, Ukwa and Sitapatore respectively(MOIL/20-21/ET/27) | 02-06-2020 | 01-07-2020 | 01-07-2020 | 01-07-2020 | 03:30 PM | Active | View |
37. | Supply of Medicines 235 items(PUR/MOIL/C-10/35/WE-06/ET/59) | 02-06-2020 | 09-07-2020 | 09-07-2020 | 10-07-2020 | 03:30 PM | Active | View |
38. | PURCHASE OF MOTOROLA MAKE MOTOTRBO SLR 5300 REPEATER ALONG WITH ACCESSORIES FOR DONGRI BUZURG MINE(DB/ELECT/20-21/211) | 01-06-2020 | 26-06-2020 | 26-06-2020 | 26-06-2020 | 04:30 PM | Active | View |
39. | TENDER DOCUMENTS FOR SUPPLYING OF DGMS APPROVED FLP GATE END BOX FOR LHD, WITH ALL ACCESSORIES MUNSAR MINE 1 NO(ELECT/MUN/ADGM/20-21/269) | 01-06-2020 | 22-06-2020 | 22-06-2020 | 22-06-2020 | 03:30 PM | Active | View |
40. | Purchase of SULPHURIC ACID with Transportation-400 MT(MOIL/20-21/ET-58 dt.01.06.2020) | 01-06-2020 | 22-06-2020 | 22-06-2020 | 23-06-2020 | 03:30 PM | Active | View |
41. | Purchase of Cement Injection Pump Sets for Various Mines - 15 Nos.(2 Lots) (Only Through e-procurement)(WE-12(ET-56) DT.01/06/2020) | 01-06-2020 | 29-06-2020 | 29-06-2020 | 30-06-2020 | 03:30 PM | Active | View |
42. | Requirement of manpower for collection of canteen food items and serving it to mine employees at Chikla Mine(MOIL/20-21/ET/29) | 30-05-2020 | 29-06-2020 | 29-06-2020 | 29-06-2020 | 03:30 PM | Active | View |
43. | Purchase of Handheld XRF Machine for Head office, Nagpur(M.S) 2 Nos. (1 Lot) (Only Through e-procurement)(WE-7(ET-55) DT.30/05/2020) | 30-05-2020 | 22-06-2020 | 22-06-2020 | 23-06-2020 | 03:30 PM | Active | View |
44. | Request for Empanelment (RFE) For Empanelment of Consultant/ Transaction Advisor(MOIL/RFE/CTA/20-21) | 28-05-2020 | 18-06-2020 | 18-06-2020 | 24-06-2020 | 11:30 AM | Active | View |
45. | Replacement of sheave wheel 1 No at Kandri Mine(A-III/KAN/20-21/228) | 27-05-2020 | 13-06-2020 | 13-06-2020 | 15-06-2020 | 04:30 PM | Active | View |
46. | Exploratory core drilling in ML area of Lugma village, ThParaswada, DistBalaghat over an area of 48.974 Ha(MOIL/20-21/ET/28) | 27-05-2020 | 26-06-2020 | 26-06-2020 | 26-06-2020 | 03:30 PM | Active | View |
47. | Repairing of approach road from PWD road to New satak Mine at Beldongri MINE(Civil/Bel/20-21/310 Date 21/05/2020) | 26-05-2020 | 02-06-2020 | 02-06-2020 | 02-06-2020 | 04:30 PM | Active | View |
48. | Loading transportation and unloading of Manganese ore ROM at Beldongri Mine(Min/BEL/20-21/299 dATE 20.05.2020) | 25-05-2020 | 28-05-2020 | 28-05-2020 | 28-05-2020 | 04:30 PM | Active | View |
49. | Digging screening and stacking of fines from various places at Beldongri Mine(Min/BEL/20-21/309 Date 21.05.2020) | 25-05-2020 | 28-05-2020 | 28-05-2020 | 28-05-2020 | 04:30 PM | Active | View |
50. | Cleaning of drain sewer lines of camp colonies of Balaghat Mine(Civil/BGT/LT/2020-21/140) | 25-05-2020 | 04-06-2020 | 04-06-2020 | 04-06-2020 | 04:30 PM | Active | View |
51. | Procurement of Electrical C class material for Balaghat Mine(BGT/ELECT/20-21/130) | 23-05-2020 | 12-06-2020 | 12-06-2020 | 12-06-2020 | 04:30 PM | Active | View |
52. | Providing, supplying and installation of Neutral grounding resistance and monitoring relay on 11kV/3.3kV surface transformer at Balaghat Mine.(BGT/ELECT/20-21/131) | 23-05-2020 | 16-06-2020 | 16-06-2020 | 16-06-2020 | 04:30 PM | Active | View |
53. | CONSTRUCTION OF PARTITION WALLS FOR NEW OCF AT MUNSAR MINE.(MUN/CIVIL/NIT/20-21/22 DT 23.05.2020) | 23-05-2020 | 30-05-2020 | 30-05-2020 | 30-05-2020 | 04:30 PM | Active | View |
54. | Repairing of Bucket cylinder and Arm Cylinder of LT make CK300 3 Hyd Excavator of Dongri Buzurg Mine.(DB/MECH/20-21/JGM(MECH)/167) | 22-05-2020 | 09-06-2020 | 09-06-2020 | 09-06-2020 | 04:30 PM | Active | View |
55. | Fabrication of Steel Ore-Passes and Manways for Underground Mines i.e. Balaghat, Ukwa, Chikla, Beldongri, Munsar, Kandri and Gumgaon Mine(MOIL/20-21/ET/26) | 22-05-2020 | 22-06-2020 | 22-06-2020 | 22-06-2020 | 03:30 PM | Active | View |
56. | Repairing and Rewinding of 2 Nos. 1000KVA, 33KV/11KV, Outdoor type Oil Cooled Power transformers of Main Electrical Substation at Ukwa Mine(MOIL/20-21/ET/24) | 22-05-2020 | 22-06-2020 | 22-06-2020 | 22-06-2020 | 03:30 PM | Active | View |
57. | Supply, Installation and Commissioning of Elevators in The Residential Towers (Two Nos.) at the CMS Compound, MOIL Ltd., Nagpur - 2 Nos.(2 Lots) (Only Through e-procurement)(WE-10(ET-46) DT.22/05/2020) | 22-05-2020 | 15-06-2020 | 15-06-2020 | 16-06-2020 | 03:30 PM | Active | View |
58. | Purchase of Instruments for Rock Mechanics Lab at Head office, Nagpur - 10 Items.(10 Lots) (Only Through e-procurement)(WE-9(ET-45) DT.22/05/2020) | 22-05-2020 | 11-06-2020 | 11-06-2020 | 12-06-2020 | 03:30 PM | Active | View |
59. | Repairing of LHS Track Chain Assy of TATAHitachi zx 450 Hyd Exc No.1 at Dongri Buzurg Mine.(DB/MECH/20-21/JGM(MECH)/168) | 21-05-2020 | 29-05-2020 | 29-05-2020 | 29-05-2020 | 04:30 PM | Active | View |
60. | Repairing of Bucket Assembly of TATAHitachi Zx450 Hyd Excavator No.1 at operating at Dongri Buzurg Mine.(DB/MECH/20-21/JGM(MECH)/169) | 21-05-2020 | 29-05-2020 | 29-05-2020 | 29-05-2020 | 04:30 PM | Active | View |
61. | Construction of barricade wall around open pits Gudma Chhitalwar Kasturi Chainage 1700 to 3500 at Ukwa Mine(MOIL/20.21/ET/43) | 21-05-2020 | 06-07-2020 | 06-07-2020 | 06-07-2020 | 03:30 PM | Active | View |
62. | Replacement of Buntons, Sollars, Platform, Ladder and Fencing of Jawahar Vertical Shaft at Chikla Mine(MOIL/20-21/ET/25) | 20-05-2020 | 19-06-2020 | 19-06-2020 | 19-06-2020 | 03:30 PM | Active | View |
63. | Tender for providing 6 mbps 1 is to 1 Internet Leased Line (ILL) at Beldongri Mine(ADGM/GrpIII/SYS/NW/2020-21/213) | 20-05-2020 | 29-05-2020 | 29-05-2020 | 29-05-2020 | 04:30 PM | Active | View |
64. | Limited Tender for Computer and peripherals (Printers, UPSs and LAN) Annual Maintenance Contract of Chikla AND Dongri Buzurg Mine(TE/CH/SYSTEM/AMC/2020-21/159) | 19-05-2020 | 06-06-2020 | 06-06-2020 | 06-06-2020 | 04:30 PM | Active | View |
65. | Underground concreting work to establish crosscut for preparation of Chute and manways at Chikla Mine(MOIL/20-21/ET/38) | 19-05-2020 | 19-06-2020 | 19-06-2020 | 19-06-2020 | 03:30 PM | Active | View |
66. | Loading of explosives from Magazine and unloading at different location of Tirodi mine(MOIL/20-21/ET/42) | 19-05-2020 | 19-06-2020 | 19-06-2020 | 19-06-2020 | 03:30 PM | Active | View |
67. | Making of stemming material Mug Plug used for blasting at Ukwa Mine(MOIL/20-21/ET/40) | 19-05-2020 | 19-06-2020 | 19-06-2020 | 19-05-2020 | 03:30 PM | Active | View |
68. | Filling and Spreading of waste rock generated through rock development in 300 L between Ch. 34 to Ch. 40 in Gumgaon Mine(MOIL/20-21/ET/37) | 19-05-2020 | 18-06-2020 | 18-06-2020 | 18-06-2020 | 03:30 PM | Active | View |
69. | Hiring of machinery for sub grade mineral reject of UG ROM handling from Magazine area at Kandri Mine(MOIL/20-21/ET/35) | 19-05-2020 | 18-06-2020 | 18-06-2020 | 18-06-2020 | 03:30 PM | Active | View |
70. | Transportation of bottom ash from Adani Power Plant, Tiroda to Ukwa Mine of M S MOIL Ltd. for stowing purpose(MOIL/19-20/ET/34) | 19-05-2020 | 18-06-2020 | 18-06-2020 | 18-06-2020 | 03:30 PM | Active | View |
71. | Retiling and Reroofing of Camp Quarters as Monsoon Preparatory Works at Kandri Mine.(Kan/Civil/NIT/2020-21/219 Date 17.05.2020) | 18-05-2020 | 23-05-2020 | 23-05-2020 | 23-05-2020 | 04:30 PM | Active | View |
72. | Cleaning of Storm Water Drain of Surface and Underground Sump at Kandri Mine.(Kan/Civil/NIT/2020-21/320 Date 17.05.2020) | 18-05-2020 | 23-05-2020 | 23-05-2020 | 23-05-2020 | 04:30 PM | Active | View |
73. | Hiring of Consultant for Estimation Drawings including working drawings and structural design for centralized store building with storage sheds yards and peripheral boundary wall at Balaghat Mine.(Civil/BGT/T E/2020-21/340) | 18-05-2020 | 01-06-2020 | 01-06-2020 | 01-06-2020 | 04:30 PM | Active | View |
74. | Hiring of structural Consultant services for Construction of foundation work for installation of new gear box and motor for Cage winder of Home shaft at Balaghat Mine(Civil/BGT/T E/2020-21/338) | 18-05-2020 | 01-06-2020 | 01-06-2020 | 01-06-2020 | 04:30 PM | Active | View |
75. | WEBSITE TENDER ENQUIRY IN ONE BID SYSTEM FOR RE-TILLING ROOF REPAIR INCLUDING LAYING OF POLYTHENE COVER OF CAMP QUARTER AT CHIKLA MINE.(TE-CH/CIVIL/20-21/210) | 18-05-2020 | 25-05-2020 | 25-05-2020 | 25-05-2020 | 03:30 PM | Active | View |
76. | WEBSITE TENDER ENQUIRY IN ONE BID SYSTEM FOR UNDERGROUND FILLING SPREADING AT -170 LEVEL AT CHIKLA MINE(TE-03 Dt.18052020) | 18-05-2020 | 28-05-2020 | 28-05-2020 | 28-05-2020 | 04:30 PM | Active | View |
77. | Renovation of Production Shaft by replacing Buntons at Balaghat Mine(MOIL/20-21/ET/23) | 18-05-2020 | 25-06-2020 | 25-06-2020 | 25-06-2020 | 03:30 PM | Active | View |
78. | Fencing of Electrical Switchyard beside existing Compressor House at Munsar Mine.(MUN/CIVIL/NIT/19-20/19 DT.16.05.2020) | 16-05-2020 | 23-05-2020 | 23-05-2020 | 23-05-2020 | 04:30 PM | Active | View |
79. | Maintenance and Upkeeping of ETP at EMD Plant,Dongri Mine 2020(MOIL/EMD/CH/Jt.GM/20-21/134) | 15-05-2020 | 26-05-2020 | 26-05-2020 | 26-05-2020 | 11:00 AM | Active | View |
80. | Removal of waste rock and handling the same by mechanized means in the F W benches between Ch. 20 to 50 at Dongri Buzurg Mine(MOIL/20-21/ET/30) | 15-05-2020 | 15-06-2020 | 15-06-2020 | 15-06-2020 | 03:30 PM | Active | View |
81. | Vertical development at 1750 Level and 1650 Level at Ukwa Mine(MOIL/20-21/ET/32) | 15-05-2020 | 15-06-2020 | 15-06-2020 | 15-06-2020 | 03:30 PM | Active | View |
82. | Vertical development at 1850 Level at Ukwa Mine(MOIL/20-21/ET/33) | 15-05-2020 | 15-06-2020 | 15-06-2020 | 15-06-2020 | 03:30 PM | Active | View |
83. | Picking and Collection of Ferro Grade 34 percent Mn. Lump Ore KD-4543 and 30 percent Mn. Lump ore KDL-435 from sub grade mineral reject of underground ROM at Kandri Mine(MOIL/20-21/ET/39) | 15-05-2020 | 22-05-2020 | 22-05-2020 | 22-05-2020 | 03:30 PM | Active | View |
84. | Removal of waste rock and handling the same by mechanized means in the F W benches between Ch. 20 to 50 at Dongri Buzurg Mine(MOIL/20-21/ET/30) | 15-05-2020 | 02-07-2020 | 02-07-2020 | 02-07-2020 | 03:30 PM | Active | View |
85. | Vertical development at 1850 Level at Ukwa Mine(MOIL/20-21/ET/33) | 15-05-2020 | 19-06-2020 | 19-06-2020 | 19-06-2020 | 03:30 PM | Active | View |
86. | REPAIRIRNG OF MATHER and PLATT AT 250HP CENTRIFUGAL PUMP NO 1 SR N 81237467/30/1 OPEARTING AT DONGRI BUZURG MINE(DB/MECH/Workshop/20-21/110) | 12-05-2020 | 05-06-2020 | 05-06-2020 | 05-06-2020 | 04:30 PM | Active | View |
87. | Procurement of Drill Pipe 89 mm for Di500 Drill Machine at DongriBuzurg mine(PUR/DB/20-21/109) | 12-05-2020 | 09-06-2020 | 09-06-2020 | 09-06-2020 | 04:30 PM | Active | View |
88. | WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR SAYAJI JAW CRUSHER(PUR/MOIL/C-5/30/E-02/38-M Dt. 11/05/2020) | 11-05-2020 | 15-06-2020 | 15-06-2020 | 15-06-2020 | 03:30 PM | Active | View |
89. | Engaging Housekeeping Agency for cleaning of MOIL Bhawan, CMD Bungalow, CMS premises etc(MOIL/20-21/ET/22) | 11-05-2020 | 11-06-2020 | 11-06-2020 | 11-06-2020 | 03:30 PM | Active | View |
90. | WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR SAYAJI JAW CRUSHER(PUR/MOIL/C-5/30/E-02/38-M Dt. 11/05/2020) | 11-05-2020 | 10-07-2020 | 10-07-2020 | 10-07-2020 | 03:30 PM | Active | View |
91. | Replacement of sheave wheel 1 No at Kandri Mine(A-III/KAN/20-21/228) | 08-05-2020 | 23-05-2020 | 23-05-2020 | 23-05-2020 | 04:30 PM | Active | View |
92. | PURCHASE OF COLD VULCANIZING SOLUTION AND HARDNER FOR JOINTING OF CONVEYOR BELTS AT BALAGHAT MINE(PUR/MOIL/BGT/IMB/20-21/78 dated 07.05.2020) | 08-05-2020 | 26-05-2020 | 26-05-2020 | 26-05-2020 | 04:30 PM | Active | View |
93. | Dismantling, shifting and reassembling of 20 Nos of Joplin jig assembly from old site to new shed constructed along the ferro plant of balaghat Mine(AGT/BGT/MECH/JIG/20-21/256) | 07-05-2020 | 15-05-2020 | 15-05-2020 | 15-05-2020 | 04:30 PM | Active | View |
94. | Construction of Shed over Sand Stowing Plant near DSU at Munsar Mine(Mun/Civil/NIT/2020-21/12 Date 06.05.2020) | 06-05-2020 | 16-05-2020 | 16-05-2020 | 16-05-2020 | 04:30 PM | Active | View |
95. | Providing Designing Fabrication Installation and commissioning of motorized gate for mine workshop at Chikla mine(TE-22 DT.02042020) | 06-05-2020 | 20-05-2020 | 20-05-2020 | 20-05-2020 | 04:30 PM | Active | View |
96. | Purchase of Undercarriage assemblies for HEMM.(MOIL/20-21/ET-31 dt.06.05.2020) | 06-05-2020 | 11-06-2020 | 11-06-2020 | 12-06-2020 | 03:30 PM | Active | View |
97. | Purchase of CEMENT-824 MT(MOIL/20-21/ET-41 dt.06.05.2020) | 06-05-2020 | 08-06-2020 | 08-06-2020 | 09-06-2020 | 03:30 PM | Active | View |
98. | PURCHASE OF BARE CENTRIFUGAL PUMP (MAKE- MAXFLOW PUMPS INDIA PVT.LIMITED, PUMP MODEL - 149HPB7R) - 1 NO. FOR BALAGHAT MINE(MP) (AS PER ANNEXURE - A ENCLOSED).(PUR/MOIL/C-4/78/E-1/35 -M DT.06/05/2020) | 06-05-2020 | 12-06-2020 | 12-06-2020 | 12-06-2020 | 03:30 PM | Active | View |
99. | Design, Manufacturing and Supply of 200 mm Butterfly valve Assy. without actuator for APIC Jig as per OEM Dimension along with material for I.M.B. plant.(AGT/BGT/MECH/IMB/20-21/71 Dated 04.05.2020) | 05-05-2020 | 05-06-2020 | 05-06-2020 | 05-06-2020 | 04:30 PM | Active | View |
100. | Laying of Paver Blocks from CC Road upto Administrative Building Entrance at Kandri Mine.(KAN/Civil/NIT/2020-21/214 Date 02.05.2020) | 04-05-2020 | 11-05-2020 | 11-05-2020 | 11-05-2020 | 04:30 PM | Active | View |
Tenders More Information |
---|
Details of Purchase Order issued by MATERIALS DEPARTMENT valuing Rs.30.00 Lakhs & Above List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website) |
View (2025) Year Tenders |
View (2024) Year Tenders |
View (2023) Year Tenders |
View (2022) Year Tenders |
View (2021) Year Tenders |
View (2020) Year Tenders |
View (2019) Year Tenders |
View (2018) Year Tenders |
View (2017) Year Tenders |
View (2016) Year Tenders |
View (2015) Year Tenders |
View (2014) Year Tenders |
View (2013) Year Tenders |
View (2012) Year Tenders |
View (205) Year Tenders |
View (24) Year Tenders |
View Full Tender Archive |
See all MOIL tender. |