1. Purchase of Reduction Gear Box-1 No.(1 Lot) for Man Winding Engine of Production Shaft at Balaghat Mine(M.P) (Only Through e-procurement)( WE-84 Dt.21/08/2018 (MOIL/18-19/ET/240)) 21-08-2018 17-09-2018 17-09-2018 18-09-2018 03:30 PM Active View
2. Hiring of services for mobile/skid mounted crushing and screening plant with VSI unit for processing dump reject ore/sand pebbles including excavation transportation of raw materials and transportation of product for sand stowing at Balaghat Mine(MOIL/18- 21-08-2018 19-09-2018 19-09-2018 19-09-2018 03:30 PM Active View
3. Blanket Rate Contract for one Year for supply of various types of Paints, Thinner etc( WE-78 DT.21.08.2018 (e-Tender no.MOIL/18-19/ET/241) 21-08-2018 18-09-2018 18-09-2018 19-09-2018 03:30 PM Active View
4. Concreting of X cut between Ch.24 to Ch.30 at 300 Level for stope preparation at Gumgaon Mine(MOIL/18-19/ET/213) 21-08-2018 21-09-2018 21-09-2018 21-09-2018 03:30 PM Active View
5. Making and Supply of stemming material Mud plug used for blasting at Gumgaon Mine(MOIL/18-19/ET/214) 21-08-2018 21-09-2018 21-09-2018 21-09-2018 03:30 PM Active View
6. Procurement of C class Items for Ferro Manganese Plant(FMP/TE/Elect/18-19/160) 21-08-2018 05-09-2018 05-09-2018 05-09-2018 03:30 PM Active View
7. PURCHASE OF FASTNERS,WIRE NAILS AND ROSE NAILS FOR BALAGHAT MINE(PUR/MOIL/BGT/FASTNER/18-19/607 dtd 20.08.2018) 21-08-2018 11-09-2018 11-09-2018 11-09-2018 04:30 PM Active View
8. PURCHASE OF C CLASS ITEMS GRINDING WHEEL COTTON WASTE and WHITE CHINDI, TORCH CELL, HACKSAW BLADE, NYLON ROPE, MANILA ROPE, TEFLON TAPE and EMERY TAPE FOR KANDRI MINE( AGT-GR.III/KD/2018-19/1640) 21-08-2018 11-09-2018 11-09-2018 11-09-2018 03:30 PM Active View
9. Replacement of Buntons of Holmes Shaft at Balaghat Mine( BGT/MECH/PS/18-19/3358) 20-08-2018 28-08-2018 28-08-2018 28-08-2018 04:00 PM Active View
10. Agrico implements( PUR-MOIl-C-1-196-E-32 dt -20-08-2018) 20-08-2018 03-09-2018 03-09-2018 03-09-2018 03:30 PM Active View
11. WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR HOLMAN CLIMAX AIR WINCHES (PUR/MOIL/C-5/27/E-31/493-M Dt. 20/08/2018) 20-08-2018 19-09-2018 19-09-2018 19-09-2018 3:30 PM Active View
12. Repairing of Track Rollers Assembly of Side Dump Loader-3 Nos operating at Balaghat Mine(AGT/BGT/MECH/SDL/18-19/590 dtd 19.08.2018) 20-08-2018 04-09-2018 04-09-2018 04-09-2018 04:30 PM Active View
13. PURCHASE OF C CLASS ITEMS - PACKING MATERIAL FOR KANDRI MINE( AGT-GR.III/KD/2018-19/1623) 20-08-2018 11-09-2018 11-09-2018 11-09-2018 03:30 PM Active View
14. WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR HOLMAN CLIMAX AIR WINCHES(PUR/MOIL/C-5/27/E-31/493-M Dt. 20/08/2018) 20-08-2018 12-09-2018 12-09-2018 12-09-2018 03:30 PM Active View
15. EXTENSION OF RETAINING WALL FOR STABILITY OF LOOSE OVERBURDEN AT MOBILE CRUSHER AT MUNSAR MINE.(MUN/CIVIL/18-19/72 DT 17.08.2018) 18-08-2018 24-08-2018 24-08-2018 24-08-2018 04:30 PM Active View
16. Underground Development Horizontal and Vertical at 170 Level of Vertical section at Chikla Mine(MOIL/18-19/ET/211) 17-08-2018 17-09-2018 17-09-2018 17-09-2018 03:30 PM Active View
17. Removal of accumulated pebbles near sand stowing plants at Chikla Mine( MOIL/18-19/ET/212) 17-08-2018 17-09-2018 17-09-2018 17-09-2018 03:30 PM Active View
18. Transportation of manganese ore from Gumgaon mine siding to Kandri Mine siding(MOIL/18-19/ET/215) 17-08-2018 27-08-2018 27-08-2018 27-08-2018 03:30 PM Active View
19. Purchase of Tipper - 5 Nos for Various Mines (1 Lot) (Only Through e-procurement)( WE-71 DT.16/08/2018 (MOIL/18-19/ET/239)) 16-08-2018 17-09-2018 17-09-2018 18-09-2018 03:30 PM Active View
20. PURCHASE OF C CLASS ITEMS PIPE FITTING ACCESSORIES FOR KANDRI MINE(AGT-GR.III/KD/2018-19/1562) 13-08-2018 03-09-2018 03-09-2018 03-09-2018 03:30 PM Active View
21. WEBSITE PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF TENOVA DELKOR MAKE BUTTERFLY VALVE AND ACTUATOR(PUR/MOIL/C-11/129/E-29/481-M Dt. 13-08-2018) 13-08-2018 05-09-2018 05-09-2018 05-09-2018 03:30 PM Active View
22. RCC work at CH-1800 and CH-2665 in -470 Level and -270 Level of Chikla Mine(TE-14 Dt.13082018) 13-08-2018 20-08-2018 20-08-2018 20-08-2018 04:30 PM Active View
23. PURCHASE OF HIGH ENERGY EFFICIENT AXIAL FLOW FRP FAN - 2 SETS (1 SET CONTAINTS - 12 NOS.BLADES) (AS PER ANNEXURE A ENCLOSED).(PUR/MOIL/C-4/148/E-30/484-M Dt.09/08/2018) 10-08-2018 03-09-2018 03-09-2018 03-09-2018 03:30 PM Active View
24. Purchase of Electrically Operated Auxiliary Ventilation Fan for Various Mines - 7 Nos. (2 Lots) (Only Through e-procurement)(WE-82 Dt.09/08/2018 (MOIL/18-19/ET/210)) 09-08-2018 17-09-2018 17-09-2018 18-09-2018 03:30 PM Active View
25. Manual Removal of Sludge from S.K. Tank at I.M.B. Plant at Balaghat Mine(MOIL/18-19/ET/187) 09-08-2018 06-09-2018 06-09-2018 06-09-2018 03:30 PM Active View
26. Raking of Raw Materials and Preparation of Sand beds and associated works at Ferro Manganese Plant, Balaghat Mine(MOIL/18-19/ET/186) 09-08-2018 06-09-2018 06-09-2018 06-09-2018 03:30 PM Active View
27. WEBSITE PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR KIRLOSKAR MAKE PUMP(PUR/MOIL/C-11/21/E-28/472-M Dt. 09-08-2018) 09-08-2018 31-08-2018 31-08-2018 31-08-2018 03:30 PM Active View
28. Purchase of Electrical HT/LT Cables (Assorted Size)( WE-56 DT.08.08.2018 (e-TenderNo.MOIL/18-19/ET-209)) 09-08-2018 11-09-2018 11-09-2018 12-09-2018 03:30 PM Active View
29. Overhauling of Pollution Control Unit with Material at Ferro Manganese Plant, Balaghat Mine(MOIL/18-19/ET/188) 09-08-2018 07-09-2018 07-09-2018 07-09-2018 03:30 PM Active View
30. SUPPLY OF JAW PLATES FOR SAYAJI MAKE CRUSHER 20 X 12(SDGM/CHIKLA/MECH/TE/2018-19, 08/08/2018) 08-08-2018 29-08-2018 29-08-2018 29-08-2018 03:30 PM Active View
31. Purchase of Head Gear Sheave Wheels, 3.6 Mtrs Dia. for Balaghat Mine - 2 Sets.(1 Lot) (Only Through e-procurement)( WE-81 Dt.08/08/2018 (MOIL/18-19/ET/208)) 08-08-2018 10-09-2018 10-09-2018 11-09-2018 03:30 PM Active View
32. Additional excavation in Mangeniferous rock between Ch.24 to Ch.30 at 300 Level at Gumgaon Mine(MOIL/18-19/ET/196) 06-08-2018 06-09-2018 06-09-2018 06-09-2018 03:30 PM Active View
33. Underground development at 13.5th Level at Balaghat Mine(MOIL/18-19/ET/195) 06-08-2018 06-09-2018 06-09-2018 06-09-2018 03:30 PM Active View
34. Underground development at 11th Level South Section at Balaghat Mine(MOIL/18-19/ET/199) 06-08-2018 06-09-2018 06-09-2018 06-09-2018 03:30 PM Active View
35. PURCHASE OF C CLASS ITEMS - WIRE and ROSE NAILS AND FASTENERS FOR KANDRI MINE(AGT-GR.III/KD/2018-19/1486) 06-08-2018 27-08-2018 27-08-2018 27-08-2018 03:30 PM Active View
36. Handling of spillage ore and fines from various places of IMB plant at Dongri Buzurg Mine(MOIL/18-19/ET/197) 06-08-2018 06-09-2018 06-09-2018 06-09-2018 03:30 PM Active View
37. Purchase of Hose Fittings for Rock Drill and Air Leg Machines(WE-68 e-tender No.MOIL/18-19/ET-207, Dt.06.08.18) 06-08-2018 30-08-2018 30-08-2018 31-08-2018 03:30 PM Active View
38. Procurement of 33kV residual voltage transformer for capacitor bank..(fmp/elect/18-19/147) 04-08-2018 24-08-2018 24-08-2018 24-08-2018 04:30 PM Active View
39. Procurement of Industrial man cooler pedestal fan(fmp/elect/18-19/146) 04-08-2018 24-08-2018 24-08-2018 24-08-2018 04:30 PM Active View
40. SAPLING AT MINE DUMP AREA AT TIRODI MINE(TRD/CIVIL/2018-19/1065-A) 04-08-2018 11-08-2018 11-08-2018 11-08-2018 03:30 PM Active View
41. Purchase of Undercarriage assemblies for Sandvik Make DI-500 Drilling Machine and BEML Make Dozer BD-85 and BD-155.(WE-75 e-tender No.MOIL/18-19/ET-206, Dt.03.08.18) 03-08-2018 28-08-2018 28-08-2018 29-08-2018 03:30 PM Active View
42. Underground Concreting work at Chikla Mine(MOIL/18-19/ET/192) 03-08-2018 03-09-2018 03-09-2018 03-09-2018 03:30 PM Active View
43. Pushing and unloading of tubs in underground and on surface at vertical shaft section at Ukwa Mine(MOIL/18-19/ET/193) 03-08-2018 03-09-2018 03-09-2018 03-09-2018 03:30 PM Active View
44. Removal of waste rock and handling the same by mechanized means from South dump at Tirodi Mine(MOIL/18-19/ET/194) 03-08-2018 03-09-2018 03-09-2018 03-09-2018 03:30 PM Active View
45. PURCHASE OF MATHER AND PLATT MAKE BARE PUMP (WITHOUT MOTOR AND ACCESSORIES) - 1 NO. FOR IMB PLANT, BALAGHAT MINE (M.P), AS PER ANNEXURE - A ENCLOSED.(PUR/MOIL/C-4/78/E-6/459 -M DT.03/08/2018) 03-08-2018 31-08-2018 31-08-2018 31-08-2018 03:30 PM Active View
46. Purchase of Transformer - 14 Nos. (10 Lots) (Only Through e-procurement)(WE-72 DT.02/08/2018 (MOIL/18-19/ET/205)) 02-08-2018 03-09-2018 03-09-2018 04-09-2018 03:30 PM Active View
47. Purchase of Cable Bolting Machine for Various Mines - 10 Nos.(2 Lots) (Only Through e-procurement)(WE-70 DT.01/08/2018 (MOIL/18-19/ET/203)) 01-08-2018 04-09-2018 04-09-2018 05-09-2018 03:30 PM Active View
48. Purchase of High Mast Lighting System for Various Mines - 13 Nos. (2 Lots)(WE-73 DT.01/08/2018 (MOIL/18-19/ET/204)) 01-08-2018 30-08-2018 30-08-2018 31-08-2018 03:30 PM Active View
49. Purchase of Steel Braided Rubber Hose(WE-69 e-tender No.MOIL/18-19/ET-202, Dt.01.08.18) 01-08-2018 06-09-2018 06-09-2018 07-09-2018 03:30 PM Active View
50. PURCHASE OF C CLASS MATERIALS FOR CHIKLA AND DONGRI BUZURG MINE(TE-12 DT.25072018) 31-07-2018 20-08-2018 20-08-2018 20-08-2018 04:30 PM Active View
51. Underground Horizontal Development at 270 Level of Vertical section at Chikla Mine( MOIL/18-19/ET/189) 31-07-2018 31-08-2018 31-08-2018 31-08-2018 03:30 PM Active View
52. Pushing and unloading of ROM and rock tubs in underground and on surface at Gumgaon Mine(MOIL/18-19/ET/190) 31-07-2018 31-08-2018 31-08-2018 31-08-2018 03:30 PM Active View
53. Washing Picking and collection of material from 6 No. dumps of Sitapatore Mine(MOIL/18-19/ET/191) 31-07-2018 31-08-2018 31-08-2018 31-08-2018 03:30 PM Active View
54. Annual repairs to camp quarters Munsar Mine and Construction of pitching of un-course rubble masonry for stability of siding plateform at Kandri Mine(MOIL/18-19/ET/165) 30-07-2018 27-08-2018 27-08-2018 27-08-2018 03:30 PM Active View
55. Providing expoxy flooring for old and new workshop building of Balaghat Mine(MOIL/18-19/ET/167) 30-07-2018 27-08-2018 27-08-2018 27-08-2018 03:30 PM Active View
56. Providing furniture and interial works for Marketing Department on first floor of MOIL Bhawan Nagpur(MOIL/18-19/ET/170) 30-07-2018 28-08-2018 28-08-2018 28-08-2018 03:30 PM Active View
57. Painting to plant structure of integrated Manganese Beneficiation Plant IMB of Balaghat Mine(MOIL/18-19/ET/166) 30-07-2018 27-08-2018 27-08-2018 27-08-2018 03:30 PM Active View
58. Construction of sample room, weight bridge room, metal beam crush barrier along the WBM road at Beldongri Mine and construction of Electric meter room at old Satak mine(MOIL/18-19/ET/163) 30-07-2018 27-08-2018 27-08-2018 27-08-2018 03:30 PM Active View
59. Drilling of bore hole with installation of pump at Dongri Buzurg Mine(MOIL/18-19/ET/161) 30-07-2018 27-08-2018 27-08-2018 27-08-2018 03:30 PM Active View
60. ADDITIONAL PILLAR OF RCC AT CHIKLA B SECTION OF CHIKLA MINE(TE-13 Dt.28072018) 28-07-2018 06-08-2018 06-08-2018 06-08-2018 04:30 PM Active View
61. Manpower towards plantation under Plantation Drive at Munsar Mine.(MUN/CIVIL/18-19/59 Date 27.08.2018) 28-07-2018 04-08-2018 04-08-2018 04-08-2018 04:30 PM Active View
62. Maintenance of Gardens at Ukwa Mine. (16/Civil/UM/18-19/878) 26-07-2018 09-08-2018 09-08-2018 09-08-2018 4:30 PM Active View
63. Maintenance and operation of water supply scheme at Ukwa Mine (16/Civil/UM/18-19/879) 26-07-2018 09-08-2018 09-08-2018 09-08-2018 4:30 PM Active View
64. Removal of Garbage cleaning of Drains and septic tank etc. at camp qr. at Ukwa Mine (16/Civil/UM/18-19/880) 26-07-2018 09-08-2018 09-08-2018 09-08-2018 4:30 PM Active View
65. Manual Removal of Sludge from S.K. tank (Mining/BGT/T.E./2018-19/298) 26-07-2018 03-08-2018 03-08-2018 03-08-2018 4:30 PM Active View
66. Trameline accessories-7 items (PUR-MOIL-C-12-05-WE-67-ET-200 dt. 26.07.2018) 26-07-2018 20-08-2018 20-08-2018 21-08-2018 3:30 PM Active View
67. Purchase of Pneumatic Tyre, Tube and Flaps and Solid Tyres(WE-13 DT.26.07.2018(e-TenderNo. MOIL/18-19//ET/201) 26-07-2018 30-08-2018 30-08-2018 31-08-2018 03:30 PM Active View
68. Ms Pipes -2 items (PUR-MOIl-C-1-197-We-66-ET-198 dt.25.07.2018) 25-07-2018 16-08-2018 16-08-2018 17-08-2018 3:30 PM Active View
69. BLANKET RUNNING RATE CONTRACT UNDER MVC PROGRAM OF HP FOR SUPPLY OF TONERS/CARTRIDGES FOR HP MAKE PRINTER/ALL IN ONE PRINTER. (PUR-MOIL-C-12-1-E-26 dt. 24/07/2018) 24-07-2018 08-08-2018 08-08-2018 08-08-2018 3:30 PM Active View
70. Procurement of LT Panel for colony substation at Chikla Mine (TE/CH/ELECT/18-19/288) 24-07-2018 13-08-2018 13-08-2018 13-08-2018 4:30 PM Active View
71. REQUIREMENT OF EXTRA EXCAVATION AT -370L FOR RCC SUPPORT AT CHIKLA MINE (TE-11 Dt.23072018) 23-07-2018 30-07-2018 30-07-2018 30-07-2018 4:30 PM Active View
72. Purchase of Traction Battery Chargers - 12 Nos. for various Mines (4 Lots) (Only Through e-procurement) (WE-65 DT.23/07/2018 (MOIL/18-19/ET/185)) 23-07-2018 23-08-2018 23-08-2018 24-08-2018 3:30 PM Active View
73. Procurement of Insulation Tester kit (BGT/TE/Elect./18-19/433) 23-07-2018 20-08-2018 20-08-2018 20-08-2018 4:30 PM Active View
74. Purchase of TCT Drill Rods - 4 Items (WE-12 DT.21.07.2018 (e-TenderNo.MOIL/18-19/ET/184)) 21-07-2018 16-08-2018 16-08-2018 17-08-2018 3:30 PM Active View
75. Construction of store room for Diamond Drill department near Timber yard at Chikla Mine. (TE/CH/CIVIL/18-19/171 date 14/06/2018) 19-07-2018 26-07-2018 26-07-2018 26-07-2018 3:30 PM Active View
76. WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES OF ENGINE FOR 1500 KVA DG SET, MAKE STERLING AND WILSON. (PUR/MOIL/C-5/47/E-25/406-M Dt. 19/07/2018) 19-07-2018 10-08-2018 10-08-2018 10-08-2018 3:30 PM Active View
77. Purchase of Rubber Air Hoses (WE-64 DT.19.07.2018(e-Tender No.MOIL/18-19/ET/183)) 19-07-2018 16-08-2018 16-08-2018 17-08-2018 3:30 PM Active View
78. Replacement of Buntons of Production Shaft(BGT/MECH/PS/18-19/ 2652) 18-07-2018 30-07-2018 30-07-2018 30-07-2018 04:00 PM Active View
79. Purchase of Grinding Wheels(WE-63 DT.16.07.2018(E-Tender No.MOIL18-19/ET/182)) 18-07-2018 09-08-2018 09-08-2018 10-08-2018 03:30 PM Active View
80. Maintenance and operation of water supply scheme at Chikla Mine (MOIL/18-19/ET/159) 18-07-2018 23-08-2018 23-08-2018 23-08-2018 3:30 PM Active View
81. Construction of Sand stowing plant with 1 lakh litre capacity RCC water tank and Construction of GI sheet shade at 0 L platform at Vertical shaft of Gumgaon Mine (MOIL/18-19/ET/157 ) 18-07-2018 23-08-2018 23-08-2018 23-08-2018 3:30 PM Active View
82. Construction of cement concrete road at industrial area premises and Construction of road side cement concrete drain at Gumgaon Mine (MOIL/18-19/ET/155 ) 18-07-2018 23-08-2018 23-08-2018 23-08-2018 3:30 PM Active View
83. Providing, supplying of LED Tube fitting(BGT/TE/Elect./18-19/396) 18-07-2018 13-08-2018 13-08-2018 13-08-2018 04:30 PM Active View
84. Design and Detailed engineering, supply, erection, commissioning and testing of rotary kiln including all accessories for Manganese Ore reduction at EMD Plant, Dongri Buzurg Mine(MOIL/18-19/ET/171) 18-07-2018 17-08-2018 17-08-2018 17-08-2018 03:30 PM Active View
85. Removal of Pebbles generated during Sand stowing Periodat Balaghat Mine(Mining/BGT/T.E./2018-19/404) 17-07-2018 23-07-2018 23-07-2018 23-07-2018 04:30 PM Active View
86. UnderGround Concreting at Balaghat Mine(Mining/BGT/T.E./2018-19/405) 17-07-2018 23-07-2018 23-07-2018 23-07-2018 04:30 PM Active View
87. C I Ball Valve- 4 items(PUR-MOIL-C-1-202-WE-53-ET-181 dt.17/07/2018) 17-07-2018 09-08-2018 09-08-2018 10-08-2018 03:30 PM Active View
88. Secondary recovery of dump ore from old dumps by excavation, segregation, loading, transportation, crushing and screening, loading and weighment and transportation up to various locations of all products at Ukwa Mine(MOIL/18-19/ET/156) 17-07-2018 23-08-2018 23-08-2018 23-08-2018 03:30 PM Active View
89. a) Interior renovation work for old guest house, b) Strengthening of production shaft head gear foundation, c) Construction of metering room and compound wall beside MPPEB electrical S/S at Balaghat Mine(MOIL/18-19/ET/152) 17-07-2018 14-08-2018 14-08-2018 14-08-2018 03:30 PM Active View
90. Construction of new office building for Syndicate bank, Bharveli Branch at Balaghat Mine( MOIL/18-19/ET/150) 16-07-2018 14-08-2018 14-08-2018 14-08-2018 03:30 PM Active View
91. Barbed wire fencing for confining storage area for sand fetched from river bank at MOIL lease Kanki sand ghat at Balaghat Mine(MOIL/18-19/ET/151) 16-07-2018 14-08-2018 14-08-2018 14-08-2018 03:30 PM Active View
92. Purchase of LT ACB Panel - 16 Items for Various Mines (16 Lots) (Only Through e-procurement)(WE-59 Dt.16/07/2018 (MOIL/18-19/ET/180)) 16-07-2018 16-08-2018 16-08-2018 17-08-2018 03:30 PM Active View
93. Providing and fixing M.S. doors at Camp quarters at Tirodi Mine( TRD/CIVIL/2018-19/941-B) 14-07-2018 20-07-2018 20-07-2018 20-07-2018 03:30 PM Active View
94. SHIFTING OF ACCUMULATED SAND FROM HAULAGE AND X CUT AT -170L OF VERTICAL SECTION AT CHIKLA MINE(TE-09 Dt.12072018) 14-07-2018 21-07-2018 21-07-2018 21-07-2018 4:30 PM Active View
95. Maintenance of water Filtration Plant and water supply scheme At near new A Type quarter at Tirodi Mine.(TRD/CIVIL/2018-19/933-A) 14-07-2018 21-07-2018 21-07-2018 21-07-2018 03:30 PM Active View
96. LOADING, UNLOADING AND SPREADING OF FILLING AT 60L OF CHIKLA-B SECTION AT CHIKLA MINE( TE-10 Dt.14072018) 14-07-2018 21-07-2018 21-07-2018 21-07-2018 4:30 PM Active View
97. Maintenance and operation of water supply scheme at chikla mine(TE/CH/MECH/18-19/216) 14-07-2018 21-07-2018 21-07-2018 21-07-2018 03:30 PM Active View
98. Supply of Conveyor Belt, 600 mm width ,115 Mtrs for Crushing and Screening PLANT CHIKLA MINE(TE/CH/MECH/18-19/217) 14-07-2018 21-07-2018 21-07-2018 21-07-2018 03:30 PM Active View
99. Blanket Rate Contract of Esab Make welding Accessories and industrial Gas Equipment(PUR/MOIL/C-3/16/E-22/378-M DT.12/07/2018) 13-07-2018 25-07-2018 25-07-2018 25-07-2018 03:30 PM Active View
100. PVC PIPE 12mm and 20mm(PUR-MOIl-C-1-196-WE-62-ET-178 dt.13.07.2018) 13-07-2018 06-08-2018 06-08-2018 07-08-2018 03:30 PM Active View

Tenders More Information

Details of Purchase Order issued by MATERIALS DEPARTMENT valuing Rs.30.00 Lakhs & Above


List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website)

View (2025) Year Tenders
View (2024) Year Tenders
View (2023) Year Tenders
View (2022) Year Tenders
View (2021) Year Tenders
View (2020) Year Tenders
View (2019) Year Tenders
View (2018) Year Tenders
View (2017) Year Tenders
View (2016) Year Tenders
View (2015) Year Tenders
View (2014) Year Tenders
View (2013) Year Tenders
View (2012) Year Tenders
View (205) Year Tenders
View (24) Year Tenders
View Full Tender Archive
See all MOIL tender.