Tender Archive
S.No. | Title | Issue Start Date | Issue Last Date | Submission Last Date | Opening Date | Opening Time | Status | View |
---|---|---|---|---|---|---|---|---|
1. | BLANKET RUNNING RATE CONTRACT UNDER MVC PROGRAM OF HP FOR SUPPLY OF TONERS/CARTRIDGES FOR HP MAKE PRINTER/ALL IN ONE PRINTER. (PUR-MOIL-C-12-1-E-26 dt. 24/07/2018) | 24-07-2018 | 08-08-2018 | 08-08-2018 | 08-08-2018 | 3:30 PM | Active | View |
2. | Procurement of LT Panel for colony substation at Chikla Mine (TE/CH/ELECT/18-19/288) | 24-07-2018 | 13-08-2018 | 13-08-2018 | 13-08-2018 | 4:30 PM | Active | View |
3. | REQUIREMENT OF EXTRA EXCAVATION AT -370L FOR RCC SUPPORT AT CHIKLA MINE (TE-11 Dt.23072018) | 23-07-2018 | 30-07-2018 | 30-07-2018 | 30-07-2018 | 4:30 PM | Active | View |
4. | Purchase of Traction Battery Chargers - 12 Nos. for various Mines (4 Lots) (Only Through e-procurement) (WE-65 DT.23/07/2018 (MOIL/18-19/ET/185)) | 23-07-2018 | 23-08-2018 | 23-08-2018 | 24-08-2018 | 3:30 PM | Active | View |
5. | Procurement of Insulation Tester kit (BGT/TE/Elect./18-19/433) | 23-07-2018 | 20-08-2018 | 20-08-2018 | 20-08-2018 | 4:30 PM | Active | View |
6. | Purchase of TCT Drill Rods - 4 Items (WE-12 DT.21.07.2018 (e-TenderNo.MOIL/18-19/ET/184)) | 21-07-2018 | 16-08-2018 | 16-08-2018 | 17-08-2018 | 3:30 PM | Active | View |
7. | Construction of store room for Diamond Drill department near Timber yard at Chikla Mine. (TE/CH/CIVIL/18-19/171 date 14/06/2018) | 19-07-2018 | 26-07-2018 | 26-07-2018 | 26-07-2018 | 3:30 PM | Active | View |
8. | WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES OF ENGINE FOR 1500 KVA DG SET, MAKE STERLING AND WILSON. (PUR/MOIL/C-5/47/E-25/406-M Dt. 19/07/2018) | 19-07-2018 | 10-08-2018 | 10-08-2018 | 10-08-2018 | 3:30 PM | Active | View |
9. | Purchase of Rubber Air Hoses (WE-64 DT.19.07.2018(e-Tender No.MOIL/18-19/ET/183)) | 19-07-2018 | 16-08-2018 | 16-08-2018 | 17-08-2018 | 3:30 PM | Active | View |
10. | Replacement of Buntons of Production Shaft(BGT/MECH/PS/18-19/ 2652) | 18-07-2018 | 30-07-2018 | 30-07-2018 | 30-07-2018 | 04:00 PM | Active | View |
11. | Purchase of Grinding Wheels(WE-63 DT.16.07.2018(E-Tender No.MOIL18-19/ET/182)) | 18-07-2018 | 09-08-2018 | 09-08-2018 | 10-08-2018 | 03:30 PM | Active | View |
12. | Maintenance and operation of water supply scheme at Chikla Mine (MOIL/18-19/ET/159) | 18-07-2018 | 23-08-2018 | 23-08-2018 | 23-08-2018 | 3:30 PM | Active | View |
13. | Construction of Sand stowing plant with 1 lakh litre capacity RCC water tank and Construction of GI sheet shade at 0 L platform at Vertical shaft of Gumgaon Mine (MOIL/18-19/ET/157 ) | 18-07-2018 | 23-08-2018 | 23-08-2018 | 23-08-2018 | 3:30 PM | Active | View |
14. | Construction of cement concrete road at industrial area premises and Construction of road side cement concrete drain at Gumgaon Mine (MOIL/18-19/ET/155 ) | 18-07-2018 | 23-08-2018 | 23-08-2018 | 23-08-2018 | 3:30 PM | Active | View |
15. | Providing, supplying of LED Tube fitting(BGT/TE/Elect./18-19/396) | 18-07-2018 | 13-08-2018 | 13-08-2018 | 13-08-2018 | 04:30 PM | Active | View |
16. | Design and Detailed engineering, supply, erection, commissioning and testing of rotary kiln including all accessories for Manganese Ore reduction at EMD Plant, Dongri Buzurg Mine(MOIL/18-19/ET/171) | 18-07-2018 | 17-08-2018 | 17-08-2018 | 17-08-2018 | 03:30 PM | Active | View |
17. | Removal of Pebbles generated during Sand stowing Periodat Balaghat Mine(Mining/BGT/T.E./2018-19/404) | 17-07-2018 | 23-07-2018 | 23-07-2018 | 23-07-2018 | 04:30 PM | Active | View |
18. | UnderGround Concreting at Balaghat Mine(Mining/BGT/T.E./2018-19/405) | 17-07-2018 | 23-07-2018 | 23-07-2018 | 23-07-2018 | 04:30 PM | Active | View |
19. | C I Ball Valve- 4 items(PUR-MOIL-C-1-202-WE-53-ET-181 dt.17/07/2018) | 17-07-2018 | 09-08-2018 | 09-08-2018 | 10-08-2018 | 03:30 PM | Active | View |
20. | Secondary recovery of dump ore from old dumps by excavation, segregation, loading, transportation, crushing and screening, loading and weighment and transportation up to various locations of all products at Ukwa Mine(MOIL/18-19/ET/156) | 17-07-2018 | 23-08-2018 | 23-08-2018 | 23-08-2018 | 03:30 PM | Active | View |
21. | a) Interior renovation work for old guest house, b) Strengthening of production shaft head gear foundation, c) Construction of metering room and compound wall beside MPPEB electrical S/S at Balaghat Mine(MOIL/18-19/ET/152) | 17-07-2018 | 14-08-2018 | 14-08-2018 | 14-08-2018 | 03:30 PM | Active | View |
22. | Construction of new office building for Syndicate bank, Bharveli Branch at Balaghat Mine( MOIL/18-19/ET/150) | 16-07-2018 | 14-08-2018 | 14-08-2018 | 14-08-2018 | 03:30 PM | Active | View |
23. | Barbed wire fencing for confining storage area for sand fetched from river bank at MOIL lease Kanki sand ghat at Balaghat Mine(MOIL/18-19/ET/151) | 16-07-2018 | 14-08-2018 | 14-08-2018 | 14-08-2018 | 03:30 PM | Active | View |
24. | Purchase of LT ACB Panel - 16 Items for Various Mines (16 Lots) (Only Through e-procurement)(WE-59 Dt.16/07/2018 (MOIL/18-19/ET/180)) | 16-07-2018 | 16-08-2018 | 16-08-2018 | 17-08-2018 | 03:30 PM | Active | View |
25. | Providing and fixing M.S. doors at Camp quarters at Tirodi Mine( TRD/CIVIL/2018-19/941-B) | 14-07-2018 | 20-07-2018 | 20-07-2018 | 20-07-2018 | 03:30 PM | Active | View |
26. | SHIFTING OF ACCUMULATED SAND FROM HAULAGE AND X CUT AT -170L OF VERTICAL SECTION AT CHIKLA MINE(TE-09 Dt.12072018) | 14-07-2018 | 21-07-2018 | 21-07-2018 | 21-07-2018 | 4:30 PM | Active | View |
27. | Maintenance of water Filtration Plant and water supply scheme At near new A Type quarter at Tirodi Mine.(TRD/CIVIL/2018-19/933-A) | 14-07-2018 | 21-07-2018 | 21-07-2018 | 21-07-2018 | 03:30 PM | Active | View |
28. | LOADING, UNLOADING AND SPREADING OF FILLING AT 60L OF CHIKLA-B SECTION AT CHIKLA MINE( TE-10 Dt.14072018) | 14-07-2018 | 21-07-2018 | 21-07-2018 | 21-07-2018 | 4:30 PM | Active | View |
29. | Maintenance and operation of water supply scheme at chikla mine(TE/CH/MECH/18-19/216) | 14-07-2018 | 21-07-2018 | 21-07-2018 | 21-07-2018 | 03:30 PM | Active | View |
30. | Supply of Conveyor Belt, 600 mm width ,115 Mtrs for Crushing and Screening PLANT CHIKLA MINE(TE/CH/MECH/18-19/217) | 14-07-2018 | 21-07-2018 | 21-07-2018 | 21-07-2018 | 03:30 PM | Active | View |
31. | Blanket Rate Contract of Esab Make welding Accessories and industrial Gas Equipment(PUR/MOIL/C-3/16/E-22/378-M DT.12/07/2018) | 13-07-2018 | 25-07-2018 | 25-07-2018 | 25-07-2018 | 03:30 PM | Active | View |
32. | PVC PIPE 12mm and 20mm(PUR-MOIl-C-1-196-WE-62-ET-178 dt.13.07.2018) | 13-07-2018 | 06-08-2018 | 06-08-2018 | 07-08-2018 | 03:30 PM | Active | View |
33. | PURCHASE OF MANWINDING STEEL WIRE ROPE - ASSORTED SIZES(WE-14 DT.13.07.2018(e-Tender no.MOIL/18-19/ET/177)) | 13-07-2018 | 02-08-2018 | 02-08-2018 | 03-08-2018 | 03:30 PM | Active | View |
34. | Construction of multi sports complex along with spectator gallery at Chikla Mine(MOIL/18-19/ET/146) | 13-07-2018 | 10-08-2018 | 10-08-2018 | 10-08-2018 | 03:30 PM | Active | View |
35. | Purchase of Front End Wheel Loader for Various Mines - 2 Nos. (2 Lots) (Only Through e-procurement)(WE-45 Dt.13/07/2018 (MOIL/18-19/ET/174)) | 13-07-2018 | 09-08-2018 | 09-08-2018 | 10-08-2018 | 03:30 PM | Active | View |
36. | Erection of new LT overhead line from main substation to ventilation fan at Ch.7700 at Ukwa Mine(MOIL/18-19/ET/168) | 13-07-2018 | 13-08-2018 | 13-08-2018 | 13-08-2018 | 03:30 PM | Active | View |
37. | Annual Operation and Maintenance Contract for HEMM at Dongri Buzurg Mine(MOIL/18-19/ET/164) | 13-07-2018 | 13-08-2018 | 13-08-2018 | 13-08-2018 | 03:30 PM | Active | View |
38. | Purchase of HT VCB Panel - 10 Items for Various Mines (10 Lots) (Only Through e-procurement)(WE-60 Dt.13/07/2018 (MOIL/18-19/ET/179)) | 13-07-2018 | 13-08-2018 | 13-08-2018 | 14-08-2018 | 03:30 PM | Active | View |
39. | Making a barricade cum retaining wall infront of B type quarters at Balaghat Mine(BGT/Civil/18-19/2229 dt. 01.07.2018) | 12-07-2018 | 20-07-2018 | 20-07-2018 | 20-07-2018 | 04:30 PM | Active | View |
40. | DRILLING and JAMMING OF ROCK BOLT RB AT 70L OF CHIKLA B INCLINE IN CHIKLA MINE(TE-08 Dt.12.072018) | 12-07-2018 | 21-07-2018 | 21-07-2018 | 21-07-2018 | 4:30 PM | Active | View |
41. | WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES OF ENGINE FOR 3000 KVA DG SET, MAKE STERLING WILSON.( PUR/MOIL/C-5/47/E-20/355-M Dt. 12/07/2018) | 12-07-2018 | 01-08-2018 | 01-08-2018 | 01-08-2018 | 03:30 PM | Active | View |
42. | Purchase of DC Rectifier Transformer for EMD Plant, Dongri Buzurg Mine - 1 Set (1 LOT) (Only Through e-procurement)(WE-58 Dt.12/07/2018 (MOIL/18-19/ET/175)) | 12-07-2018 | 09-08-2018 | 09-08-2018 | 10-08-2018 | 03:30 PM | Active | View |
43. | Construction of Industrial shed for coke storage yard, finish product yard and steam coal storage yard for Ferro Manganese Plant at Balaghat Mine(MOIL/17-18/ET/147) | 12-07-2018 | 10-08-2018 | 10-08-2018 | 10-08-2018 | 03:30 PM | Active | View |
44. | Erection of new LT overhead line from IMB Plant to Railway Weigh Bridge at Balaghat Mine(MOIL/18-19/ET/162) | 12-07-2018 | 13-08-2018 | 13-08-2018 | 13-08-2018 | 03:30 PM | Active | View |
45. | Construction of surface infrastructure Buildings for 2nd Vertical Shaft at Munsar Min(MOIL/17-18/ET/145) | 12-07-2018 | 13-08-2018 | 13-08-2018 | 13-08-2018 | 03:30 PM | Active | View |
46. | Purchase of CEMENT - 1014 MT( WE-57 e-tender No.MOIL/18-19/ET-176, Dt.12.07.18) | 12-07-2018 | 13-08-2018 | 13-08-2018 | 14-08-2018 | 03:30 PM | Active | View |
47. | Agrico Implements(PUR-MOIL-C-1-196-E-23 dt. 11-07-2018) | 11-07-2018 | 26-07-2018 | 26-07-2018 | 26-07-2018 | 03:30 PM | Active | View |
48. | WEBSITE SINGLE TENDER ENQUIRY IN SINGLE BID SYSTEM FOR PURCHASE OF GODREJ MAKE CHAIR, MODEL- HALO VERY HIGH BACK FOR HEAD OFFICE, NAGPUR(PUR/MOIL/C-4/54/E-24/193-M Dt.11/07/2018) | 11-07-2018 | 18-07-2018 | 18-07-2018 | 18-07-2018 | 03:30 PM | Active | View |
49. | Purchase of Pneumatic Stopper With Telescopic Air Leg for Various Mines - 33 Nos. (2 Lots) (Only Through e-procurement)(WE-61 Dt.10/07/2018 (MOIL/18-19/ET/172)) | 11-07-2018 | 09-08-2018 | 09-08-2018 | 10-08-2018 | 03:30 PM | Active | View |
50. | Purchase of Rear Dumpers - 6 Nos.for Various Mines (4 Lots) (Only Through e-procurement)(WE-43 Dt.10/07/2018 (MOIL/18-19/ET/173)) | 11-07-2018 | 13-08-2018 | 13-08-2018 | 14-08-2018 | 03:30 PM | Active | View |
51. | Segregation, Breaking, Transportation, Feeding, Crushing and Screening of LGHS ore and Weighing and Transportation of all products to various sites at D B Mine(MOIL/18-19/ET/158) | 10-07-2018 | 07-08-2018 | 07-08-2018 | 07-08-2018 | 03:30 PM | Active | View |
52. | Tea Snacks and Lunch for Technical Training Programs to be conducted at Munsar Training Center for the year 2018-19(MUN/Training/TE/2018-19/52 Date 07.07.2018) | 09-07-2018 | 17-07-2018 | 17-07-2018 | 17-07-2018 | 04:30 PM | Active | View |
53. | Loading and unloading steel section and various materials with stacking at Dongri Buzurg Mine(MOIL/18-19/ET/149) | 09-07-2018 | 09-08-2018 | 09-08-2018 | 09-08-2018 | 03:30 PM | Active | View |
54. | Purchase of Gravel Black Gitti for Underground concreting work at Ukwa Mine(MOIL/18-19/ET/148) | 09-07-2018 | 09-08-2018 | 09-08-2018 | 09-08-2018 | 03:30 PM | Active | View |
55. | Removing of loose Waste rock from 6900 raises between 1850 level to 1950 level at Ukwa Mine(A andSr DyGM(M)/Civil/UM/18-19/779) | 07-07-2018 | 23-07-2018 | 23-07-2018 | 23-07-2018 | 04:30 PM | Active | View |
56. | Repairing and servicing of Actuators of Butterfly Valve of I.M.B Plant at Balaghat Mine(AGT/BGT/MECH/IMB/18-19/164A dtd 03.07.2018) | 07-07-2018 | 13-07-2018 | 13-07-2018 | 13-07-2018 | 04:30 PM | Active | View |
57. | Construction bay, providing, supplying and laying of cable, Installation of metering cubicle etc. for proposed 33KV HT Connection for Vertical Shaft project at Gumgaon Mine(MOIL/18-19/ET/154) | 07-07-2018 | 27-07-2018 | 27-07-2018 | 27-07-2018 | 03:30 PM | Active | View |
58. | Consultancy for the design the layout, drawings ,estimation and construction Details of Belt conveyor charging System at FMP Balaghat mine(T.E./MOIL/FMP/BGT/ME/18-19/117) | 06-07-2018 | 16-07-2018 | 16-07-2018 | 16-07-2018 | 04:30 PM | Active | View |
59. | Providing and supplying of trailing cable(BGT/TE/Elect./18-19/161) | 06-07-2018 | 01-08-2018 | 01-08-2018 | 01-08-2018 | 04:30 PM | Active | View |
60. | Augmentation of 33 KV Outdoor and 11 KV indoor substation of Ukwa Mine(MOIL/18-19/ET/108) | 06-07-2018 | 06-08-2018 | 06-08-2018 | 06-08-2018 | 03:30 PM | Active | View |
61. | CONSTRUCTION OF R.C.C HUME PIPE CULVERT ACROSS MINE ROAD AT A DUMP AND C DUMP AT TIRODI MINE.(TRD/CIVIL/2018-19/828-A) | 05-07-2018 | 12-07-2018 | 12-07-2018 | 12-07-2018 | 03:30 PM | Active | View |
62. | Providing supplying of LED Flood Light fitting(BGT/TE/Eect./18-19/160) | 05-07-2018 | 01-08-2018 | 01-08-2018 | 01-08-2018 | 04:30 PM | Active | View |
63. | Supply of 1 no. Submrsible Effluent pump for Underground Sump Cleaning(UK/MECH/2018-19/315) | 04-07-2018 | 23-07-2018 | 23-07-2018 | 23-07-2018 | 04:30 PM | Active | View |
64. | Iron Pans(PUR-MOIL-C-1-196-WE-52 dt-03-07-2018) | 04-07-2018 | 24-07-2018 | 24-07-2018 | 25-07-2018 | 03:30 PM | Active | View |
65. | Hessian cloth(PUR-MOIL-C-1-231-WE-51-ET-153 dt.03/07/2018) | 03-07-2018 | 26-07-2018 | 27-07-2018 | 27-07-2018 | 03:30 PM | Active | View |
66. | Designing Engineering Supplying Installation Commissioning and Testing of 2 x 1000KVA 11KV433V Indoor substation for second Vertical Shaft Project at Munsar Mine(MOIL/18-19/ET/107) | 02-07-2018 | 26-07-2018 | 26-07-2018 | 26-07-2018 | 03:30 PM | Active | View |
67. | INSTALLATION OF LIGHTENING ARRESTOR AT RAILWAY WEIGH BRIDGE ANS MINE MAGAZINE(TE/CH/ELECT/18-19/193) | 02-07-2018 | 11-07-2018 | 11-07-2018 | 11-07-2018 | 03:30 PM | Active | View |
68. | Comprehensive Annual Maintenance Contract (CAMC) of Computers, Printers, UPSs installed at Ukwa, Tirodi Sitapatore Mine(BGT/SYSTEM/AMC/2018-19/ 314 Dated 02/07/) | 02-07-2018 | 13-07-2018 | 13-07-2018 | 13-07-2018 | 03:45 PM | Active | View |
69. | Comprehensive Annual Maintenance Contract (CAMC) of Computers, Printers, UPSs installed at Balaghat Mine(BGT/SYSTEM/AMC/2018-19/312 dt 02.07.2018) | 02-07-2018 | 13-07-2018 | 13-07-2018 | 13-07-2018 | 03:30 PM | Active | View |
70. | Retaining Wall for New Installation of pump shed and foundation for 170HPpump and 150HP pump North Section at Tirodi Mine.(TRD/CIVIL/2018-19/772-B) | 30-06-2018 | 07-07-2018 | 07-07-2018 | 07-07-2018 | 03:30 PM | Active | View |
71. | Repairing of Kachha road at North and south section mine road at Tirodi Mine.(TRD/CIVIL/2018-19/751-A) | 30-06-2018 | 11-07-2018 | 11-07-2018 | 11-07-2018 | 03:30 PM | Active | View |
72. | Cleaning of septic tank with vacuum cleaning machine at camp and colony area at Tirodi Mine.(TRD/CIVIL/2018-19/762-B) | 30-06-2018 | 10-07-2018 | 10-07-2018 | 10-07-2018 | 03:30 PM | Active | View |
73. | Purchase of Transformer Oil - 6300 Ltrs.(2 Lots) (Only Through e-procurement)(WE-50 Dt.30/06/2018 (MOIL/18-19/ET/144)) | 30-06-2018 | 26-07-2018 | 26-07-2018 | 27-07-2018 | 03:30 PM | Active | View |
74. | Purchase of Accessories for Cable Bolting Machines(WE-42 e-tender No.MOIL/18-19/ET-143, Dt.29.06.18) | 29-06-2018 | 13-08-2018 | 13-08-2018 | 14-08-2018 | 03:30 PM | Active | View |
75. | Purchase of Curtis Make DC to DC Chopper-18 Nos.(WE-61 DT.28.06.2018(e-Tender No.MOIL/18-19/ET/142)) | 28-06-2018 | 23-07-2018 | 23-07-2018 | 24-07-2018 | 03:30 PM | Active | View |
76. | Purchase of Hydraulic Excavators with O M spares (4 Lots) (Only Through e-procurement)(WE-44 DT.27/06/2018 (MOIL/18-19/ET/141)) | 27-06-2018 | 25-07-2018 | 25-07-2018 | 26-07-2018 | 03:30 PM | Active | View |
77. | Underground Tub Pushing at Munsar Mine(7100000860/MUN/18-19/975) | 27-06-2018 | 06-07-2018 | 06-07-2018 | 06-07-2018 | 04:30 PM | Active | View |
78. | Picking and collection of UKL 448 25 percent and UKL 471 20 percent from F W dumps from Ch.8600 to Ch.9500 at Ukwa Mine(MOIL/18-19/ET/131) | 26-06-2018 | 26-07-2018 | 26-07-2018 | 26-07-2018 | 03:30 PM | Active | View |
79. | Cleaning of surplus contaminated ROM at Chikla B section of Chikla Mine(MOIL/18-19/ET/129) | 26-06-2018 | 26-07-2018 | 26-07-2018 | 26-07-2018 | 03:30 PM | Active | View |
80. | Transportation of underground tubs at Ch 10800 section of Ukwa Mine(A andSr DyGM(M)/Civil/UM/18-19/628) | 26-06-2018 | 10-07-2018 | 10-07-2018 | 10-07-2018 | 04:30 PM | Active | View |
81. | Cleaning of surplus contaminated ROM at Gadhaghat and 14 16 Section of Chikla Mine(MOIL/18-19/ET/130) | 26-06-2018 | 26-07-2018 | 26-07-2018 | 26-07-2018 | 03:30 PM | Active | View |
82. | Outsourcing of Maintenance and repairs of HT and LT overhead lines at Balaghat Mine(MOIL/18-19/ET/106) | 25-06-2018 | 24-07-2018 | 24-07-2018 | 24-07-2018 | 03:30 PM | Active | View |
83. | Safety Helmets(PUR-MOIL-C-1-189-E-14 dt. 25.06.2018) | 25-06-2018 | 18-07-2018 | 18-07-2018 | 18-07-2018 | 03:30 PM | Active | View |
84. | Hiring of Diesel Jeep for opencast development activities in Dongri Buzurg Mine(MOIL/18-19/ET/100) | 25-06-2018 | 20-07-2018 | 20-07-2018 | 20-07-2018 | 03:30 PM | Active | View |
85. | Distribution/Filling of Diesel in Mine HEMMS at Dongri Buzurg Mine(MOIL/18-19/ET/99) | 25-06-2018 | 20-07-2018 | 20-07-2018 | 20-07-2018 | 03:30 PM | Active | View |
86. | Picking and collection of SM Grade ore TDL 499 AND TDL 469 from South staff Quarter dump at Tirodi Mine(MOIL/18-19/ET/127) | 25-06-2018 | 25-07-2018 | 25-07-2018 | 25-07-2018 | 03:30 PM | Active | View |
87. | Cleaning of surplus contaminated ROM to recover Ferro grade AND LGHS ore at Vertical shaft of Chikla Mine(MOIL/18-19/ET/126) | 25-06-2018 | 25-07-2018 | 25-07-2018 | 25-07-2018 | 03:30 PM | Active | View |
88. | Removal of pebbles near sand stowing plants at Balaghat Mine(MOIL/18-19/ET/128) | 25-06-2018 | 25-07-2018 | 25-07-2018 | 25-07-2018 | 03:30 PM | Active | View |
89. | Cleaning of surplus underground ROM at Beldongri Mine(MOIL/18-19/ET/125) | 25-06-2018 | 25-07-2018 | 25-07-2018 | 25-07-2018 | 03:30 PM | Active | View |
90. | Picking and collection of material to recover Ferro grade TD 4505 and LGHS ore TDL 439 AND TDL 499 from reject dump old OCF dump at Tirodi Mine(MOIL/18-19/ET/121) | 22-06-2018 | 23-07-2018 | 23-07-2018 | 23-07-2018 | 03:30 PM | Active | View |
91. | Pattern making, casting,Machining and dynamic balancing of Pump Spares for 150 HP Mather and Platt make Multi stage Pump No.1 at 6th Level Underground of Balaghat Mine(AGT/BGT/MECH/PUMP/18-19/171 dtd.22.06.2018) | 22-06-2018 | 03-07-2018 | 03-07-2018 | 03-07-2018 | 04:30 PM | Active | View |
92. | Fabrication of 60 Lbs rail crossing (LH and RH) 24 inch Guage for Underground/Surface work at Balaghat Mine(AGT/BGT/MECH/18-19/170 dtd 21.06.2018) | 22-06-2018 | 03-07-2018 | 03-07-2018 | 03-07-2018 | 04:30 PM | Active | View |
93. | Transportation of ROM tub rock tubs from vertical shaft top to OCF at Beldongri Mine(MOIL/18-19/ET/123) | 22-06-2018 | 23-07-2018 | 23-07-2018 | 23-07-2018 | 03:30 PM | Active | View |
94. | Picking and collection of UKL 448 25 Percent and UKL 471 20 Percent from F W dumps from Ch.4300 to Ch.6800 at Ukwa Mine( MOIL/18-19/ET/122) | 22-06-2018 | 23-07-2018 | 23-07-2018 | 23-07-2018 | 03:30 PM | Active | View |
95. | UNDERGROUND CONCRETING WORK AT BALAGHAT MINE(MOIL/18-19/ET/124) | 22-06-2018 | 23-07-2018 | 23-07-2018 | 23-07-2018 | 03:30 PM | Active | View |
96. | G.I.Wire Netting and S S Screen Cloth -7 items(PUR-MOIL-C-1-203-WE-48-ET-140) | 21-06-2018 | 16-07-2018 | 16-07-2018 | 17-07-2018 | 03:30 PM | Active | View |
97. | PROVIDING, SUPPLYING, FIXING AND INSTALLATION OF ESE TYPE LIGHTING ARRESTER FOR RAILWAY AND ROAD WEIGH BRIDGE AT MUNSAR MINE(Elect/MUN/ADGM/18-19/215) | 20-06-2018 | 30-06-2018 | 30-06-2018 | 30-06-2018 | 03:30 PM | Active | View |
98. | Repairing MS Tanks and FRVE Lining on MS Neutralization tanks and Hoppers at EMD PLANT DB MINE(MOIL/EMD/CH/ADGM/2018-19/168) | 20-06-2018 | 29-06-2018 | 29-06-2018 | 30-06-2018 | 04:30 PM | Active | View |
99. | WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR SANDVIK ASIA PVT. LTD MAKE, JUMBO DRILLING MACHINE OPERATING AT BALAGHAT MINE.(PUR/MOIL/C-5/23/E-12/218-M Dt. 20/06/2018) | 20-06-2018 | 11-07-2018 | 11-07-2018 | 11-07-2018 | 03:30 PM | Active | View |
100. | HDPE Pipes,Bends,Ends(PUR-MOIL-C-1-190-WE-41-ET-139 dt.20.06.2018) | 20-06-2018 | 12-07-2018 | 12-07-2018 | 13-07-2018 | 03:30 PM | Active | View |
Tenders More Information |
---|
Contracts finalised on nomination basis Details of Purchase Order issued by MATERIALS DEPARTMENT valuing Rs.30.00 Lakhs & Above
List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website) |
View (2024) Year Tenders |
View (2023) Year Tenders |
View (2022) Year Tenders |
View (2021) Year Tenders |
View (2020) Year Tenders |
View (2019) Year Tenders |
View (2018) Year Tenders |
View (2017) Year Tenders |
View (2016) Year Tenders |
View (2015) Year Tenders |
View (2014) Year Tenders |
View (2013) Year Tenders |
View (2012) Year Tenders |
View (24) Year Tenders |
View Full Tender Archive |
See all MOIL tender. |